Telephone call | | | 8/15/1996 | | |
|
|
|
|
CHANGE STATUS TO (D) | | | 8/15/1996 | | |
|
|
|
|
INSP - Final | 8/29/1995 | 8/29/1995 | 8/25/1995 | P | PASS |
|
|
|
08/29/95 338 - STRING LINES SET
|
INSP - Letter of compliance | 8/25/1995 | 8/25/1995 | 8/25/1995 | | PASS |
|
|
|
/ / 338 - 9909
|
INSP - Framing/ Rough-in | 8/9/1995 | 8/9/1995 | 8/9/1995 | P | PASS |
|
|
|
/ / 338 - made ok corrections removed
|
INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 | P | FAIL |
Wes Worcester
|
|
|
08/08/95 342 - 09. c/n. 20 min
|
INSP - Energy code compliance | 8/3/1995 | 8/4/1995 | 8/4/1995 | A | NR |
|
|
|
08/03/95 338 -
|
INSP - Energy code compliance | 8/3/1995 | 8/4/1995 | 8/4/1995 | A | NR |
|
|
|
08/03/95 338 -
|
INSP - Framing/ Rough-in | 8/2/1995 | 8/3/1995 | 8/2/1995 | A | FAIL |
|
|
|
08/02/95 338 - set string lines to check the setbacks seal the tub drain to floor for rhte fraame insp 3 plumb up and full block the trusses over the front bay area 4 install the
|
INSP - Foundation | 7/17/1995 | 7/17/1995 | 7/17/1995 | | PASS |
|
|
|
/ / 338 -
|
INSP - Footings | 7/17/1995 | 7/17/1995 | 7/17/1995 | P | PASS |
|
|
|
07/17/95 338 - made ok stop work lifted by D Hattrick
|
(F) Issue permit | | | 7/17/1995 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/14/1995 | | |
|
|
|
|
Permit taken to Permit Desk | | | 7/13/1995 | | |
|
|
|
|
Dwelling recd. by Plan Check | | | 7/3/1995 | | |
|
|
|
|
Application received | | | 6/28/1995 | | |
|
|
|
|