CHANGE STATUS TO (D) | | | 8/15/1996 | | |
|
|
|
|
INSP - Letter of compliance | 3/26/1996 | 3/26/1996 | 3/26/1996 | P | PASS |
|
|
|
c/l# 10911
|
INSP - Conference | 3/26/1996 | 3/26/1996 | 3/26/1996 | A | PASS |
|
|
|
conference with bill on final inspection
|
INSP - Letter of compliance | 3/26/1996 | 3/26/1996 | 3/26/1996 | P | PASS |
|
|
|
c/l# 10911
|
INSP - Final | 3/25/1996 | 3/26/1996 | 3/26/1996 | P | PASS |
|
|
|
TUES PM c/l#10911
|
INSP - Energy code compliance | 9/7/1995 | 9/8/1995 | 9/11/1995 | A | PASS |
|
|
|
09/07/95 338 -
|
INSP - Energy code compliance | 9/7/1995 | 9/8/1995 | 9/11/1995 | A | PASS |
|
|
|
09/07/95 338 -
|
INSP - Framing/ Rough-in | 9/6/1995 | 9/6/1995 | 9/6/1995 | P | PART |
|
|
|
09/06/95 338 - OK TO INSULATE STILL NEED DOCUMENTATION OF THE NON REQUIR PAPER BEHIND THE VINYL SIDING
|
INSP - Conference | 9/6/1995 | 9/6/1995 | 9/6/1995 | | PASS |
|
|
|
/ / 338 -
|
INSP - Conference | 9/6/1995 | 9/6/1995 | 9/6/1995 | | PASS |
|
|
|
/ / 338 - CALLED TH ESIDING INSTALLER AND TOLD HIM THAT HE MUSTDOCUMEN THE VAPOR BARRIER OF BUILDING PARER REQUIRED BY THE NER REPORTS
|
INSP - Framing/ Rough-in | 9/1/1995 | 9/1/1995 | 9/1/1995 | P | |
Jim Sly
|
|
|
EARLY PM
|
INSP - Conference | 8/18/1995 | 8/18/1995 | 8/18/1995 | | PASS |
|
|
|
/ / 338 - UPDATE WP
|
(F) Issue permit | | | 8/16/1995 | | |
|
|
|
|
Permit taken to Permit Desk | | | 8/16/1995 | | |
|
|
|
|
Print Pending Permit.......... | | | 8/16/1995 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/1995 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/1995 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/1995 | | |
|
|
|
|
INSP - Footings | 8/2/1995 | 8/3/1995 | 8/2/1995 | A | NR |
|
|
|
08/02/95 338 - early start setbacks will be checked at the frame insp when approved plans and setba are available
|
Dwelling recd. by Plan Check | | | 8/1/1995 | | |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 8/1/1995 | | P |
|
|
|
|
Application received | | | 7/27/1995 | | |
|
|
|
|