Case Summary (BLD) | | | 9/25/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/25/2009 | | DONE |
|
|
|
|
Letter of compliance | | | 4/17/1998 | | PASS |
|
|
|
Letter of Compliance #15020 issued 4-17-98.
|
Print Occupancy Form | | | 3/20/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 4/3/1997 | 4/3/1997 | 4/2/1997 | P | FAIL |
|
|
|
04/03/97 333 - need new permit
|
INSP - Final | 11/13/1996 | 11/13/1996 | 11/13/1996 | | PASS |
|
|
|
|
INSP - Letter of compliance | | | 11/13/1996 | | PASS |
|
|
|
ISSUED #12072 C OF C BY MJW AS PER 333.
|
INSP - Final | 11/12/1996 | 11/12/1996 | 11/12/1996 | | PASS |
|
|
|
shell and core ok based on goldsmiths correction list
|
INSP - Final | 11/12/1996 | 11/8/1996 | 11/8/1996 | | FAIL |
|
|
|
MISSING C/N FROM GORDON, SAW SEVERAL PROBLEMS
|
Inspection Record Card- Bld | | | 9/12/1996 | | |
|
|
|
|
INSP - Framing/Rough-in | 9/10/1996 | 9/11/1996 | 9/11/1996 | P | FAIL |
|
|
|
09/11/96 333 - OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Conference | 5/15/1996 | 5/14/1996 | 5/14/1996 | A | PASS |
|
|
|
met with rick
|
INSP - Final | 5/14/1996 | 5/13/1996 | 5/13/1996 | P | PART |
|
|
|
CARD SIGNED FOR TEMP CN PLACED
|
INSP - Final | 5/6/1996 | 5/6/1996 | 5/6/1996 | P | FAIL |
|
|
|
cn placed
|
INSP - Conference | 5/2/1996 | 5/2/1996 | 5/2/1996 | A | FAIL |
|
|
|
sent letter of transmittal to rick
|
INSP - Conference | 4/5/1996 | 4/5/1996 | 4/5/1996 | A | FAIL |
|
|
|
sent letter of transmittal to rick
|
INSP - Final | 4/5/1996 | 4/5/1996 | 4/5/1996 | A | FAIL |
|
|
|
gave letter of transmittal to Rick with requirements
|
INSP - Conference | 3/20/1996 | 3/20/1996 | 3/20/1996 | | PASS |
|
|
|
/ / 333 -
|
INSP - Conference | 3/20/1996 | 3/20/1996 | 3/20/1996 | | PASS |
|
|
|
/ / 333 -
|
INSP - Framing/Rough-in | 2/22/1996 | 2/22/1996 | 2/22/1996 | | PART |
Bob Archibald
|
|
|
basement corridor ok except elec. jay box near stairtower. Main level bathrooms need fireblocking before cover.
|
INSP - Conference | 2/2/1996 | 2/2/1996 | 2/2/1996 | | PASS |
Bob Archibald
|
|
|
on sheetrocking requirements. sprinkler substitutes for 1hr const..
|
INSP - Footings | 1/25/1996 | 1/25/1996 | 1/25/1996 | | PASS |
Bob Archibald
|
|
|
S.E. EXTERIOR STAIRWAY.
|
INSP - Framing/Rough-in | 1/18/1996 | 1/18/1996 | 1/18/1996 | | PART |
Bob Archibald
|
|
|
2hr wall at 2nd floor (south) ok for cover.
|
INSP - Framing/Rough-in | 12/8/1995 | 12/8/1995 | 12/8/1995 | | PASS |
Bob Archibald
|
|
|
SOUTH 2HR WALL @ 1ST FLR ONLY
|
INSP - Permit holder notice | 11/22/1995 | 11/22/1995 | 11/22/1995 | | FAIL |
Bob Archibald
|
|
|
CN ISSUED REGARDING OCCUPANCY.
|
Issue PAID IN FULL permit | | | 11/2/1995 | | |
|
|
|
|
Permit taken to Permit Desk | | | 11/2/1995 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/1995 | | |
|
|
|
|
Routing - FIRE | 10/19/1995 | | 11/1/1995 | | PASS |
|
|
|
|
Routing - BUILDING | 10/12/1995 | | 10/31/1995 | | PASS |
|
|
|
Need letter from the engineer or owner stating that there will be constant supervision from the structural engineer on site to coordinate the demolition and renovation on the back of the structure to assure the existing structure remains sound. Also may need a new certificate of value. (letter received on 10/30/95)
|
INSP - Miscellaneous | | | 10/26/1995 | | |
|
|
|
Sent a letter to Scott Robertson (engineer) regarding the required periodic special inspections required during demolition/renovation. (see letter on file)
|
Additional plans submitted | | | 10/12/1995 | | |
|
|
|
Revised structural drawings received showing relocation of southwest stair tower, deletion of exit door from basement into southeast stair tower and reponse to plan review items.
|
Additional plans submitted | | | 10/10/1995 | | |
|
|
|
Record of Survey for the property was recorded on this date and a copy supplied to Plan Check to add to the plans. Instrument #95073751. Record of Survey No. 3340.
|
Additional plans submitted | | | 10/9/1995 | | |
|
|
|
Revised architectural plans received along with a letter in response to plan review items. Still waiting for structural drawings.
|
Routing - BUILDING | 9/28/1995 | | 10/4/1995 | | FAIL |
|
|
|
Reviewed the resubmittals received 9/28/95. All items were not addressed satisfactorily as per letter dated 10/04/94 sent to Robin Murphy, the architect (see letter in file).
|
Additional plans submitted | | | 9/28/1995 | | |
|
|
|
Resubmittal plans received along with letter dated 9/25/95 to address the plan review items.
|
Routing - BUILDING | 8/24/1995 | | 9/21/1995 | | FAIL |
|
|
|
Plan review sent out on this date to architect via FAX and by mail. See telephone call noted on 9/6/95 for verbal information. I also have been communicating requirements by phone and FAX off and on.
|
Routing - PUBLIC WORKS | 9/18/1995 | | 9/18/1995 | | COND |
|
|
|
Passed with conditions that a Record of Survey be submitted and approved by Public Works per Chuck Michelson. --- as verbally discussed with Brad Bishop on this date. MYS
|
INSP - Miscellaneous | | | 9/18/1995 | | |
|
|
|
Responded to a FAX from Robin Murphy at Fraley/Stricker Architects on a rated wall assembly proposal.
|
Routing - PLANNING | 9/11/1995 | | 9/12/1995 | | PASS |
|
|
|
|
Telephone call | | | 9/6/1995 | | |
|
|
|
Called Robin Murphy at Fraley/Stricker Architects and let him know what items I found on the plans on a preliminary basis and also told him I would need the Record of Survey to comply with Public Works and my requirements for placement of structure on property.
|
Routing - PUBLIC WORKS | 8/22/1995 | | 8/24/1995 | | FAIL |
|
|
|
Legal description is not approved - see Brad Bishop.
|
Additional plans submitted | | | 8/16/1995 | | |
|
|
|
Structural calculations received from Atwood-Hinzman-Jones.
|
Routing - PUBLIC WORKS | 8/4/1995 | | 8/8/1995 | | FAIL |
|
|
|
|
Routing - PLANNING | 7/21/1995 | | 7/21/1995 | | FAIL |
|
|
|
|
Routing - PUBLIC WORKS | 7/17/1995 | | 7/20/1995 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/11/1995 | | 7/17/1995 | | PASS |
|
|
|
|
Routing - ELECTRICAL | 7/11/1995 | | 7/11/1995 | | PASS |
|
|
|
|
Plan routing process begun | | | 7/10/1995 | | |
|
|
|
Plan routing started. Plans to route to Plumbing/Mechanical, Public Works, Electrical and Planning then back to Plan Check. After Plan Check review it will route to Fire.
|
Additional plans submitted | | | 7/10/1995 | | |
|
|
|
Structural plans resubmitted (structural calculations not included). PLAN INCOMPLETE.
|
Additional plans submitted | | | 6/29/1995 | | HOLD |
|
|
|
Architectural plans resubmitted. Received first set of electrical drawings and 1 plumbing riser diagram. PLAN INCOMPLETE.
|
Additional plans submitted | | | 6/27/1995 | | HOLD |
|
|
|
Structural plans submitted by Atwood-Hinsman-Jones (no structural calculations included). PLAN INCOMPLETE.
|
Application received | | | 5/31/1995 | | HOLD |
|
|
|
The plans submitted were incomplete and put on hold pending further submittals for structural, mechanical and electrical. (See letter from architect on file dated 5/30/95).
|