Permit Information
Permit NumberBLD95-00601
StatusFinaled
Name TERRY REILLY HEALTH SERVICES
Site Address 848 LA CASSIA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**TERRY REILLY HEALTH SERVICES** This building is not fire sprinkled. To enclose a roofed area (364 sq. ft.) of an existing health clinic and remodel portions of the interior. This permit is for Phase 1. Phase 2 is required to start within 24 months of Jan. 30, 1996. The total new floor area is 3,857 square feet on the main floor and 600 square feet in the basement. The use of the basement is limited exclusively for mechanical equipment. Storage is not approved because of noncomplying exits. Work is to include footings, foundations, columns, beams, floor system, windows, restrooms accessible to the disabled, and interior walls all per approved drawings, engineering, and plan check notes on file. Separate electrical, plumbing, and mechanical permits are required. A CERTIFICATE OF OCCUPANCY SHALL NOT BE ISSUED UNTIL AFTER PHASE 2 IS COMPLETED. PC-319-95 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final9/30/19969/30/19969/30/1996 PASS
INSP - Letter of compliance  9/30/1996 PASS
ISSUED #11905 C OF C BY MJW AS PER 301 THIS DATE.
INSP - Final8/28/19968/29/19968/29/1996APASS
DetailsJim Storey
08/28/96 301 - FNL -OK FINAL
(F) Reprint permit  8/26/1996
INSP - Final8/22/19968/23/19968/23/1996PNR
DetailsJim Storey
08/23/96 301 - CALL & REQUESTED THIS BE CANCELLED. WILL CALL TO RESCHEDU
INSP - Conference8/2/19968/2/19968/2/1996 PASS
reviewed fire code requirements for phase I completion, two signed and lighted exit ways w/ approved hardware required, new main ent/exit and reaer exit door. Side exits can wait for phase II. Discussed w/ carl in planning.
INSP - Conference7/31/19967/31/19967/31/1996PPASS
DetailsJim Sly
07/31/96 316 -
INSP - Framing/Rough-in7/8/19967/8/19967/8/1996PPASS
DetailsJim Storey
07/08/96 301 - FRAM-OK FRAMING
INSP - Framing/Rough-in5/20/19965/21/19965/21/1996ANR
DetailsJim Storey
05/20/96 301 - CONF. REVEIWED REENGINEERING FOR RESOLVE PRIVOUS C/N OK.
INSP - Framing/Rough-in5/10/19965/10/19965/10/1996PPART
DetailsJim Storey
05/10/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Foundation3/25/19963/26/19963/26/1996APASS
Details
AS EARLY AS POSSIBLE
INSP - Footings3/20/19963/21/19963/21/1996PPASS
Details
will call
INSP - Foundation3/20/19963/21/19963/21/1996PNR
Details
footing only. not ready for stem walls.
INSP - Foundation3/18/19963/18/19963/18/1996PPASS
Details
Conference Only. Need Resubmittal on floor system.
Issue PAID IN FULL permit  2/2/1996
Inspection Record Card- Bld  1/31/1996
Permit taken to Permit Desk  1/31/1996 PASS
Plan Reviewer's Copy of Permit  1/31/1996
Received Certificate of Value1/31/1996 1/30/1996
(F) Reprint permit  10/17/1995 I
Waiting for Cert. of Value7/26/1995 8/7/1995
Architect called 8-07-95. Message was left on his answering machine telling him that we needed a Cert. of Value an we needed to know who the contractor was.
Routing - PLUMBING7/31/1995 8/4/1995 OK
Routing - PLANNING7/26/1995 7/31/1995 OK
Plan routing begun/TENANTS7/26/1995 7/26/1995
Routing begins the 3rd time after response from the architect. Must go back to Planning/Zoning and Plumbing.
Routing - BUILDING6/28/1995 7/26/1995 OK
Waiting at Carl J. Westfall's desk for response from the architect. Response recieved 07/24/95. Drawings approved and signed.
Additional plans submitted  7/24/1995
Resubmitted drawings addressing items on the Plan Check were recieved.
Plan resubmittals received7/26/1995 7/24/1995
Recieved resubmitted drawings addressing items that required a response. Response was complete and acceptable.
Routing - FIRE6/23/1995 6/28/1995 OK
Routing - BUILDING6/2/1995 6/23/1995
Plan waiting in Plan Check for UBC review. UBC review completed 06/23/95.
Plan routing begun/TENANTS7/26/1995 6/23/1995
Routing begins the 2nd time after UBC review by Plan Check.
Plan resubmittals requested7/26/1995 6/23/1995
Sent letter and Plan Review to the Architect. Required a response to 6 items.
Routing - PLANNING5/31/1995 6/1/1995 HOLD
The drawings were rejected the 2nd time. A staff level design review was required.
Routing - ELECTRICAL5/23/1995 5/31/1995 OK
Routing - PLUMBING5/22/1995 5/23/1995 HOLD
The drawings were rejected the first time.
Routing - MECHANICAL5/22/1995 5/23/1995 OK
Routing - PUBLIC WORKS5/17/1995 5/22/1995 OK
Routing - PLANNING5/17/1995 5/17/1995 HOLD
The drawings were rejected the first time.
Application received  5/16/1995
Plan routing begun/TENANTS7/26/1995 5/16/1995
Routing begins the 1st time.