BLD-Wall cover | 8/12/2020 | 8/13/2020 | 8/13/2020 | P | NH |
Jim Storey
|
|
|
Lock box code 7326 Jim Storey is NOT permitted on my properties. Thanks. Phone #: ###-#### Inspection requested via web by Nick Schuler/// Window no alowed on prop. jstorey
|
BLD-Wall cover | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | FAIL |
Brandon Shaw
|
|
|
Reminder Jim Storey is NOT permitted on my properties. Window in main floor bathroom to be tempered... Aif/foam seal not done at time of inspection... OK to insulate
|
BLD-Framing/Rough-in | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | FAIL |
Jim Storey
|
|
|
Minor framing added to make a bedroom and fir some walls out for plumbing etc. Not sure if it needs inspected. If it does please inspect. Phone #: ###-#### Inspection requested via web by Nick Schuler sd/trade sign offs
|
BLD-Wall cover | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Nick Schuler
|
BLD-Framing/Rough-in | 7/29/2020 | 7/30/2020 | 7/30/2020 | A | NR |
Dave Hannah
|
|
|
Minor framing added to make a bedroom and fir some walls out for plumbing etc. Not sure if it needs inspected. If it does please inspect. Phone #: ###-#### Inspection requested via web by Nick Schuler needs trade rough ins
|
Permit Ready to Issue | | | 7/29/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/29/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/29/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/18/2020 | 6/18/2020 | 7/28/2020 | | PASS |
Josh Bogle
|
|
|
06/24 remodel, ePlan - 1st done
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - MECHANICAL | 7/24/2020 | | 7/28/2020 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLAN CHECK | 7/24/2020 | | 7/24/2020 | | PASS |
Josh Bogle
|
|
|
|
Plan Reviewer's activity | | | 7/24/2020 | | DONE |
Josh Bogle
|
|
|
uploaded ACCA report, accepted resubmittal, and routed
|
Plan Reviewer's activity | | | 7/7/2020 | | DONE |
Josh Bogle
|
|
|
returned resubmittal - called Nick
|
Routing - PLAN CHECK | 6/18/2020 | | 6/30/2020 | | FAIL |
Josh Bogle
|
|
|
see notes in ePlan
|
1st review completed | | | 6/30/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 6/18/2020 | | 6/25/2020 | | PASS |
Sue Cummings
|
|
|
Receive a site plan 6/25/2020
|
Telephone call | | | 6/19/2020 | | DONE |
|
|
|
spoke with applicant who says he discussed requirements with Josh. egress dimensions and header info in docs in eplan.
|
Intake Approval | | | 6/18/2020 | | PASS |
|
|
|
|
Intake Approval | | | 6/17/2020 | | FAIL |
|
|
|
please upload plans as a PDF, we cannot accept jpeg.
please rotate plans and please provide a before and after full floor plan of remodel. if you are adding on to the home you will need to provide a site plan showing the home on the full property and showing the measurements from the addition to all the property lines
|
Application received | | | 6/16/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 16 2020 10:53PM
|