BLD-Final | 7/24/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Brandon Shaw
|
|
|
Revised plans are onsite. Call our onsite contact, the phone number provided for access. Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Brandon Shaw
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/17/2020 | | DONE |
|
|
|
|
Plan assigned to (D_S) Debbie | 7/15/2020 | 7/15/2020 | 7/16/2020 | | DONE |
Debbie Sanine
|
|
|
plan mod
|
Routing - PLAN CHECK | 7/16/2020 | | 7/16/2020 | | PASS |
Debbie Sanine
|
|
|
No building review plan mod fee to be charged.
|
Permit Ready to Issue | | | 7/16/2020 | | DONE |
|
|
|
PLAN MOD- do not issue
|
Plan Modification Accepted | | | 7/15/2020 | | DONE |
|
|
|
Changing the lay out of the plans.
|
BLD-Framing/Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 | P | CANC |
Brandon Shaw
|
|
|
No work needed to strengthen the existing roof structure per engineer’s roof evaluation.
|
Issue PAID IN FULL permit | | | 6/18/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/18/2020 | | DONE |
|
|
|
|
Application received | | | 6/17/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2020 7:02AM
|
Plan assigned to (JAB) Josh | 6/17/2020 | 6/17/2020 | 6/17/2020 | | DEFR |
Josh Bogle
|
|
|
|
Plan assigned to (D_S) Debbie | 6/17/2020 | 6/17/2020 | 6/17/2020 | | DONE |
Debbie Sanine
|
|
|
|
1st review completed | | | 6/17/2020 | | DONE |
Debbie Sanine
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 6/17/2020 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 6/17/2020 | | 6/17/2020 | | PASS |
Josh Bogle
|
|
|
ESC-N Energy-N
|
Routing - PLANNING | 6/17/2020 | | 6/17/2020 | | PASS |
Jeff Lowe
|
|
|
|
Intake Approval | | | 6/17/2020 | | PASS |
|
|
|
|