BLD-Final | 8/5/2020 | 8/6/2020 | 8/6/2020 | A | NR |
Dave Hannah
|
|
|
screened // Tanya Phone #: ###-#### needs fire life safty final first
|
FIRE-Final Inspection | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | FAIL |
Jim Page
|
|
|
Install exit signage and emergency lighting, to include exit discharge landing to public way, on level 1 as shown on city approved documents. Fire sprinkler modifications in basement level will be required, room being used as storage has sprinkler heads overspaced for ordinary hazard, two areas will require sprinkler heads to be added. Wires are attached to the fire sprinkler piping, per NFPA13 no external loads shall be applied to fire sprinkler piping. Fire sprinkler head in basement bathroom is painted, per NFPA13 the fire sprinkler head will required to be replaced. Any and all modifications to the fire sprinkler system will require a seperate permit. Provide fire extinguisher for basement level.
screened // Tanya Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/4/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/4/2020 | | DONE |
|
|
|
|
Telephone call | | | 8/4/2020 | | DONE |
|
|
|
email permit to be signed to- scot@lsmj-law.com, mike@tokcommercial.com and tanya@tokcommercial.com
Approval plans (in Doc) and inspection card will need to be email to applicant
|
Plan assigned to (CJW) | 7/30/2020 | 7/30/2020 | 8/3/2020 | | PASS |
Carl Westfall
|
|
|
occupancy
|
Routing - PLAN CHECK | 7/30/2020 | | 8/3/2020 | | PASS |
Carl Westfall
|
|
|
Occupancy permit prepared
|
1st review completed | | | 8/3/2020 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2020 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 7/30/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/2020 | | DONE |
|
|
|
|
Intake Approval | | | 7/30/2020 | | PASS |
|
|
|
|
Telephone call | | | 7/29/2020 | | DONE |
|
|
|
email CofO fees to applicant- this will need to be routed to Carl W.
|
Application received | | 7/29/2020 | | | |
|
|
|
|