BLD-Final | 8/7/2020 | 8/10/2020 | 8/10/2020 | A | PASS |
Brandon Shaw
|
|
|
Please call Matthew Jones ###-#### prior to arriving Phone #: ###-#### Inspection requested via web by Nicholas Buck
|
DOC - Permit Finaled | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | FAIL |
Tell Riley
|
|
|
Please call Matthew Jones prior to arrival. Phone #: ###-#### Inspection requested via web by Nicholas Buck//need to provide engineered letter for existing roof structure-no notes in description--letter is not with plans//plans do not show setbacks from eaves///CN left with packet//
|
Plan assigned to (BJM) | 8/4/2020 | 8/4/2020 | 8/4/2020 | | DONE |
Brian McGowan
|
|
|
08/05- PV
|
1st review completed | | | 8/4/2020 | | DONE |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 8/4/2020 | | DONE |
Brian McGowan
|
|
|
Energy - No ESC - No
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/4/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/4/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/4/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/30/2020 | | 8/4/2020 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (JAB) Josh | 7/30/2020 | 7/30/2020 | 7/30/2020 | | DEFR |
Josh Bogle
|
|
|
08/05 PV
|
Routing - PLANNING | 7/30/2020 | | 7/30/2020 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 7/30/2020 | | PASS |
|
|
|
|
Application received | | | 7/29/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2020 9:41AM
|