Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD20-01921
StatusFinaled
Name LYLE VANOSDALL
Site Address 9285 W LANDMARK ST
Project NamePrzemielewski PV
Customer Number 
ePlanReviewYes
Description
Permit for 542.5 sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 31 panels in 3 arrays. No work needed to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **D_S**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/23/20206/23/20206/23/2020PDONE
DetailsTell Riley
Corrections have been made to drawings on site. Please contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### if you have any questions. Thank you. Inspection requested via web by Rob Maes
DOC - Permit Finaled6/23/20206/23/20206/23/2020PPASS
DetailsTell Riley
setbacks were discussed with Josh at plan review and appear to still be within minimum required by city code//final complete//
BLD-Final6/19/20206/19/20206/19/2020AFAIL
DetailsTell Riley
need to provide plan for fire setbacks on solar// plan needs to be approved by plan review//
BLD-Final6/17/20206/18/20206/19/2020ACANC
DetailsTell Riley
BLD-Final6/16/20206/17/20206/17/2020PNR
DetailsTell Riley
Please contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior if you have any questions. Thanks in advance, Rob Inspection requested via web by Rob Maes//Electrical did not pass// rescheduled for tomorrow//
BLD-Final6/15/20206/16/20206/16/2020PCANC
DetailsTell Riley
Pls contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior as someone will need to meet inspector on site. Thanks in advance. >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
Plan assigned to (D_S) Debbie6/12/20206/12/20206/12/2020 DONE
DetailsDebbie Sanine
Plan assigned to (JAB) Josh6/12/20206/12/20206/12/2020 DEFR
DetailsJosh Bogle
Routing - PLAN CHECK6/12/2020 6/12/2020 PASS
DetailsJosh Bogle
ESC-N Energy-N
Routing - PLANNING6/12/2020 6/12/2020 PASS
DetailsSue Cummings
Telephone call  6/12/2020 DONE
spoke with applicant and he gave me the RCT over the phone, he had entered in the electrical contractors license.
Plans ACCEPTED BY PLAN TECH  6/12/2020 DONE
Intake Approval  6/12/2020 PASS
Recd Pcfee & Taken To Pln CK  6/12/2020 DONE
1st review completed  6/12/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  6/12/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  6/12/2020 DONE
Issue PAID IN FULL permit  6/12/2020 DONE
Inspection Record Card- Bld  6/12/2020 DONE
Application received  6/11/2020 DONE
Application submitted via PDS Online on Jun 11 2020 11:26AM
Intake Approval  6/11/2020 FAIL
1st Prescreen-
1. The drawings you uploaded- DWG - Single Line Diagram and DWG - Stie map came through blank. Please upload again
2. The drawings will need to be uploaded in landscape format.