Permit Information
Permit NumberBLD20-01980
StatusIssued
Name SUSTAINABLE HOLDINGS LLC
Site Address 7024 E LOS CARNEROS DR
Project NameFinis Terra Lot 3
Customer Number 
ePlanReviewYes
Description
**WUI VALLEY ZONE B REQUIREMENTS**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 2070 sq. ft., one story Single Family Dwelling Unit with 3 bedrooms, 2.5 bathrooms, approximately 580 sq. ft of patio/courtyard, and a 678 sq. ft. attached garage per the approved plans and any notations. R-1CDA zoning and setbacks per planning. **D_S***Sprinklers are not required***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing8/10/20208/10/20208/10/2020PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing8/5/20208/6/20208/6/2020ANH
DetailsBrandon Shaw
Need soil subgrade submitted and approved by PW...
PubWorks Subgrade Approval8/6/20208/6/20208/6/2020 DONE
DetailsJason C. Taylor
* FOOTINGS ONLY NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Inspection Record Card- Bld  7/28/2020 DONE
Issue PAID IN FULL permit  7/27/2020 DONE
OVERRIDE  7/21/2020  
Plan assigned to (D_S) Debbie7/1/20207/1/20207/21/2020 DONE
DetailsDebbie Sanine
PLANS/APPL TAKEN TO FRONT DESK  7/21/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  7/21/2020 DONE
met
NEED
GC FORM
met- RP (IF PARCEL OWNER IS NOT GC)
Routing - PLANNING7/20/2020 7/20/2020 PASS
DetailsKarla Nelson
Correction affidavit for Subdivision Plat correction provided.
1st review completed  7/15/2020 DONE
DetailsDebbie Sanine
Routing - PLAN CHECK7/1/2020 7/15/2020 PASS
DetailsDebbie Sanine
Routing PW Grading-Hillside7/1/2020 7/14/2020 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Routing - Erosion and Sediment7/1/2020 7/6/2020 PASS
DetailsAndy J. Long
ESC site plan and narrative submitted. ESC site preparation inspection is required before excavation and after BMP installation
Routing - MECHANICAL7/1/2020 7/6/2020 PASS
DetailsTroy James
Routing - PLANNING7/1/2020 7/6/2020 FAIL
DetailsKarla Nelson
A 18' easement is shown on the back of the lot.
Route to Impact Fee Review7/1/20207/4/20207/2/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - FIRE7/1/20207/1/20207/1/2020 PASS
DetailsLee G Meredith
New SFH

Sprinklers are not required. All measurements are within limits. No review comments.
Intake Approval  7/1/2020 PASS
Routing - Addressing7/1/2020 7/1/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/1/2020 7/1/2020 PASS
DetailsCandy A. Nichols
NO OCCUPANCY UNTUIL SEWER LIFT STATION COMPLETED
Intake Approval  6/23/2020 FAIL
Please wait to resubmit until you have uploaded the Manual J.
Intake Approval  6/19/2020 FAIL
1.This parcel is in the hillside a 404 application needs to be uploaded into the documents folder.
2. Manual J
3. Erosion and Sediment narrative
4. Soils and geotechnical report.
5. Site Specific Fire flow at hydrants letter from local water company.
Intake Approval  6/18/2020 FAIL
Failed first prescreen: The applicant has requested that all drawings are deleted as there is a design change.
Application received  6/15/2020 DONE
Application submitted via PDS Online on Jun 15 2020 12:05PM