Permit Information
Permit NumberBLD20-01982
StatusIssued
Name SUSTAINABLE HOLDINGS LLC
Site Address 7038 E LOS CARNEROS DR
Project NameFinis Terra Lot 4
Customer Number 
ePlanReviewYes
Description
**WUI VALLEY ZONE B REQUIREMENTS**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 2052 sq. ft., one-story single-family dwelling with 2 bedrooms, 2.5 bathrooms, approximately 280 sq. ft. of courtyard patio and a 688 sq. ft. attached garage per the approved plans and any notations. R-1CDA zoning and setbacks per planning.**D_S***Sprinklers are not required***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing8/10/20208/10/20208/10/2020PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing8/5/20208/6/20208/6/2020PCANC
DetailsBrandon Shaw
Chris *screened* Phone #: ###-####
PubWorks Subgrade Approval8/6/20208/6/20208/6/2020 DONE
DetailsJason C. Taylor
* FOOTINGS ONLY NO COLUMNS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  7/27/2020 DONE
Inspection Record Card- Bld  7/27/2020 DONE
Inspection Record Card- Bld  7/27/2020 DONE
OVERRIDE  7/24/2020  
Plan assigned to (D_S) Debbie7/1/20207/1/20207/24/2020 DONE
DetailsDebbie Sanine
Routing - PLANNING7/24/2020 7/24/2020 PASS
DetailsDavid Moser
PLANS/APPL TAKEN TO FRONT DESK  7/24/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  7/24/2020 DONE
ALL MET-
NEED-
GC FORM (sent email to owner doneil@grboise.com)
1st review completed  7/16/2020 DONE
DetailsDebbie Sanine
Routing - PLAN CHECK7/1/2020 7/16/2020 PASS
DetailsDebbie Sanine
Routing PW Grading-Hillside7/1/2020 7/14/2020 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Routing - PLANNING7/1/2020 7/8/2020 FAIL
DetailsDavid Moser
The house is built over a 18 foot storm drainage easement across the back of the parcel which is recorded on the final plat
Routing - MECHANICAL7/1/2020 7/6/2020 PASS
DetailsTroy James
Routing - Erosion and Sediment7/1/2020 7/6/2020 PASS
DetailsAndy J. Long
ESC site plan and narrative submitted. ESC site preparation inspection is required before excavation and after BMP installation
Route to Impact Fee Review7/1/20207/4/20207/2/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - FIRE7/1/20207/1/20207/1/2020 PASS
DetailsLee G Meredith
New SFH

Sprinklers are not required. All measurements are within limits. No review comments.
Intake Approval  7/1/2020 PASS
Routing - Addressing7/1/2020 7/1/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/1/2020 7/1/2020 PASS
DetailsCandy A. Nichols
NO OCCUPANCY UNTUIL SEWER LIFT STATION COMPLETED
Intake Approval  6/23/2020 FAIL
1. Need Geotech Report
2. Manual J
3. Site Specific Fire Flow at Hydrants Letter from local water provider.
4. Erosion Narrative
5. Please fill out a 404 application (not 402) and checklist upload it into the documents folder.
Telephone call  6/19/2020 DONE
Applicant requested all documents and drawings be deleted and returned to him for upload task.
Telephone call  6/19/2020 DONE
Called Dalton to let him know he needs a 404 application and checklist. Had already gone to hillside, so he will email me those applications and I will upload.
Application received  6/15/2020 DONE
Application submitted via PDS Online on Jun 15 2020 12:23PM