Permit Information
Permit NumberBLD95-00720
StatusExpired
Name GLENNON FINANCIAL
Site Address 900 N COLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
To finish a 1,383 sq.ft. office tenant space within an existing 5396 SQ.Ft. structure to create a new office area for this tenant. The total occupant load of the corridor serving all portions of this building requires the corridor to be upgraded to a 1-hr rated system, therefore this upgrading is a part of this building permit and must be as per approved plans and attached requirement lists. Plan check # 516-95. A separate Electrical, Plumbing, and Mechanical Permit must be obtained for this remodel. A Certificate of Occupancy must be obtained prior to occupying this space. PRP ELEC. 6,000 PLG. 2,000 MECH 4,000 COMB PLG AND MECH. 6,000.PE
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/13/2005  
Case Summary (BLD)  3/22/2005  
Case Summary (BLD)  10/22/2003  
INSP - Conference12/11/199512/11/199512/11/1995 PART
Details
/ / 333 - letter of transmittal sent to Knowles about corridor const.
INSP - Final11/20/199511/20/199511/20/1995PFAIL
Details
11/20/95 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED not approved for occupancy
INSP - Final11/15/199511/15/199511/15/1995PFAIL
Details
11/15/95 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Conference9/26/19959/26/19959/26/1995PPASS
Details
09/26/95 333 - corridor requirements
INSP - Footings9/25/19959/25/19959/26/1995PCANC
DetailsJim Storey
09/25/95 301 -
INSP - Framing/ Rough-in9/19/19959/19/19959/19/1995PPASS
Details
09/19/95 333 - FRAM-OK FRAMING
INSP - Conference9/8/19959/11/19959/11/1995APASS
Details
09/11/95 333 - 9 A.M. corridor requirements
(F) Issue permit  9/8/1995
Permit taken to Permit Desk  8/23/1995 FINL
ISSUE
Plan resubmittals requested  8/23/1995 PEND
FAXED CORRECTION LIST OF TWO ITEMS TO ARCH FOR CORRECTIONS AND RESUBMITTAL.
Inspection Record Card- Bld  8/23/1995
Plan Reviewer's activity  8/23/1995 PEND
DID PLAN REVIEW, PLAN ANALYSIS, CORRECTION LIST FAXED TO ARCH, ASSEMBLED PLANS-FILE, PERMIT PLAN INPUT, ---
Print Pending Permit..........  8/23/1995 FINL
RESUBS RECEIVED, ISSUE
Routing - PUBLIC WORKS8/4/1995 8/7/1995 PASS
Plan routing begun/TENANTS  8/3/1995 PEND
Route to Public Works then back to Plan Check. After Plan Check route to Fire Department.
Application received  8/1/1995 PEND