BLD-Foundation | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PART |
Tell Riley
|
|
|
Screened- stem wall inspection- Jeff Phone #: ###-####//rear setbacksare tight at 15'-measured from string line offset 5' from pins//will need to maintain 15' setback during construction//rebar per plans//WIP//
|
BLD-Foundation | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | FAIL |
Tell Riley
|
|
|
screened // Jeff Phone #: ###-####//footings poured without inspection//wall appears to meet plans//rear setbacks appear to only be 14' 8" from property line--asked contractor to run an offset line parallel to property line to get an acurate measurement//will need to meet 15' rear setback//
|
Inspection Record Card- Bld | | | 8/3/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2020 | | DONE |
|
|
|
|
BLD-Footing | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | FAIL |
Brandon Shaw
|
|
|
Permit has not been issued...
|
Plan assigned to (JAB) Josh | 6/22/2020 | 6/22/2020 | 7/30/2020 | | PASS |
Josh Bogle
|
|
|
06/26 addition, ePlan - 1st done
|
Permit Ready to Issue | | | 7/30/2020 | | DONE |
|
|
|
Met GC
Met RP (if owner not GC)
|
Telephone call | | | 7/30/2020 | | DONE |
|
|
|
called inspector to informed that this permit has not been ISS
|
Telephone call | | | 7/30/2020 | | DONE |
|
|
|
sent email to arc. that we need to 302 from GC (& RP info) or owner since they were not the ones who applied for permit
|
Routing - PLAN CHECK | 7/28/2020 | | 7/30/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2020 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Routing - PLANNING | 7/28/2020 | | 7/29/2020 | | PASS |
Sue Cummings
|
|
|
Driveway can be alphalt, concrete or wheel strips
|
Plan Reviewer's activity | | | 7/28/2020 | | DONE |
Josh Bogle
|
|
|
rejected resubmittal - plans not versioned correctly
|
Plan Reviewer's activity | | | 7/28/2020 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittal
|
1st review completed | | | 7/6/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/22/2020 | | 7/6/2020 | | FAIL |
Josh Bogle
|
|
|
needs full engineering
|
Intake Approval | | | 6/22/2020 | | |
|
|
|
|
Application received | | | 6/15/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 15 2020 9:04AM
|
Routing - PLANNING | 6/22/2020 | | | | |
|
|
|
|