BLD-Footing | 7/27/2020 | 7/28/2020 | 7/28/2020 | P | PASS |
Tony Young
|
|
|
rebar SCREENED // Brea Phone #: ###-####
|
PubWorks Subgrade Approval | 7/28/2020 | 7/28/2020 | 7/28/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/24/2020 | 7/27/2020 | 7/27/2020 | P | PEND |
Tony Young
|
|
|
rebar SCREENED // Brea Phone #: ###-####
|
BLD-Footing | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | NR |
Tony Young
|
|
|
rebar SCREENED // Brea Phone #: ###-####// still waiting on soils approval
|
BLD-Footing | 7/23/2020 | 7/24/2020 | 7/24/2020 | A | NR |
Tony Young
|
|
|
rebar SCREENED // Brea Phone #: ###-####// still needs soils approval
|
BLD-Footing | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PEND |
Tony Young
|
|
|
rebar SCREENED // Brea Phone #: ###-####
|
BLD-Footing | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | NR |
Tony Young
|
|
|
rebar SCREENED // Brea Phone #: ###-####// still needs soils approval
|
BLD-Foundation | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | NR |
Tony Young
|
|
|
rebar SCREENED // Brea Phone #: ###-####// needs hillside soils apprval,, electrical pass 1st
|
Issue PAID IN FULL permit | | | 7/15/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/7/2020 | | |
|
|
|
|
Telephone call | | | 7/7/2020 | | DONE |
|
|
|
gc called morning of 7/7/2020 and was informed about fees
|
Permit Ready to Issue | | | 7/7/2020 | | DONE |
|
|
|
met: cooper@northenddevelopment.com
Need
GC Form
|
Plan assigned to (JAB) Josh | 6/18/2020 | 6/18/2020 | 7/6/2020 | | PASS |
Josh Bogle
|
|
|
06/24 pool, ePlan
|
Routing - Erosion and Sediment | 6/30/2020 | | 7/6/2020 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request approved. ESC plan not included, only Geotechnical Report (which was labeled as an ESC plan)
|
1st review completed | | | 7/6/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Routing - PLAN CHECK | 6/18/2020 | | 6/30/2020 | | PASS |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 6/30/2020 | | DONE |
Josh Bogle
|
|
|
added missing ESC routings
|
Routing - PLANNING | 6/18/2020 | | 6/19/2020 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 6/18/2020 | | 6/19/2020 | | PASS |
Candy A. Nichols
|
|
|
POOL
|
Routing PW Grading-Hillside | 6/19/2020 | | 6/19/2020 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. If you have any questions call Jason Taylor ###-####.
|
Intake Approval | | | 6/18/2020 | | PASS |
|
|
|
|
Intake Approval | | | 6/17/2020 | | FAIL |
|
|
|
Please upload all drawing in the drawing folders as separate files.
Please upload a copy of the erosion plan into the drawings folder.
|
Application received | | | 6/10/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 10 2020 2:33PM
|