Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD95-00728
StatusFinaled
Name POLLO BRAVO
Site Address 222 N 8TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This building is fully fire sprinkled. To enlarge an existing tenant space and convert it from a retail store to a restaurant. When finished the floor area of this tenant will be 2,238 square feet. Selective demolition per submitted engineering is covered under this permit. Work is to include a kitchen, 1-hr fire-resistive shaft for a grease hood and duct, modification of existing roof and 2nd floor framing, interior walls, and suspended ceilings all per approved drawings, engineering, and plan check notes on file. Separate electrical, plumbing, and mechanical permits are required. The maximum occupant load (104) shall be posted. The location of fire sprinkler heads shall comply with NFPA 13 as regulated by the Fire Department. BEFORE A PERMANENT CERTIFICATE OF OCCUPANCY IS ISSUED, THE CORE RESTROOMS COVERED UNDER A SEPARATE PERMIT (BLD95-0841) MUST BE COMPLETED. PC-522-95 **CJW** initial certificate of value on file. elec. 14,975 combined pl/me 13,404 fire sprk. 1,603
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 11/22/199611/22/1996 DONE
Details
INSP - Final11/22/199611/22/199611/22/1996 PASS
CORRECTIONS MADE OK.
INSP - Permanent occupancy  11/22/1996 PASS
Perm. Occ. Cert. #6717 issued 11-22-96 to the Pollo Rey.
INSP - Final11/20/199611/20/199611/20/1996 FAIL
CN issued for hood and penetrations.
INSP - Conference12/18/199512/18/199512/18/1995 PART
DetailsBob Archibald
REVIEWED UL DESIGN REQUIREMENTS WITH CONTRACTOR ON 1HR EXHAUST SHAFT.
INSP - Temporary occupancy  12/13/1995 PASS
Temp. Occ. Cert. #3104 issued 12-11-95 to Pollo Bravo.
INSP - Final12/8/199512/8/199512/8/1995 FAIL
DetailsBob Archibald
CN ISSUED OK FOR TEMP. OCC. ONLY.
INSP - Final12/7/199512/7/199512/7/1995 FAIL
DetailsBob Archibald
CN ISSUED
INSP - Framing/Rough-in11/8/199511/8/199511/8/1995 FAIL
DetailsBob Archibald
CN ISSUED.
(F) Issue permit  10/17/1995
Permit taken to Permit Desk10/12/1995 10/12/1995 PASS
Plan Reviewer's Copy of Permit  10/12/1995
Routing - BUILDING9/26/1995 10/12/1995 PASS
Resubmittal was provided 10-10-95. Drawings approved 10-12-95.
Inspection Record Card- Bld  10/12/1995
Received Certificate of Value10/12/1995 10/10/1995
Routing - FIRE9/22/1995 9/26/1995 PASS
Routing - BUILDING9/18/1995 9/22/1995 FAIL
UBC plan check was started on 9-19-95. Four (4) items required a response before the permit can be issued. The report was sent to the architect on 9-22-95.
Plan Reviewer's Copy of Permit  9/22/1995
Routing - ELECTRICAL9/18/1995 9/18/1995 PASS
Routing - MECHANICAL8/28/1995 9/18/1995 PASS
Routing - PLUMBING8/26/1995 8/28/1995 PASS
Routing - PUBLIC WORKS8/15/1995 8/18/1995 PASS
Routing Off Site - C.D.H8/4/1995 8/14/1995 PASS
Plan routing begun/TENANTS  8/4/1995
Route to Central District Health, Public Works, Plumbing, Mechanical, Electrical and back to Plan Check. After Plan Check route to Fire Department.
Application received  8/1/1995