BOISE PARK SUITES HOTEL ADDITION-TO CONSTRUCT A NEW 61,725 SQ. FT., THREE STORY, WOOD FRAME WITH CONCRETE SLAB FLOOR HOTEL BUILDING WITH 117 GUEST ROOMS AND 5 MEETING ROOMS. THIS HOTEL BUILDING WILL BE ATTACHED AT THE NORTH END TO AN EXISTING THREE STORY WOOD FRAME HOTEL BUILDING. THESE BUILDING WILL BE SEPARATED BY A TWO-HOUR FIRE-RESISTIVE AREA SEPARATION WALL. THIS BUILDING WILL BE FULLY FIRE SPRINKLED FOR ALLOWABLE AREA INCREASES. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/21/2005  
Case Summary (BLD)  3/2/2004 DONE
Case Summary (BLD)  6/16/2003  
INSP - Final8/5/1998 8/5/1998 PASS
WORK COMPLETED AND OTHER AGENCIES SIGNED OFF. THERE WAS NO CALL FOR INSP.
INSP - Permanent occupancy  4/16/1996 PASS
Perm. Occ. Cert. #6360 issued 4-15-96 to Boise Park Suite Hotel (addition).
INSP - Final4/10/19964/10/19964/10/1996PPASS
Details
Permanent Occupancy 4/10/19964/10/1996 DONE
Details
INSP - Final4/4/19964/5/19964/5/1996PFAIL
Details
see permit BLD95-1412 needs electrical final.
INSP - Final2/22/19962/22/19962/22/1996PCANC
Details
338 made insp.
INSP - Final2/22/19962/22/19962/22/1996PFAIL
Details
02/22/96 338 -
INSP - Final2/16/19962/16/19962/16/1996PPART
Details
TEMP OCCUPANCY. SEE 338.
INSP - Temporary occupancy  2/16/1996 PASS
Temp. Occ. Cert. #3142 issued 2-16-96 to Boise Park Suite Hotel (addn.)
INSP - Temporary occupancy2/15/19962/15/19962/15/1996 PASS
Details
/ / 338 - signed temp occ for the 1st floor meetimg rooms also the kit bathrooms. and the 2nd floor except for room 274
Inspection Record Card- Bld  2/13/1996
INSP - Framing/Rough-in2/9/19962/9/19962/9/1996PPASS
Details
02/09/96 338 - for the total door framea framing at the 1st floor west
INSP - Wall cover2/9/19962/9/19962/9/1996 PASS
Details
/ / 338 -
INSP - Conference2/6/19962/6/19962/6/1996 PASS
Details
/ / 338 - CONF ON THE INSTALL OF THE TOTAL SMOKE DOORS 1ST FLOOR EAST
INSP - Framing/Rough-in2/5/19962/5/19962/5/1996PPART
Details
02/05/96 338 -
INSP - Framing/Rough-in2/2/19962/2/19962/2/1996PPASS
Details
02/02/96 338 - partial k to cover the door jambs and and install same pi ures are to be taken
INSP - Framing/Rough-in2/1/19962/2/19962/2/1996ANR
Details
02/01/96 338 -
INSP - Framing/Rough-in2/1/19962/1/19962/1/1996PPART
Details
02/01/96 338 -
INSP - Framing/Rough-in1/29/19961/30/19961/30/1996APASS
Details
01/29/96 338 - recieved details for the total smoke door to the 2-hour d
INSP - Framing/Rough-in1/25/19961/25/19961/25/1996PFAIL
DetailsGeorge Slane
01/25/96 38 -
INSP - Conference1/24/19961/25/19961/25/1996APASS
Details
01/24/96 338 - done 01/23/96
INSP - Framing/Rough-in1/23/19961/23/19961/23/1996PFAIL
Details
01/23/96 338 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in1/10/19961/10/19961/10/1996PPART
Details
01/10/96 338 -
INSP - Framing/Rough-in12/27/199512/28/199512/28/1995APART
Details
12/27/95 338 - partial 09 ok
INSP - Framing/Rough-in12/26/199512/26/199512/26/1995PNR
Details
12/26/95 338 - partial frame NEED TO RECALL CORR-CORREC-CALL FOR REINSP WHEN COMPLETED (VERBAL)
INSP - Framing/Rough-in12/21/199512/21/199512/21/1995PPART
Details
12/21/95 338 -
INSP - Framing/Rough-in12/19/199512/19/199512/19/1995PPASS
Details
12/19/95 338 - PARTIAL MADE OK ONLY
INSP - Framing/Rough-in12/13/199512/13/199512/12/1995PPART
Details
12/13/95 338 -
INSP - Framing/Rough-in12/11/199512/11/199512/11/1995PPART
Details
12/11/95 338 - can light boxex ok only
INSP - Framing/Rough-in12/7/199512/7/199512/6/1995PPART
Details
12/07/95 338 - partial
INSP - Conference12/6/199512/6/199512/6/1995 PASS
Details
/ / 338 - phone penetrations, installer
INSP - Conference12/6/199512/6/199512/6/1995 PASS
Details
/ / 338 - phone penetrations, installer
INSP - Framing/Rough-in12/6/199512/6/199512/6/1995 PART
Details
/ / 333 - helping Perry w/cn
INSP - Framing/Rough-in12/5/199512/6/199512/6/1995AFAIL
Details
12/05/95 338 -
INSP - Conference12/5/199512/5/199512/5/1995 PASS
Details
/ / 338 -
INSP - Framing/Rough-in12/4/199512/4/199512/4/1995PFAIL
Details
12/04/95 338 -
INSP - Framing/Rough-in11/29/199511/29/199511/29/1995PPART
Details
11/29/95 338 - p
INSP - Framing/Rough-in11/21/199511/21/199511/21/1995PPART
Details
11/21/95 338 -
INSP - Framing/Rough-in11/16/199511/17/199511/17/1995PPASS
Details
11/17/95 338 - partial frame 1st flr east corridor ok to insulate exterior walls must complete the caulk seal at top plate penetrations
INSP - Conference11/17/199511/17/199511/17/1995 PASS
Details
/ / 338 - W D LIGHTFOOT RESUBMITTALS
INSP - Framing/Rough-in10/25/199510/26/199510/26/1995APART
Details
10/26/95 338 - SOUTH WST END 2ND FLOOR OK TO INSULATE.
INSP - Framing/Rough-in10/25/199510/25/199510/25/1995PPASS
Details
10/25/95 338 - CANCELLED BY THECONTRACTOR
INSP - Framing/Rough-in10/19/199510/19/199510/19/1995PPART
Details
INSP - Framing/Rough-in10/17/199510/18/199510/18/1995AFAIL
Details
10/18/95 338 -
INSP - Conference10/16/199510/16/199510/16/1995 PASS
Details
/ / 338 - DROP OFF APROVED RESUBMITTALS PICK UP SMOKE ENCLOSURE DOORS DETAILS
INSP - Framing/Rough-in10/10/199510/10/199510/9/1995PPASS
Details
10/10/95 338 -
INSP - Framing/Rough-in10/5/199510/6/199510/5/1995PPASS
Details
10/06/95 338 - INSP DONE THIS AM CORRECTION NOTICE LEFT
INSP - Conference10/5/199510/5/199510/5/1995 PASS
Details
/ / 338 - CONFIRM APPMT TIME FOR TOMORROW.
INSP - Framing/ Rough-in10/5/199510/5/199510/5/1995 PART
Details
/ / 338 - C/N ISSUED
INSP - Conference10/2/199510/2/199510/2/1995 PASS
Details
/ / 338 - conduits to be firestopped
INSP - Framing/Rough-in9/28/19959/29/19959/29/1995PPASS
Details
09/29/95 338 -
INSP - Conference9/25/19959/25/19959/25/1995PPASS
Details
09/25/95 338 -
INSP - Conference9/11/19959/12/19959/12/1995APASS
Details
09/11/95 338 - must submit details for the wrap of the large I beabs in
INSP - Conference9/11/19959/11/19959/11/1995 PASS
Details
/ / 338 - FIRST INSP NEXT DAY
INSP - Framing/ Rough-in9/7/19959/7/19959/6/1995PCANC
Details
09/07/95 338 -
INSP - Conference9/6/19959/6/19959/6/1995 PASS
Details
/ / 338 - LOOKED OVER THE FIRE BLOCKING AND THE PENETRATIONS OF THE SA FINE
INSP - Conference8/18/19958/18/19958/18/1995 PASS
Details
/ / 338 -
INSP - Conference8/16/19958/16/19958/14/1995PPASS
Details
08/16/95 338 - HE IS SUPPOSE TO CALL YOU FOR A TIME.
INSP - Conference8/10/19958/11/19958/10/1995APASS
Details
08/10/95 338 - NEED RESUBMITALS ON THE TRELLIS ASSY IN THE COURTYARD APPROVED THE USE OF SOLID BLOCKING IN LEW OF RUNNING THE DRYWALL THROUGH THE LEDGER IN THE S
INSP - Footings7/5/19957/5/19958/7/1995PCANC
Details
CANC 305
INSP - Carpentry8/2/19958/2/19958/2/1995PPASS
Details
08/02/95 338 - pictures to show compliance
INSP - Foundation7/25/19957/25/19957/26/1995PPASS
Details
07/25/95 338 - made ok elevator shaft made ok to floor grade
INSP - Footings7/20/19957/21/19957/20/1995APART
Details
07/21/95 338 - made ok
INSP - Foundation7/20/19957/20/19957/20/1995PPASS
Details
07/20/95 338 - made ok r-bar placed ok
INSP - Conference7/19/19957/20/19957/19/1995APASS
Details
07/19/95 338 - MADE OK REJECTED RESUBMITTALS FOR THE 6X6 POST PROTECTION RESUBMIT
INSP - Foundation7/19/19957/19/19957/19/1995PPART
Details
07/19/95 338 - passed by the special insp agcy
INSP - Footings7/17/19957/17/19957/17/1995PPART
Details
07/17/95 338 - notre left with the contractor 1 need clasrification on the shear wall details 2.28.95 #7 also clarify horizontal shear panels and that common nails will be used 2 temperature
INSP - Foundation7/12/19957/12/19957/12/1995PPART
Details
07/12/95 338 - MADE OK PARTIAL
INSP - Miscellaneous7/7/19957/7/19957/10/1995PPASS
Details
pre job conference made ok all subs present Jack frank present
INSP - Footings7/6/19957/7/19957/10/1995APART
Details
INSP - Footings7/6/19957/7/19957/7/1995 CANC
Details
AM NOT READY
Print Pending Permit..........  7/5/1995
(F) Issue permit  7/5/1995
(F) Reprint permit  7/5/1995
Application received  5/1/1995