BLD-Final | 8/11/2020 | 8/12/2020 | 8/12/2020 | P | CANC |
Jim Storey
|
|
|
Isaac *screened - please call ahead - Phone #: ###-####
|
BLD-Framing/Rough-in | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | PASS |
Jim Storey
|
|
|
SCREENED // Henrick Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2020 | 7/23/2020 | 7/23/2020 | A | PEND |
Brandon Shaw
|
|
|
Pending trades...
|
BLD-Footing | 7/7/2020 | 7/9/2020 | 7/9/2020 | A | PASS |
Jim Storey
|
|
|
Henrik Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/7/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2020 | | DONE |
|
|
|
met
|
Application received | | 7/2/2020 | 7/2/2020 | | DONE |
|
|
|
New parking is 23 + ft. from PL
|
Plan assigned to (JAB) Josh | 6/15/2020 | 6/15/2020 | 7/2/2020 | | PASS |
Josh Bogle
|
|
|
06/19 addition, ePlan - 1st done
|
Routing - PLAN CHECK | 7/2/2020 | | 7/2/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Plan Reviewer's activity | | | 6/29/2020 | | DONE |
Josh Bogle
|
|
|
rejected resubmittal
|
Routing - PLANNING | 6/29/2020 | | 6/29/2020 | | FAIL |
Sue Cummings
|
|
|
The footprint of the building looks the some in both site plans
|
Routing - PLAN CHECK | 6/15/2020 | | 6/25/2020 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 6/25/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 6/16/2020 | | 6/16/2020 | | PASS |
Sue Cummings
|
|
|
Provided new site plan showing 2 parking spaces outside setbacks 6/16/2020
|
Routing - PLANNING | 6/15/2020 | | 6/15/2020 | | FAIL |
Sue Cummings
|
|
|
Two parking spaces must replace the lost parking. They cannont be in the street nor within the 20 ft. setback
|
Plans ACCEPTED BY PLAN TECH | | | 6/15/2020 | | DONE |
|
|
|
|
Intake Approval | | | 6/15/2020 | | PASS |
|
|
|
|
Application received | | | 6/8/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 8 2020 8:39AM
|
Intake Approval | | | 6/8/2020 | | FAIL |
|
|
|
Plans in the drawing folder must be uploaded as individual sheets with file names that show what is on the plan. (example A1 Site Plan or Site Plan)
|