Permit Information
Permit NumberBLD95-00723
StatusFinaled
Name DAVISON-COPPLE-COPPLE-COPPLE
Site Address 199 N CAPITOL BLVD Unit: 600
Project NameWASHINGTON MUTUAL
Customer Number 
ePlanReviewNo
Description
(DAVIS-COPPLE-COPPLE - WASHINGTON MUTUAL BLDG - STE 600) This building is required to fire sprinkled. To create a 3,540 sq. ft. office space within an existing high-rise building. Work is to include a 1-hr fire-resistive exit corridor, a 1-hr tenant demising wall, interior walls, and suspended ceilings all per approved drawings and plan check notes on file. Separate electrical and mechanical permits are required. The location of fire sprinkler heads shall be per NFPA 13 as regulated by the Fire Department. PC-517-95 CJW INITIAL CERTIFICATE OF VALUE ON FILE. ELECTRICAL 21,568 PLG. 3,597 MECH. 17,920 COMBINED PL/ME 21,517
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (D)  8/15/1996
INSP - Permanent occupancy  10/12/1995 PASS
Perm. Occ. Cert. #6099 issued 10-12-95 to Davison, Copple, Copple & Copple.
Permanent Occupancy 10/6/199510/6/1995 DONE
Details
INSP - Final10/5/199510/5/199510/5/1995 PASS
DetailsBob Archibald
Routed to cathy for issuance of CO.
INSP - Final10/3/199510/3/199510/3/1995 FAIL
DetailsBob Archibald
not ready
(F) Issue permit  9/29/1995
Plan Reviewer's Copy of Permit  9/28/1995
Permit taken to Permit Desk9/28/1995 9/28/1995
Routing - BUILDING9/6/1995 9/28/1995 PASS
Reviewed resubmittal. Drawings approved with notes.
Inspection Record Card- Bld  9/28/1995
Received Certificate of Value9/28/1995 9/27/1995
Telephone call9/25/1995 9/25/1995
Called David Musgrove and told him that we needed a smoke control system design. He was called because the architect (Hosford) could not be contacted by telephone. Mr. Musgrove said he would call Hosford to resolve the problem. The call was made approx. 9:30 AM. Update - On 9-26-95 a tour of the building took place. Knock out windows in combination with mechanical exhaust of the corridors is used to meet smoke control.
Routing - BUILDING8/15/1995 9/6/1995 FAIL
UBC plan review started Aug. 6, 1995. Plan review list sent to the architect on Aug. 6, 1995. Two items require a response.
Routing - FIRE8/7/1995 8/15/1995 PASS
Routing - PUBLIC WORKS8/4/1995 8/7/1995 PASS
Plan routing begun/TENANTS  8/4/1995
Route to Public Works then back to Plan Check. After Plan Check route to Fire Department.
Application received  8/1/1995