BLD-Grading Inspection | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | CANC |
Brandon Shaw
|
|
|
Bob Arnold said to call in a crawl space inspection after compaction in done prior to foundation going in. Not sure if this is the correct inspection to call in, please correct me if so. Thank you Phone #: ###-#### Inspection requested via web by Mark Roberts
|
Inspection Record Card- Bld | | | 8/11/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/11/2020 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2020 | | DONE |
|
|
|
Email to get GC Form
|
OVERRIDE | | | 8/7/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 7/30/2020 | 7/30/2020 | 8/7/2020 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 8/4/2020 | | 8/7/2020 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 8/7/2020 | | DONE |
|
|
|
MET GC
|
Plan assigned to (RDP) | 6/30/2020 | 6/30/2020 | 7/30/2020 | | DEFR |
Rob Patrick
|
|
|
07/17 sfd L2 ePlan
|
Routing - PLAN CHECK | 6/30/2020 | | 7/30/2020 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 7/30/2020 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 6/30/2020 | | 7/8/2020 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Route to Impact Fee Review | 6/30/2020 | 7/3/2020 | 7/6/2020 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 6/30/2020 | | 7/6/2020 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative submitted. ESC site preparation inspection is required before excavation and after BMP installation
|
Routing - FIRE | 6/30/2020 | 6/30/2020 | 7/2/2020 | | PASS |
Lee G Meredith
|
|
|
New SFH
Sprinklers are not required. All measurements are within maximum limits. No written review.
|
Routing - MECHANICAL | 6/30/2020 | | 7/2/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/30/2020 | | 7/2/2020 | | PASS |
Crystal Rain
|
|
|
|
Routing - Addressing | 6/30/2020 | | 7/1/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/30/2020 | | 7/1/2020 | | PASS |
Candy A. Nichols
|
|
|
NO OCCUPANCY UNTUIL SEWER LIFT STATION COMPLETED
|
Plan Reviewer's activity | | | 7/1/2020 | | DONE |
|
|
|
Emailed applicant to requres a current fire flow report from Suez. The on initially provided was 2 years old and did not represent the specific area wherethe house is to be built.
7-2-20: Received an updated Suez fire flow report from the applicant.
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2020 | | DONE |
|
|
|
|
Intake Approval | | | 6/30/2020 | | PASS |
|
|
|
|
Application received | | | 6/25/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 25 2020 1:08PM
|
BLD-Footing | 8/13/2020 | 8/14/2020 | | A | |
Brandon Shaw
|
|
|
James *screened Phone #: ###-####
Requested early inspection (before 10:30am)
|