CHANGE STATUS TO (D) | | | 8/15/1996 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/2/1995 | | I |
|
|
|
|
INSP - Final | 9/15/1995 | 9/15/1995 | 9/15/1995 | | PASS |
|
|
|
/ / 338 -
|
INSP - Letter of compliance | 9/15/1995 | 9/15/1995 | 9/15/1995 | | PASS |
|
|
|
/ / 338 - 9971
|
INSP - Final | 9/14/1995 | 9/14/1995 | 9/14/1995 | P | NR |
|
|
|
09/14/95 338 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Energy code compliance | 8/17/1995 | 8/17/1995 | 8/14/1995 | P | PASS |
|
|
|
08/17/95 338 -
|
INSP - Energy code compliance | 8/17/1995 | 8/17/1995 | 8/14/1995 | P | PASS |
|
|
|
08/17/95 338 -
|
INSP - Framing/ Rough-in | 8/15/1995 | 8/15/1995 | 8/14/1995 | P | PASS |
|
|
|
08/15/95 338 - ok to insulate
|
INSP - Framing/ Rough-in | 8/11/1995 | 8/11/1995 | 8/10/1995 | P | PART |
|
|
|
08/11/95 338 - C/N ISSUED 1 NEED CAULK SEAL AT THE FLOOR TO THE BOTTOM PLATE BONUS ROOM 2 FIRE BIOCL/DRAFT STOP MUST BE AT THE CEILING LEVEL IN THE BONUS ROOM 3 SHIM LOOSE
|
INSP - Conference | 8/10/1995 | 8/10/1995 | 8/10/1995 | | PASS |
|
|
|
/ / 338 -
|
INSP - Footings | 8/9/1995 | 8/10/1995 | 8/10/1995 | A | NR |
|
|
|
08/09/95 338 -
|
(F) Issue permit | | | 8/9/1995 | | |
|
|
|
|
INSP - Framing/ Rough-in | 8/8/1995 | 8/8/1995 | 8/8/1995 | P | FAIL |
Wes Worcester
|
|
|
08/08/95 342 - 09. NOT CLOSE TO BEING READY ... IF I HAD RIGHT STRUCTURE SITE INFO. IF RIGHT STRUCTURE $30 FEE DUE. NO INSPECTIONS, ELECT STILL R WIRE. 30 MIN
|
INSP - Foundation | 7/21/1995 | 7/21/1995 | 7/21/1995 | | PASS |
|
|
|
/ / 338 -
|
INSP - Footings | 7/21/1995 | 7/21/1995 | 7/21/1995 | P | PASS |
|
|
|
07/21/95 338 - poured before insp setbacks appear ok
|
Inspection Record Card- Bld | | | 7/12/1995 | | |
|
|
|
|
Print Pending Permit.......... | | | 7/12/1995 | | |
|
|
|
|
(F) Issue permit | | | 7/12/1995 | | PAID |
|
|
|
|
Application received | | | 7/3/1995 | | |
|
|
|
|