Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD20-02144
StatusIssued
Name CORE BUILDING COMPANY
Site Address 7018 E LA CUESTA ST
Project NameLot 2 Block 2 Finis Terra
Customer Number 
ePlanReviewYes
Description
**WUI VALLEY ZONE B CLASS 'A' ROOF REQUIRED** **HILLSIDE** Permit for the construction of a new 2872 sq. ft., two story (first story 1379 sq. ft., 2nd story 1504 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 310 sq. ft covered porch/patio and a 1008 sq. ft. attached garage per the approved plans and any notations. R1-CDA zoning and setbacks per planning.**JJN** ***Sprinklers are not required***LGM.A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Grading Inspection8/11/20208/11/20208/11/2020PCANC
DetailsBrandon Shaw
Bob Arnold said to call in a crawl space inspection after compaction in done prior to foundation going in. Not sure if this is the correct inspection to call in, please correct me if so.
Thank you Phone #: ###-#### Inspection requested via web by Mark Roberts
Inspection Record Card- Bld  8/11/2020 DONE
Issue PAID IN FULL permit  8/11/2020 DONE
Telephone call  8/10/2020 DONE
Email to get GC Form
OVERRIDE  8/7/2020  
Plan assigned to (J_N)7/30/20207/30/20208/7/2020 DONE
DetailsJenny Nelson
Routing PW Grading-Hillside8/4/2020 8/7/2020 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
PLANS/APPL TAKEN TO FRONT DESK  8/7/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  8/7/2020 DONE
MET GC
Plan assigned to (RDP)6/30/20206/30/20207/30/2020 DEFR
DetailsRob Patrick
07/17 sfd L2 ePlan
Routing - PLAN CHECK6/30/2020 7/30/2020 PASS
DetailsJenny Nelson
1st review completed  7/30/2020 DONE
DetailsJenny Nelson
Routing PW Grading-Hillside6/30/2020 7/8/2020 FAIL
DetailsJason C. Taylor
see changemarks in ePlan. JCT
Route to Impact Fee Review6/30/20207/3/20207/6/2020 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment6/30/2020 7/6/2020 PASS
DetailsAndy J. Long
ESC site plan and narrative submitted. ESC site preparation inspection is required before excavation and after BMP installation
Routing - FIRE6/30/20206/30/20207/2/2020 PASS
DetailsLee G Meredith
New SFH

Sprinklers are not required. All measurements are within maximum limits. No written review.
Routing - MECHANICAL6/30/2020 7/2/2020 PASS
DetailsTroy James
Routing - PLANNING6/30/2020 7/2/2020 PASS
DetailsCrystal Rain
Routing - Addressing6/30/2020 7/1/2020 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/30/2020 7/1/2020 PASS
DetailsCandy A. Nichols
NO OCCUPANCY UNTUIL SEWER LIFT STATION COMPLETED
Plan Reviewer's activity  7/1/2020 DONE
Emailed applicant to requres a current fire flow report from Suez. The on initially provided was 2 years old and did not represent the specific area wherethe house is to be built.

7-2-20: Received an updated Suez fire flow report from the applicant.
Plans ACCEPTED BY PLAN TECH  6/30/2020 DONE
Intake Approval  6/30/2020 PASS
Application received  6/25/2020 DONE
Application submitted via PDS Online on Jun 25 2020 1:08PM
BLD-Footing8/13/20208/14/2020 A 
DetailsBrandon Shaw
James *screened Phone #: ###-####
Requested early inspection (before 10:30am)