INSP - Final | 9/30/1996 | 9/30/1996 | 9/30/1996 | | PASS |
|
|
|
|
INSP - Letter of compliance | | | 9/30/1996 | | PASS |
|
|
|
ISSUED #11905 C OF C BY MJW AS PER 301 THIS DATE.
|
INSP - Final | 8/28/1996 | 8/29/1996 | 8/29/1996 | A | PASS |
Jim Storey
|
|
|
08/28/96 301 - FNL -OK FINAL
|
(F) Reprint permit | | | 8/26/1996 | | |
|
|
|
|
INSP - Final | 8/22/1996 | 8/23/1996 | 8/23/1996 | P | NR |
Jim Storey
|
|
|
08/23/96 301 - CALL & REQUESTED THIS BE CANCELLED. WILL CALL TO RESCHEDU
|
INSP - Conference | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
|
|
|
reviewed fire code requirements for phase I completion, two signed and lighted exit ways w/ approved hardware required, new main ent/exit and reaer exit door. Side exits can wait for phase II. Discussed w/ carl in planning.
|
INSP - Conference | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | PASS |
Jim Sly
|
|
|
07/31/96 316 -
|
INSP - Framing/Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | PASS |
Jim Storey
|
|
|
07/08/96 301 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 5/20/1996 | 5/21/1996 | 5/21/1996 | A | NR |
Jim Storey
|
|
|
05/20/96 301 - CONF. REVEIWED REENGINEERING FOR RESOLVE PRIVOUS C/N OK.
|
INSP - Framing/Rough-in | 5/10/1996 | 5/10/1996 | 5/10/1996 | P | PART |
Jim Storey
|
|
|
05/10/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Foundation | 3/25/1996 | 3/26/1996 | 3/26/1996 | A | PASS |
|
|
|
AS EARLY AS POSSIBLE
|
INSP - Footings | 3/20/1996 | 3/21/1996 | 3/21/1996 | P | PASS |
|
|
|
will call
|
INSP - Foundation | 3/20/1996 | 3/21/1996 | 3/21/1996 | P | NR |
|
|
|
footing only. not ready for stem walls.
|
INSP - Foundation | 3/18/1996 | 3/18/1996 | 3/18/1996 | P | PASS |
|
|
|
Conference Only. Need Resubmittal on floor system.
|
Issue PAID IN FULL permit | | | 2/2/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/31/1996 | | |
|
|
|
|
Permit taken to Permit Desk | | | 1/31/1996 | | PASS |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 1/31/1996 | | |
|
|
|
|
Received Certificate of Value | 1/31/1996 | | 1/30/1996 | | |
|
|
|
|
(F) Reprint permit | | | 10/17/1995 | | I |
|
|
|
|
Waiting for Cert. of Value | 7/26/1995 | | 8/7/1995 | | |
|
|
|
Architect called 8-07-95. Message was left on his answering machine telling him that we needed a Cert. of Value an we needed to know who the contractor was.
|
Routing - PLUMBING | 7/31/1995 | | 8/4/1995 | | OK |
|
|
|
|
Routing - PLANNING | 7/26/1995 | | 7/31/1995 | | OK |
|
|
|
|
Plan routing begun/TENANTS | 7/26/1995 | | 7/26/1995 | | |
|
|
|
Routing begins the 3rd time after response from the architect. Must go back to Planning/Zoning and Plumbing.
|
Routing - BUILDING | 6/28/1995 | | 7/26/1995 | | OK |
|
|
|
Waiting at Carl J. Westfall's desk for response from the architect. Response recieved 07/24/95. Drawings approved and signed.
|
Additional plans submitted | | | 7/24/1995 | | |
|
|
|
Resubmitted drawings addressing items on the Plan Check were recieved.
|
Plan resubmittals received | 7/26/1995 | | 7/24/1995 | | |
|
|
|
Recieved resubmitted drawings addressing items that required a response. Response was complete and acceptable.
|
Routing - FIRE | 6/23/1995 | | 6/28/1995 | | OK |
|
|
|
|
Routing - BUILDING | 6/2/1995 | | 6/23/1995 | | |
|
|
|
Plan waiting in Plan Check for UBC review. UBC review completed 06/23/95.
|
Plan routing begun/TENANTS | 7/26/1995 | | 6/23/1995 | | |
|
|
|
Routing begins the 2nd time after UBC review by Plan Check.
|
Plan resubmittals requested | 7/26/1995 | | 6/23/1995 | | |
|
|
|
Sent letter and Plan Review to the Architect. Required a response to 6 items.
|
Routing - PLANNING | 5/31/1995 | | 6/1/1995 | | HOLD |
|
|
|
The drawings were rejected the 2nd time. A staff level design review was required.
|
Routing - ELECTRICAL | 5/23/1995 | | 5/31/1995 | | OK |
|
|
|
|
Routing - PLUMBING | 5/22/1995 | | 5/23/1995 | | HOLD |
|
|
|
The drawings were rejected the first time.
|
Routing - MECHANICAL | 5/22/1995 | | 5/23/1995 | | OK |
|
|
|
|
Routing - PUBLIC WORKS | 5/17/1995 | | 5/22/1995 | | OK |
|
|
|
|
Routing - PLANNING | 5/17/1995 | | 5/17/1995 | | HOLD |
|
|
|
The drawings were rejected the first time.
|
Application received | | | 5/16/1995 | | |
|
|
|
|
Plan routing begun/TENANTS | 7/26/1995 | | 5/16/1995 | | |
|
|
|
Routing begins the 1st time.
|