Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD20-01745
StatusIssued
Name STRITE DESIGN & REMODEL
Site Address 2763 N WOODVIEW PL
Project NameVeigel-Patterson Wall Demo
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI FOOTHILLS. ***PLAN MOD 6-26-20 - Removing existing bearing wall and replacing with beam (See engineering); modifying existing trusses as needed/required (Truss engineering to be provided on site); remodeling Kitchen as per plans. Separate electrical, plumbing and mechanical permits are required. ***Permit to remove gypsum board, cabinetry, fixtures as needed/required at kitchen/nook/living room per plans. NO WALLS TO BE REMOVED. Demolition permit only.Structural plans and proposed remodel to be provided prior to any other work. All work to be done as per plans, notes, review notes and local codes. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in7/16/20207/17/20207/17/2020APASS
DetailsBrandon Shaw
OK to cover, pending Mec cover approval for gas insert...
Plan assigned to (BJM)6/24/20206/24/20206/26/2020 DONE
DetailsBrian McGowan
1st Review Complete- 06/30- Plan Modification:

1. Uploading new site engineering and beam callout
Routing - PLAN CHECK6/25/2020 6/26/2020 FAIL
DetailsBrian McGowan
Plan Reviewer's activity  6/26/2020 DONE
DetailsBrian McGowan
ESC- NO ENERGY- NO
Routing - PLAN CHECK6/26/2020 6/26/2020 PASS
DetailsBrian McGowan
Permit Ready to Issue  6/26/2020 DONE
plan mod
CHANGE STATUS TO (ISS)  6/26/2020 DONE
Plan Modification Accepted  6/24/2020 DONE
Per Sarah Strite Design, opening for plan 1. Uploading new site engineering and beam callout
Issue PAID IN FULL permit  6/16/2020 DONE
Inspection Record Card- Bld  6/16/2020 DONE
Plan assigned to (BJM)6/12/20206/12/20206/15/2020 DONE
DetailsBrian McGowan
06.04 remodel, ePlan
1st review completed  6/15/2020 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  6/15/2020 DONE
DetailsBrian McGowan
Permit Ready to Issue  6/15/2020 DONE
MET
Routing - PLAN CHECK5/29/2020 6/15/2020 PASS
DetailsBrian McGowan
Plan assigned to (JAB) Josh5/29/20205/29/20205/29/2020 DEFR
DetailsJosh Bogle
06.04 remodel, ePlan
Intake Approval  5/29/2020 PASS
Application received  5/27/2020 DONE
Application submitted via PDS Online on May 27 2020 3:44PM