BLD-Final | 8/11/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Brandon Shaw
|
|
|
Disregard previous entry...
|
DOC - Permit Finaled | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | FAIL |
Brandon Shaw
|
|
|
Window in main floor bathroom to be tempered... Aif/foam seal not done at time of inspection... OK to insulate
|
BLD-Footing | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Brandon Shaw
|
|
|
Footing inspection can be done in the AM tomorrow. Alex will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | FAIL |
Mike Jordan
|
|
|
Footing permit can be done at anytime tomorrow. Subgrade is completed and has been emailed to Melissa and Jason. Thanks! Phone #: ###-#### Inspection requested via web by rich prasch. Footings are not min. 32X32x32 as per the enfineering.
|
PubWorks Subgrade Approval | 6/26/2020 | 6/26/2020 | 6/26/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 6/22/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/22/2020 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2020 | | DONE |
|
|
|
Emailed GC to inform them that planning needs a Harris Ranch approval letter before issuance of this permit.
|
Plan assigned to (JAB) Josh | 6/3/2020 | 6/3/2020 | 6/15/2020 | | PASS |
Josh Bogle
|
|
|
06/09 patio cover, ePlan
|
Routing - PLAN CHECK | 6/3/2020 | | 6/15/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/15/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/15/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/15/2020 | | DONE |
|
|
|
ALL MET
(Approval was forwarded to Katelyn)
NEED HARRIS RANCH REVIEW BOARD APPROVAL BEFORE ISSUANCE PER KATELYN MENUGE
|
Routing PW Grading-Hillside | 6/3/2020 | | 6/8/2020 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 6/3/2020 | | DONE |
|
|
|
|
Intake Approval | | | 6/3/2020 | | PASS |
|
|
|
|
Routing - PLANNING | 6/3/2020 | | 6/3/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2020 | | 6/3/2020 | | PASS |
Candy A. Nichols
|
|
|
|
Application received | | | 6/2/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 2 2020 7:50PM
|