BLD-Framing/Rough-in | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | FAIL |
Tell Riley
|
|
|
Framing and sheer inspection. Phone #: ###-#### Inspection requested via web by sergio molina//shear only as trades rough ins are not complete or inspected//need to add hot dip galvanized nails at pressure treated plates//need to block all panel breaks at shear locations//add anchor bolts//CN left with permit paper work near washer box//
|
Telephone call | | | 7/15/2020 | | DONE |
|
|
|
emailed the GC a reminder to please sign the permit and email it back.
|
Issue PAID IN FULL permit | | | 7/10/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/9/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/25/2020 | 6/25/2020 | 7/8/2020 | | PASS |
Josh Bogle
|
|
|
07/01 fire repair - under review by JAB
|
Routing - PLAN CHECK | 6/25/2020 | | 7/8/2020 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/8/2020 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Intake Approval | | | 6/25/2020 | | PASS |
|
|
|
|
Routing - PLANNING | 6/25/2020 | | 6/25/2020 | | PASS |
Crystal Rain
|
|
|
|
Intake Approval | | | 6/22/2020 | | FAIL |
|
|
|
1st- prescreen
1. Please upload all drawings as individual files. Name each file according to what is on the page. Ex. DWG_Roof Framing Plan, DWG_ Bracket Detail. Follow all E-plan Review submittal standards, including uploaded all sheets as Landscape if building plans.
|
Application received | | | 6/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 16 2020 4:14PM
|