BLD-Footing | 8/12/2020 | 8/13/2020 | 8/13/2020 | A | PASS |
Tony Young
|
|
|
screened // Andrew Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/10/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 8/7/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 8/7/2020 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan assigned to (J_N) | 8/6/2020 | 8/6/2020 | 8/6/2020 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2020 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 8/6/2020 | | 8/6/2020 | | PASS |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 8/6/2020 | | 8/6/2020 | | PASS |
Crystal Rain
|
|
|
|
Plan Modification Accepted | | | 8/5/2020 | | DONE |
|
|
|
plan mod - relocating building. Andrew from AJB
|
Inspection Record Card- Bld | | | 7/30/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/29/2020 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2020 | | DONE |
|
|
|
ESC permit voided per Andy Long
|
Telephone call | | | 7/22/2020 | | DONE |
|
|
|
emailed GC that the RP is no longer needed and that fees are due.
|
OVERRIDE | | | 7/17/2020 | | |
|
|
|
|
OVERRIDE | | | 7/17/2020 | | |
|
|
|
|
Telephone call | | | 7/17/2020 | | DONE |
|
|
|
emailed GC fees due and let them know we need an RP
|
Permit Ready to Issue | | | 7/17/2020 | | DONE |
|
|
|
not needed per Andy Long: Need RP
|
Plan assigned to (J_N) | 7/16/2020 | 7/16/2020 | 7/16/2020 | | DONE |
Jenny Nelson
|
|
|
|
Plan assigned to (JAB) Josh | 7/15/2020 | 7/15/2020 | 7/16/2020 | | DEFR |
Josh Bogle
|
|
|
07/21 garage
|
Routing - PLAN CHECK | 7/15/2020 | | 7/16/2020 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 7/16/2020 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2020 | | DONE |
Jenny Nelson
|
|
|
Energy no, ESC Yes
|
Routing - PLANNING | 7/15/2020 | | 7/15/2020 | | PASS |
Crystal Rain
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/15/2020 | | DONE |
|
|
|
|
Intake Approval | | | 7/15/2020 | | PASS |
|
|
|
|
Intake Approval | | | 7/14/2020 | | FAIL |
|
|
|
The plans uploaded stone elevations and stone plans have more than one page in the file. All drawings in the drawings folder must be uploaded as single files, in the correct orientation and with files names that match what is on that plans. (example Floor Plan)
*Note we have deleted all files in the drawings folder. One file had 4 pages and another had 11.
* our online submittal standards are below.
https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
|
Application received | | | 7/13/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2020 9:07AM
|
Intake Approval | | | 7/13/2020 | | FAIL |
|
|
|
All drawings must be loaded in landscape format.
|