BLD-Final | 8/13/2020 | 8/14/2020 | 8/13/2020 | A | PASS |
Mike Jordan
|
|
|
*screened* Zach Phone #: ###-####
|
FIRE-Final Inspection | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, locking hardware on sliding glass doors was rem oved during inspection. Final life fire inspection for scope of work is complete, signature card not available at time of inspection.
*screened* Zach Phone #: ###-####
|
BLD-Final | 7/16/2020 | 7/16/2020 | 7/17/2020 | P | PEND |
Dave Hannah
|
|
|
Screened-Zac Phone #: ###-#### ok after fire life saftey finals
|
(F) Reprint permit | | | 7/13/2020 | | DONE |
|
|
|
Reprint permit for Derek to sign
|
Inspection Record Card- Bld | | | 7/13/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/2/2020 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/19/2020 | 6/19/2020 | 6/30/2020 | | PASS |
Javier Guzman
|
|
|
07/01 2nd rev L1 Lobby remodel ePlan
|
Routing - PLAN CHECK | 6/25/2020 | | 6/30/2020 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/30/2020 | | DONE |
|
|
|
all met. (jessica@rrcccontractors.com)
Need GC
Need Revised Values
|
Route to Impact Fee Review | 6/24/2020 | 6/27/2020 | 6/25/2020 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 6/19/2020 | | 6/24/2020 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 6/24/2020 | | FAIL |
Javier Guzman
|
|
|
|
Plan Reviewer's activity | | | 6/18/2020 | | DONE |
Brian McGowan
|
|
|
Spoke with Jeff, he will submit for a second permit for each door. A tenant will be applying for a C of O on a separate permit (Codeworks)
|
Intake Approval | | | 6/18/2020 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 6/16/2020 | | FAIL |
Brian McGowan
|
|
|
Please indicate which space this Permit is being applied to on the drawings.
You will need to provide and submit the required documents and drawings for the second Permit for the remaining space.
|
Intake Approval | | | 6/10/2020 | | FAIL |
Brian McGowan
|
|
|
Please address the following items for your Prescreen to be approved; not all items were provided.
1. A more detailed Key Plan is needed to determine if the addition of the doors are affecting separate Tenant Spaces. If the doors are separating or being added to separate Tenant Spaces, separate Permits will be required.
|
Intake Approval | | | 6/4/2020 | | FAIL |
Brian McGowan
|
|
|
Please address the following items for your Prescreen to be approved;
1. A more detailed Key Plan is needed to determine if the addition of the doors are affecting separate Tenant Spaces. If the doors are separating or being added to separate Tenant Spaces, separate Permits will be required.
2. No Sheet G1.4 is provided showing portable fire extinguishers.
3. No exit signs are shown on the plans.
|
Application received | | | 5/29/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2020 4:21PM
|