BLD-Final | 8/4/2020 | 8/5/2020 | 8/5/2020 | A | PASS |
Dave Hannah
|
|
|
noah -*/Screnned*/ Phone #: ###-####
|
DOC - Permit Finaled | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Dave Hannah
|
|
|
|
Plan assigned to (JAB) Josh | 6/29/2020 | 6/29/2020 | 7/17/2020 | | PASS |
Josh Bogle
|
|
|
07/02 egress window - 1st done
|
Routing - PLAN CHECK | 7/17/2020 | | 7/17/2020 | | FAIL |
Josh Bogle
|
|
|
no as-builts or header notation
|
Routing - PLAN CHECK | 7/17/2020 | | 7/17/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/17/2020 | | DONE |
|
|
|
all met
|
Issue PAID IN FULL permit | | | 7/17/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/17/2020 | | DONE |
|
|
|
|
Routing - PLANNING | 6/29/2020 | | 7/16/2020 | | PASS |
Michaella Owens
|
|
|
|
1st review completed | | | 7/6/2020 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/29/2020 | | 7/6/2020 | | FAIL |
Josh Bogle
|
|
|
no review pending Planning approval
|
Intake Approval | | | 6/29/2020 | | FAIL |
|
|
|
1. Please have the setbacks on the site plan (per zoning)
2. All drawings in the drawings folder must be separate files. Atkins Floor has 2 pages.
|
Intake Approval | | | 6/29/2020 | | PASS |
|
|
|
|
Application received | | | 6/19/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 19 2020 1:56PM
|