Permit Information
Permit NumberBLD20-01923
StatusFinaled
Name LYLE VANOSDALL
Site Address 11634 W HALSTEAD AVE
Project NamePeterson PV
Customer Number 
ePlanReviewYes
Description
Permit for 630 sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 36 panels in 3 arrays. No work needed to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **D_S**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/7/20207/8/20207/8/2020PDONE
DetailsMike Jordan
Sorry Tell. Plans will be onsite for this inspection. We accidently provided the plans to the homeowner. If you have any questions, please call Eric @ ###-####. Thanks in advance, Rob Inspection requested via web by Rob Maes
DOC - Permit Finaled7/8/20207/8/20207/8/2020PPASS
DetailsMike Jordan
BLD-Final7/6/20207/7/20207/7/2020AFAIL
DetailsTell Riley
Pls contact Bryce @ ###-#### if you have any questions. Thanks, Rob Inspection requested via web by Rob Maes//no plans onsite--checked around disconnect box//
Issue PAID IN FULL permit  6/25/2020 DONE
Plan assigned to (D_S) Debbie6/24/20206/24/20206/24/2020 DONE
DetailsDebbie Sanine
Plan assigned to (JAB) Josh6/18/20206/18/20206/24/2020 DEFR
DetailsJosh Bogle
06/24 PV, ePlan
Routing - PLAN CHECK6/18/2020 6/24/2020 PASS
DetailsJosh Bogle
Energy-N ESC-N
1st review completed  6/24/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  6/24/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  6/24/2020 DONE
met
Intake Approval  6/18/2020 PASS
Routing - PLANNING6/18/2020 6/18/2020 PASS
DetailsSue Cummings
Intake Approval  6/12/2020 FAIL
1st Prescreen- please provide a detail site plan, showing streets, driveways and set backs.
Telephone call  6/12/2020 DONE
email applicant to submit a 302 form and add the GC company in the future applications, applicant added ELE contractors number again.
Application received  6/11/2020 DONE
Application submitted via PDS Online on Jun 11 2020 1:06PM