BLD-Framing/Rough-in | 8/12/2020 | 8/13/2020 | 8/13/2020 | A | PART |
Tell Riley
|
|
|
Eric- */Screened*/ Phone #: ###-####//areas previously walked with MEPs passed ok to cover//added studs and ceiling wires verified via photos/virtually//
|
BLD-Framing/Rough-in | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PART |
Tell Riley
|
|
|
Eric *screened Phone #: ###-####//framing ok in areas of bathrroms, training rooms not associated with MEPs//call for cover when MEPs are approved//
|
Issue PAID IN FULL permit | | | 7/16/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/11/2020 | 6/14/2020 | 6/12/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 6/12/2020 | | DONE |
|
|
|
MET Quinn Mendiola
Need GC
Need Rev Value
|
Routing - FIRE | 6/3/2020 | 6/3/2020 | 6/11/2020 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems.
|
Plan assigned to (JG) | 6/3/2020 | 6/3/2020 | 6/11/2020 | | PASS |
Javier Guzman
|
|
|
06/12 **Expedited School Review** Centennial High School ePlan
|
Routing - PLAN CHECK | 6/3/2020 | | 6/11/2020 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 6/11/2020 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2020 | | DONE |
|
|
|
|
Routing - ELECTRICAL | 6/11/2020 | | 6/11/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2020 | | 6/5/2020 | | PASS |
Morgan Webb
|
|
|
CREDIT FOR DEMO. NO NEW FEES. CREDIT STILL EXISTING
|
Routing - MECHANICAL | 6/3/2020 | | 6/4/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 6/3/2020 | | 6/3/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 6/3/2020 | | 6/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 6/1/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 5/28/2020 | | FAIL |
Julie Romig
|
|
|
1. New windows in Gym have fire rated glazing, but code plans do not show any rated walls. Identify locations of rated walls and type of rating (hour rating, fire wall, fire barrier, etc) on Code Sheets.
|
Application received | | | 5/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 27 2020 12:33PM
|