(F) Reprint permit | | | 11/14/2002 | | DONE |
|
|
|
|
CHANGE STATUS TO (D) | | | 8/15/1996 | | |
|
|
|
|
INSP - Permanent occupancy | 7/31/1996 | 7/31/1996 | 7/12/1996 | | |
Joe Ray
|
|
|
PERM OCC. CERT. #6502 ISSUED 07/12/96 TO BOISE CITY FIRE STATION #2
|
Permanent Occupancy | | 7/12/1996 | 7/12/1996 | | DONE |
|
|
|
|
INSP - Final | 6/28/1996 | 7/1/1996 | 7/1/1996 | P | PART |
Wes Worcester
|
|
|
MON. 1 P.M. temp occ ok
|
INSP - Temporary occupancy | | | 7/1/1996 | | PASS |
|
|
|
Temp. Occ. Cert. #3238 issued 7-1-96 to Boise Fire Station #2.
|
INSP - Final | 6/27/1996 | 6/27/1996 | 6/27/1996 | P | NR |
Wes Worcester
|
|
|
FIRE DEPT HAS NOT SIGNED OFF, DID NOT GO OUT TO SITE, WILL ONCE FIRE DEPT HAS TESTED
|
INSP - Ceiling grid | 5/14/1996 | 5/14/1996 | 5/9/1996 | P | PASS |
Wes Worcester
|
|
|
05/14/96 342 -
|
Inspection Record Card- Bld | | | 3/19/1996 | | |
|
|
|
|
INSP - Framing/Rough-in | 2/21/1996 | 2/21/1996 | 2/21/1996 | P | PASS |
Wes Worcester
|
|
|
ck w/mech insp for cover, everything else ok
|
INSP - Masonry | 2/16/1996 | 2/16/1996 | 2/16/1996 | P | PART |
Wes Worcester
|
|
|
BRICK TIE CHECKED BY MTI
|
INSP - Framing/Rough-in | 2/12/1996 | 2/13/1996 | 2/13/1996 | A | PART |
Wes Worcester
|
|
|
ROOF c/n issued re: engineering and bracing
|
INSP - Conference | 1/30/1996 | 1/30/1996 | 1/30/1996 | P | PART |
Wes Worcester
|
|
|
HE SAID YOU WOULD KNOW WHAT TIME FOR CONF......PICKED UP ENG INFO
|
INSP - Carpentry | 1/25/1996 | 1/25/1996 | 1/25/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Carpentry | 1/24/1996 | 1/25/1996 | 1/25/1996 | A | NR |
Wes Worcester
|
|
|
01/24/96 342 - EXTERIOR GYP BOARD SHEATHING & FRAMING ENTRY OVERHANG....
|
INSP - Wall cover | 1/25/1996 | 1/25/1996 | 1/25/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - ENTRY OK, GWB OK, DO TRUSS ENG
|
INSP - Conference | 1/22/1996 | 1/23/1996 | 1/24/1996 | A | PART |
Wes Worcester
|
|
|
01/23/96 342 - Met w/George, Bob, eng, Hassagawa, mason, spec insp, and substandard in West rig rm wall, spec insp noted missing rebar and eng h fix. Paul from Hassagawa claimed I didn't identify myself, just pointed truck. That isn't
|
INSP - Conference | 1/22/1996 | 1/22/1996 | 1/22/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - called to change apt to our conference rm
|
INSP - Masonry | 1/22/1996 | 1/22/1996 | 1/22/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - rejected eng report. met MTI spec insp on site.
|
INSP - Wall cover | 1/19/1996 | 1/22/1996 | 1/22/1996 | A | NR |
Wes Worcester
|
|
|
01/19/96 342 - SHEATHING NAILING.....missing nails and missing screws in
|
INSP - Conference | 1/22/1996 | 1/22/1996 | 1/22/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - scheduled meeting for 9am Tues
|
INSP - Framing/Rough-in | 1/19/1996 | 1/19/1996 | 1/22/1996 | P | NR |
Wes Worcester
|
|
|
01/19/96 342 -
|
INSP - Framing/Rough-in | 1/20/1996 | 1/20/1996 | 1/20/1996 | | NR |
Wes Worcester
|
|
|
/ / 342 - no mech...actually wanted a shr nailing insp...which was rea roof nailing earlier in the week, but no mention of it at that time. Not walked away when he seen us drive on site. I went to job shack trlr wher ignored me while
|
INSP - Carpentry | 1/20/1996 | 1/20/1996 | 1/20/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - went back as per Bob's direction after hours and trlr was lo of shr was covered. Note has not been ready for numerous inspections bot and special. Has an attituide when told what is not done and objects to
|
INSP - Roof | 1/17/1996 | 1/17/1996 | 1/17/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - blking of trusses not nailed to roof sheathing. notified sup attitude problem. trying to maintain a report, but it is getting more difficult. architect submitting change order for nailing schedules
|
INSP - Roof | 1/16/1996 | 1/16/1996 | 1/16/1996 | P | NH |
Wes Worcester
|
|
|
01/16/96 342 - ROOF NAILING. gate locked
|
INSP - Flatwork | 12/20/1995 | 12/20/1995 | 12/20/1995 | P | PASS |
Wes Worcester
|
|
|
12/20/95 342 - poured w/ special insp
|
INSP - Flatwork | 12/18/1995 | 12/19/1995 | 12/19/1995 | A | PART |
Wes Worcester
|
|
|
12/19/95 342 - POURING AT 10:30 A.M.
|
INSP - Flatwork | 12/15/1995 | 12/15/1995 | 12/15/1995 | P | PART |
Wes Worcester
|
|
|
slab pour. POURING AT 9 A.M. THEY FORGOT TO CALL. THERE IS A SPECIAL INSP. ON THE JOB.
|
INSP - Foundation | 11/30/1995 | 12/1/1995 | 12/1/1995 | A | PASS |
Wes Worcester
|
|
|
12/01/95 342 - RETAINING WALLS & PIERS.....POURING AROUND 10 A.M. piers ok'd by 342, not ready this am
|
INSP - Miscellaneous | 11/29/1995 | 11/29/1995 | 11/29/1995 | | NR |
Wes Worcester
|
|
|
/ / 342 - Radon membrane inspection
|
INSP - Footings | 11/29/1995 | 11/29/1995 | 11/29/1995 | | PASS |
Wes Worcester
|
|
|
/ / 342 - South retaining wall ok
|
INSP - Footings | 11/28/1995 | 11/29/1995 | 11/29/1995 | P | FAIL |
Wes Worcester
|
|
|
11/29/95 342 - retaining wall 2 pm changed to 1 pm, rebar in dirt and not enough cover at btm & side, South
|
INSP - Masonry | 11/28/1995 | 11/29/1995 | 11/29/1995 | P | PASS |
Wes Worcester
|
|
|
11/29/95 342 - bond beam 12:30 entire top or last lift ok
|
INSP - Masonry | 11/27/1995 | 11/28/1995 | 11/28/1995 | A | NR |
Wes Worcester
|
|
|
11/28/95 342 - GROUT BOND BEAM no one there for masonry or supervision ì
|
INSP - Masonry | 11/28/1995 | 11/28/1995 | 11/28/1995 | | PART |
Wes Worcester
|
|
|
11/26/95 342 - GROUT BOND BEAM George on site for a conference. Special inspectors are supposed to be o
|
INSP - Masonry | 11/27/1995 | 11/27/1995 | 11/27/1995 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - placed c/n after confering with Kent Johnson and George Slan be placed Fri (5 days) unless corrections completed. Told to get the f__ the site and not to come on site unless checking with "super" first. Cal George and we will
|
INSP - Foundation | 11/24/1995 | 11/24/1995 | 11/24/1995 | P | PASS |
Wes Worcester
|
|
|
11/24/95 342 - retaining wall rebar cover ok, ck canted NW wall as plans
|
INSP - Footings | 11/21/1995 | 11/22/1995 | 11/22/1995 | A | CANC |
Wes Worcester
|
|
|
11/22/95 342 - RETAINING WALL
|
INSP - Foundation | 11/17/1995 | 11/20/1995 | 11/20/1995 | P | NR |
Wes Worcester
|
|
|
11/20/95 342 - 2 pm.arrived at 3:10 and still placing bar in bond beam a verts
|
INSP - Conference | 11/16/1995 | 11/16/1995 | 11/16/1995 | P | NR |
Wes Worcester
|
|
|
11/16/95 342 - HE SAID YOU MISSED YESTERDAYS APPOINTMENT. HE IS SUPPOSE UP ONE FOR THIS PM.
|
(F) Reprint permit | | | 10/12/1995 | | |
|
|
|
|
(F) Issue permit | | | 10/12/1995 | | |
|
|
|
|
Plans taken to the Permit Desk | | | 10/9/1995 | | OK |
|
|
|
PERMIT READY FOR ISSUE AS OF 10/09/95
|
Inspection Record Card- Bld | | | 10/9/1995 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 10/5/1995 | | 10/6/1995 | | PAID |
|
|
|
NO A.C.H.D. FEE REQUIRED ON THIS PROJECT.
|
Routing - PUBLIC WORKS | 7/31/1995 | | 8/8/1995 | | OK |
|
|
|
|
Routing - MECHANICAL | 7/12/1995 | | 7/26/1995 | | OK |
|
|
|
|
Routing - BUILDING | 7/24/1995 | | 7/26/1995 | | OK |
|
|
|
STRUCTURAL PLAN REVIEW COMPLETED 07/26/95, NO CORRECTIONS OR RESUBMITTALS REQUESTED. JCM
|
Routing - PLUMBING | 7/6/1995 | | 7/12/1995 | | OK |
|
|
|
|
Routing - ELECTRICAL | 7/6/1995 | | 7/6/1995 | | OK |
|
|
|
|
Routing - PUBLIC WORKS | 7/5/1995 | | 7/6/1995 | | NA |
|
|
|
THE PLANS NEED A FOOTHILLS REVIEW BY TERRY RECORDS FOR DRAINAGE AND A STREET LIGHTING PLAN IS REQUIRED.
|
Routing - PLANNING | 6/30/1995 | | 7/3/1995 | | OK |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/30/1995 | | |
|
|
|
|
Application received | | | 6/9/1995 | | |
|
|
|
|
Application received | | | | | |
|
|
|
|