Permit Information
Permit NumberBLD20-01807
StatusIssued
Name PREMIER POOLS AND SPAS LLC
Site Address 6199 N BUCKLEY PL
Project NamePoole Pool
Customer Number 
ePlanReviewYes
Description
Permit for a 903sq’ (43x21) shotcrete swimming pool. Barrier requirements per 2015 ISPSC being satisfied with existing fence/gates. All work per plans, engineering, & local code. Separate electrical permit required.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other7/14/20207/15/20207/15/2020ACANC
DetailsTell Riley
Underground gas inspection on gas line between meter and future pool equipment location Phone #: ###-#### Inspection requested via web by Monica McNair//this isnpection needs to be completed under a Mechanical permit for the gas line//
BLD-Footing7/8/20207/9/20207/9/2020APASS
DetailsMike Jordan
** Please speak with Mike Jordan about steel inspection that took place on 7/8/2020**
** Mike Jordan advised us that we are ok to proceed with scheduled shotcrete date of 7/9/2020 as long as we request an AM inspection and we wait to cover deep end and deep end cove to allow for exposure for an AM inspection while shotcrete proceeds as planed **

Rebar inspection on steel in pool in the back yard. Phone #: ###-#### Inspection requested via web by Monica McNair. Issues have been resolved.
BLD-Footing7/7/20207/8/20207/8/2020PFAIL
DetailsMike Jordan
Rebar inspection on steel in back yard. Plans and permits are on site near the future equipment location. If you have any questions please feel free to call Monica at (208) 405.8849 Phone #: ###-#### Inspection requested via web by Monica McNair. Provide minimum 3 inch clearance for reinforcement at deep end of pool.
OVERRIDE  6/19/2020  
Plan assigned to (J_N)6/19/20206/19/20206/19/2020 DONE
DetailsJenny Nelson
Plan assigned to (JAB) Josh6/2/20206/2/20206/19/2020 DEFR
DetailsJosh Bogle
06/08 pool, ePlan
Routing - PLAN CHECK6/2/2020 6/19/2020 PASS
DetailsJenny Nelson
1st review completed  6/19/2020 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  6/19/2020 DONE
DetailsJenny Nelson
ESC Yes, energy no
Permit Ready to Issue  6/19/2020  
all met: trowey@ppas.com

NEED
RP
GC
Telephone call  6/19/2020 DONE
emailed applicant/contractor that we need a form 302 and an RP before we issue this permit
Issue PAID IN FULL permit  6/19/2020 DONE
Inspection Record Card- Bld  6/19/2020 DONE
Application received  6/2/2020 DONE
Application submitted via PDS Online on Jun 2 2020 10:04AM
Plans ACCEPTED BY PLAN TECH  6/2/2020 DONE
Intake Approval  6/2/2020 PASS
Routing - PLANNING6/2/2020 6/2/2020 PASS
DetailsSue Cummings