Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD95-00725
StatusExpired
Name IDAHO FARM BUREAU FEDERATION
Site Address 500 W WASHINGTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**IDAHO FARM BUREAU FEDERATION** The basement of this building is fire sprinkled, the main floor is not. To construct a new wood frame roof system over the existing roof structure of an existing 1 story building. Work is to include a roof truss system, 1/2" OSB roof sheathing, metal roofing, soffits, facia, and 1-hr fire-resistive parapet all per approved drawings, engineering, and plan check notes on file. Two attic furnaces are proposed. Separate mechanical and electrical permits are required. PC-518-95 **CJW** INITIAL CERTIFICATE OF VALUE ON FILE. ELEC. 5,100 PLG. N/A MECH. 12,575 COMINGED PLG.MEC. 12,575
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Wall cover6/5/19966/6/19966/6/1996PPASS
DetailsWes Worcester
06/06/96 342 - FIREWALL INSPECTION
INSP - Framing/Rough-in5/8/19965/8/19965/2/1996PPART
DetailsWes Worcester
05/08/96 342 - DOUBLE SHEET ROCK ON CEILING not an approved assy, ie 1x furr downs, referring back to architect as w corrections on resubmittals
INSP - Conference5/7/19965/7/19965/1/1996PPART
DetailsWes Worcester
05/07/96 342 - 3:30 TUES. P.M.
Issue PAID IN FULL permit  11/9/1995 I
II
Routing - BUILDING9/12/1995 10/31/1995 PASS
Drawings were Carl's desk awaiting a response from the architect since 9-12-95. An acceptable resubmittal came in on 10-25-95. The drawings were approved 10-31-95.
Inspection Record Card- Bld  10/31/1995 P
Permit taken to Permit Desk10/31/1995 10/31/1995
Plan Reviewer's Copy of Permit  10/31/1995
Inspection Record Card- Bld  10/31/1995 P
Plan resubmittals received10/31/1995 10/25/1995
Routing - BUILDING8/16/1995 9/12/1995 FAIL
UBC plan check was started Sept. 11, 1995. Report was sent to the architect on Sept 12, 1995. Four items require a response.
Routing - MECHANICAL8/7/1995 8/16/1995 PASS
Routing - PLANNING8/4/1995 8/7/1995 PASS
Plan routing begun/MISC  8/4/1995
Route to Planning and Mechanical then back to Plan Check. After Plan Check route to Fire Department.
Application received  8/1/1995