Permit Information
Permit NumberBLD95-00293
StatusFinaled
Name CHILI'S GRILL & BAR
Site Address 7997 W FRANKLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
This building is not fire sprinkled. To add a 363 sq. ft. addition to an existing (4,619 sq. ft.) restaurant. The total floor area of the building will be 4,982 sq. ft. after the addition. Work is to include concrete footings, foundation, and floor. Exterior walls will be constructed of wood studs/sheathing with brick/stucco veneer on the outside and wood paneling on the inside. All work shall comply with the approved drawings, engineering, and plan check notes. Separate electrical and mechanical permits are required. The maximum capacity of the restaurant (191) shall be posted in a conspicuous place on an approved sign near the main exit. PC-375-95 CJW INITIAL CERTIFICATE OF VALUE ON FILE. ELEC. 2,900 MECH. 800. COMBINED PL/MEC. 47,000
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance  12/1/1995 PASS
L/C #10463 THIS DATE
INSP - Final11/16/199511/17/199511/17/1995APASS
Details
11/17/95 333 - OTH-OTHER AGENCIES NOT APPROVED
INSP - Framing/Rough-in10/9/199510/10/199510/10/1995APASS
Details
10/09/95 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in10/5/199510/5/199510/5/1995PCANC
DetailsWes Worcester
10/05/95 342 - PRE-FRAMING
INSP - Footings9/19/19959/19/19959/19/1995PFAIL
Details
09/19/95 333 - CFRM-OK CEILING FRAMING
(F) Issue permit  9/18/1995
Permit taken to Permit Desk9/15/1995 9/15/1995
Received Certificate of Value9/15/1995 9/15/1995
Plan Reviewer's Copy of Permit  9/15/1995
Routing - BUILDING7/10/1995 9/15/1995 PASS
Drawings were approved July 17, 1995. The architect was called and told that it was ready to issue. We needed to know who the contractor was and and a new Cert. of Value.
Inspection Record Card- Bld  9/15/1995
Waiting for Cert. of Value9/15/1995 7/17/1995
Routing - FIRE7/10/1995 7/10/1995 PASS
Routing - BUILDING6/30/1995 7/10/1995 FAIL
UBC plan check was finished July 10, 1995. Report was sent to the architect. One item required a response.
Plan routing begun/NEW & ADDTN9/15/1995 7/10/1995
Routing - PLANNING6/20/1995 6/29/1995 PASS
Routing - PUBLIC WORKS6/16/1995 6/20/1995 PASS
Routing Off Site - C.D.H6/7/1995 6/16/1995 PASS
Plan routing begun/NEW & ADDTN9/15/1995 6/7/1995
Application received  6/6/1995