BLD-Framing/Rough-in | 8/12/2020 | 8/13/2020 | 8/13/2020 | A | PEND |
Tony Young
|
|
|
screened // Dustin Phone #: ###-####
|
BLD-Framing/Rough-in | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PEND |
Tony Young
|
|
|
screened // Dustin Phone #: ###-####
|
BLD-Framing/Rough-in | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PART |
Tony Young
|
|
|
screened // Dustin Phone #: ###-####// probably needs one more electrical inspection// seal pack will be done with foam insulation// needs fire blocks,, ok to insulate after electrical reinspection
|
BLD-Wall Bracing | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Tony Young
|
|
|
screened // Dustin Phone #: ###-####
|
Routing - PLANNING | 7/15/2020 | | 7/22/2020 | | PASS |
Michaella Owens
|
|
|
see michaella owens sign off for routing design review
|
Permit Ready to Issue | | | 7/22/2020 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 7/22/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 7/6/2020 | 7/6/2020 | 7/21/2020 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/21/2020 | | 7/21/2020 | | PASS |
Josh Bogle
|
|
|
fee per added value
|
Plan Reviewer's activity | | | 7/16/2020 | | DONE |
Josh Bogle
|
|
|
phone conversation with Dustin about roof framing
|
Routing - Design Review | 7/16/2020 | | 7/16/2020 | | PASS |
Michaella Owens
|
|
|
|
BLD-Conference | 7/8/2020 | 7/9/2020 | 7/9/2020 | A | DONE |
Tony Young
|
|
|
need to stop exterior work
|
Telephone call | | | 7/9/2020 | | DONE |
|
|
|
emailed Michaela and Josh to try to agree on the best way to proceed with the plan modification.
|
Telephone call | | | 7/9/2020 | | DONE |
|
|
|
Dustin spoke with Ted Vanegas and he does NOT need to amend his C of A, he just need to resubmit drawings in the plan mod. We will route it to Michaela and Josh.
|
Plan Reviewer's activity | | | 7/8/2020 | | DONE |
Josh Bogle
|
|
|
Please route to MSO & JAB
|
BLD-Conference | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PART |
Tony Young
|
|
|
Dustin, job ?s; Phone #: ###-####// frame ?s,, adding headers,, beefing up rafters,, needs to add to permit the scope of work
|
Plan Modification Accepted | | | 7/6/2020 | | DONE |
|
|
|
Dustin called requesting a plan modification for roof, windows, siding. I told him to upload the 428 application into the documents folder of ePlan when he gets that invite.
|
Telephone call | | | 6/26/2020 | | DONE |
|
|
|
Emailed a reminder to the GC to please sign the permits and email it back to me, so we can release the approved plans.
|
Issue PAID IN FULL permit | | | 6/22/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/22/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/1/2020 | 6/1/2020 | 6/19/2020 | | PASS |
Josh Bogle
|
|
|
06/05 remodel, ePlan - JAB has begun this
|
Routing - PLAN CHECK | 6/1/2020 | | 6/19/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/19/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/19/2020 | | DONE |
|
|
|
MET
|
Plans ACCEPTED BY PLAN TECH | | | 6/1/2020 | | DONE |
|
|
|
|
Intake Approval | | | 6/1/2020 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/1/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/29/2020 | | FAIL |
|
|
|
It looks like the original packet had 4 pages and only 3 pages where uploaded. I believe the elevations plan needs to be re uploaded with the correct file name and as a single file.
|
Intake Approval | | | 5/28/2020 | | FAIL |
|
|
|
Please upload all drawings as individual files. Name each file according to what is on the page. Ex. DWG_Roof Framing Plan, DWG_ Bracket Detail. Follow all E-plan Review submittal standards, including uploaded all sheets as Landscape if building plans.
|
Application received | | | 5/27/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 27 2020 4:21PM
|
Routing - PLAN CHECK | 7/13/2020 | | | | |
Josh Bogle
|
|
|
|