Permit Information
Permit NumberBLD20-02217
StatusFinaled
Name TRINITY HOMES
Site Address 747 N EASTRIDGE PL
Project NameMcConnell balcony
Customer Number 
ePlanReviewYes
Description
Permit for a full re-build of existing decks that includes new footings and steel columns supporting the roof. All work per plans, nmanufacturer's specs, engineering, local codes & ordinances. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/12/20208/12/20208/12/2020APASS
DetailsBrandon Shaw
please call when en route. I need to provide access.
later morning if possible
###-#### Phone #: ###-#### Inspection requested via web by Erby Gonzales
DOC - Permit Finaled8/12/20208/12/20208/12/2020PPASS
DetailsBrandon Shaw
PubWorks Subgrade Approval8/10/20208/10/20208/10/2020 DONE
DetailsJason C. Taylor
*Column for deck on West Side of House**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Foundation8/7/20208/7/20208/7/2020APASS
DetailsBrandon Shaw
on site all morning,
###-#### Phone #: ###-#### Inspection requested via web by Erby Gonzales
PubWorks Subgrade Approval8/6/20208/6/20208/6/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing7/29/20207/29/20207/29/2020ANR
DetailsBrandon Shaw
###-#### on site all morning. Phone #: ###-#### Inspection requested via web by Erby Gonzales
BLD-Conference7/22/20207/22/20207/22/2020PDONE
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Erby Gonzales
Issue PAID IN FULL permit  7/22/2020 DONE
Inspection Record Card- Bld  7/22/2020 DONE
Permit Ready to Issue  7/21/2020 DONE
MET
NEED GC - RCE number does not match with what we have in the system
Telephone call  7/21/2020 DONE
emailed Erby@trinityhomesidaho.com about GC
Plan assigned to (JAB) Josh7/6/20207/6/20207/20/2020 PASS
DetailsJosh Bogle
07/10 deck - 1st done
Routing - PLAN CHECK7/20/2020 7/20/2020 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/20/2020 DONE
DetailsJosh Bogle
ESC no - Energy no
1st review completed  7/17/2020 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK7/17/2020 7/17/2020 FAIL
DetailsJosh Bogle
see notes in ePlan
Routing - PLAN CHECK7/6/2020 7/17/2020 FAIL
DetailsJosh Bogle
per our video chat
Routing PW Grading-Hillside7/6/2020 7/8/2020 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Routing - PLANNING7/6/2020 7/7/2020 PASS
DetailsSue Cummings
received site plan 7/7/2020
Routing - PUBLIC WORKS7/6/2020 7/6/2020 PASS
DetailsCandy A. Nichols
Intake Approval  7/6/2020 PASS
Intake Approval  7/2/2020 FAIL
All drawings in the drawings folder must be uploaded as separate files with file names that match what is on the plan. (example A1 Site Plan or Site Plan)
Application received  7/1/2020 DONE
Application submitted via PDS Online on Jul 1 2020 8:18AM