Permit Information
Permit NumberBLD20-02041
StatusIssued
Name BRIGHT STAR ENERGY MANAGEMENT LLC
Site Address 5028 N THORTON LN
Project NameSenary Point Lot 6
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2854 sq. ft., two story (first story 1682 sq. ft., second story 1172 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 602 sq. ft. of covered patio/porch and a 626 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing8/4/20208/4/20208/4/2020PPASS
DetailsTony Young
Screened- Pat Phone #: ###-####
BLD-Footing8/3/20208/4/20208/4/2020ANR
DetailsTony Young
Screened- Pat Phone #: ###-####// needs reviewed plans
BLD-Footing7/31/20208/3/20208/3/2020PNR
DetailsTony Young
SCREENED // Pat Phone #: ###-####
OVERRIDE  7/30/2020  
Telephone call  7/30/2020 DONE
email sent to the email on the application to inform that NOT all fees were paid.
Issue PAID IN FULL permit  7/30/2020 DONE
Inspection Record Card- Bld  7/30/2020 DONE
Permit Ready to Issue  7/30/2020 DONE
Plan assigned to (RDP)7/6/20207/6/20207/29/2020 DONE
DetailsRob Patrick
07/17 sfd L1 ePlan
Routing - PLAN CHECK7/6/2020 7/29/2020 PASS
DetailsRob Patrick
1st review completed  7/29/2020 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/29/2020 DONE
DetailsRob Patrick
Routing - PLANNING7/6/2020 7/8/2020 PASS
DetailsSue Cummings
Route to Impact Fee Review7/6/20207/9/20207/7/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - PUBLIC WORKS7/6/2020 7/7/2020 PASS
DetailsCandy A. Nichols
Routing - Addressing7/6/2020 7/7/2020 PASS
DetailsDoug Chausow
Routing - MECHANICAL7/6/2020 7/7/2020 PASS
DetailsTroy James
Intake Approval  7/6/2020 PASS
Application received  6/18/2020 DONE
Application submitted via PDS Online on Jun 18 2020 1:07PM
Intake Approval  6/18/2020 FAIL
1st prescreen:
1. Please rename your drawings per ePlan Submittal Standards: https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
and upload.
2. The manual J must have the correct lot and block on it.
3. Please upload the manual j as a single document in the documents folder
4. Please upload the structural calculations as a single document in the documents folder.
Telephone call  6/18/2020 DONE
emailed application to let them know their review would go much faster if they used the proper naming convention and uploaded structural calcs and manual J as single documents in the documets folder.