CHANGE STATUS TO (D) | | | 8/15/1996 | | DONE |
|
|
|
|
INSP - Conference | 8/6/1996 | 8/7/1996 | 8/7/1996 | P | NR |
Wes Worcester
|
|
|
2 P.M. WED. plans not on site
|
INSP - Conference | 8/1/1996 | 8/2/1996 | 8/2/1996 | P | FAIL |
Wes Worcester
|
|
|
reactivate permit as several items not done correctly
|
INSP - Conference | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | FAIL |
Wes Worcester
|
|
|
met G Slane on site....poor workmanship and several other items not correct
|
INSP - Conference | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | CANC |
|
|
|
08/01/96 333 - DAVE DOLLINGER (HOMEOWNER) TALKED TO GEORGE AND HE SAID T CHECK THE WORK- PATIO AND WINDOW WELLS IN THE BACK. given to wes
|
INSP - Final | 10/25/1995 | 10/26/1995 | 11/7/1995 | A | NR |
Carl Dependahl
|
|
|
10/26/95 340 -
|
INSP - Letter of compliance | 10/26/1995 | 10/26/1995 | 10/26/1995 | | PASS |
Wes Worcester
|
|
|
/ / 342 - c/c #10244
|
INSP - Final | 10/26/1995 | 10/26/1995 | 10/26/1995 | | PASS |
|
|
|
|
(F) Issue permit | | | 7/5/1995 | | PAID |
|
|
|
|
(F) Issue permit | | | 7/5/1995 | | PAID |
|
|
|
|
Application received | | | 7/5/1995 | | |
|
|
|
|