Permit Information
Permit NumberBLD95-00905
StatusFinaled
Name CHEVRON/PETROL SERVICES
Site Address 2828 W AIRPORT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
CHEVRON "C" STORE WITH GAS PUMPS AND LUBE CENTER * (SECTION #1 OF 2) A TWO HOUR AREA SEPARATION WALL WILL BE CONSTRUCTED TO DIVIDE THIS BUILDING INTO TWO SEPARATE BUILDINGS. TO CONSTRUCT A NEW 8948 SQ. FT CONVENIENCE STORE AND QUICK LUBE CENTER. THE CONVENIENCE STORE IS APPROXIMATLY 2500 SQ.FT. THE FUEL ISLAND IS APPROX. 4512 SQ.FT AND THE LUBE CENTER IS 1936 SQ,FT, WITH A 1936 SQ.FT. BASEMENT. A ONE-HOUR OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE CONVENIENCE STORE AND THE LUBE CENTER. THIS PERMIT DOES NOT COVER THE FINISH CONSTRUCTION OF THE McDONALDS DRIVE THROUGH KITCHEN AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST THE 1994 EDITION OF THE BUILDING CODE. MP(95-458) DR-172-94 CU-98-94 THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM IS BEING INSTALLED IN THE BASEMENT ONLY AND INSTALLED IN ACCORDANCE WITH BOISE CITY FIRE DEPARTMENT. INITAL CERTIFICATE OF VALUE ON FILE. ELEC. 45,050 PLG. 23,030 MECH. 11,060 COMBINED PLG/MECH 34,090 FIRE SPKR. 6,700
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print permit w/o conditions  7/16/2004  
INSP - Permanent occupancy  4/23/1996 PASS
Perm. Occ. Cert. #6371 issued 4-23-96 to the Chevron "C" Store for the convenience store and lube center portion only.
Permanent Occupancy 4/17/19964/17/1996 DONE
Details
INSP - Temporary occupancy  4/4/1996 PASS
Temp. Occ. Cert. #3185 issued 4-4-96 to the Chevron "C" store and car wash. This temp. also includes BLD95-1565 and BLD95-1567.
INSP - Final4/3/19964/3/19964/3/1996PPASS
DetailsJim Storey
04/03/96 301 -
INSP - Conference3/25/19963/25/19963/25/1996 PASS
DetailsJim Storey
/ / 301 -
INSP - Ceiling grid3/22/19963/25/19963/25/1996APASS
DetailsJim Storey
03/25/96 301 -
INSP - Conference3/21/19963/21/19963/21/1996 FAIL
DetailsJim Storey
/ / 301 -
INSP - Framing/Rough-in3/1/19963/4/19963/7/1996PPART
DetailsJim Storey
03/04/96 301 -
INSP - Framing/Rough-in3/5/19963/4/19963/4/1996PPASS
Details
interior metal only.
INSP - Framing/Rough-in2/28/19962/29/19962/29/1996PNR
DetailsJim Storey
INSP - Carpentry2/20/19962/21/19962/21/1996APASS
DetailsJim Storey
EXHAUST SHAFT sheetrock nailling ok
INSP - Carpentry2/16/19962/20/19962/20/1996APASS
DetailsJim Storey
02/16/96 301 - FIREWALL
Inspection Record Card- Bld  1/31/1996
Issue PAID IN FULL permit  1/31/1996
Issue & PRINT FEE-DUE permit  1/29/1996
INSP - Carpentry1/26/19961/26/19961/26/1996 PASS
DetailsJim Storey
/ / 301 -
INSP - Carpentry1/26/19961/26/19961/26/1996 PASS
DetailsJim Storey
/ / 301 -
INSP - Carpentry1/25/19961/25/19961/25/1996 FAIL
DetailsJim Storey
/ / 301 -
INSP - Framing/Rough-in1/5/19961/8/19961/8/1996APART
DetailsJim Storey
01/05/96 301 - ROOF NAILING
INSP - Conference1/2/19961/2/19961/2/1996 PASS
DetailsJim Storey
/ / 301 -
INSP - Masonry12/26/199512/26/199512/26/1995PPASS
DetailsJim Storey
12/26/95 301 - ready
INSP - Masonry12/26/199512/26/199512/26/1995PPASS
DetailsJim Storey
12/26/95 301 -
INSP - Masonry12/19/199512/20/199512/20/1995APASS
DetailsJim Storey
12/19/95 301 -
INSP - Masonry12/18/199512/19/199512/19/1995APASS
DetailsJim Storey
12/18/95 301 - REBAR
INSP - Footings12/15/199512/18/199512/18/1995ACANC
DetailsJim Storey
12/15/95 301 -
Issue PAID IN FULL permit  12/15/1995
CHECKING TO SEE WHY STATUS DIDN'T CHANGE ON FIRST ACTION?
INSP - Foundation12/13/199512/14/199512/14/1995APASS
DetailsJim Storey
12/13/95 301 - STEEL INSP.?
INSP - Conference11/27/199511/27/199511/27/1995 PASS
DetailsJim Storey
/ / 301 -
INSP - Foundation10/27/199510/30/199510/30/1995APASS
DetailsJim Storey
10/27/95 301 - 11-11:30
INSP - Footings10/23/199510/24/199510/24/1995APASS
DetailsJim Storey
10/23/95 301 -
Permit taken to Permit Desk  10/16/1995 PASS
Routing - FIRE10/6/1995 10/16/1995 PASS
Routing - MECHANICAL10/16/1995 10/16/1995 PASS
FIELD VERIFIED
Inspection Record Card- Bld  10/16/1995
(F) Issue permit  10/16/1995 I
(F) Reprint permit  10/16/1995
Plan Reviewer's Copy of Permit  10/16/1995 PASS
Plan Reviewer's Copy of Permit  10/5/1995
Plan Reviewer's activity10/5/1995 10/5/1995 PEND
ADDITIONAL PERMITS FOR THIS PROJECT ARE BLD 95-1565 AND BLD 95-1567
Routing - PUBLIC WORKS9/14/1995 9/26/1995 PASS
Routing - PLANNING8/30/1995 9/14/1995 PASS
Routing Off Site - C.D.H8/17/1995 8/24/1995 PASS
Plan Reviewer's Copy of Permit  8/17/1995
Routing - FIRE8/17/1995 8/16/1995 FAIL
Hold Fire Dept. approval until size of building, canopy/building seperation and auto. sprinkler system questions are resolved between arch. and Bldg. Dept. 8-22-95 P.M.
Routing Off Site - A.C.H.D8/15/1995 8/15/1995 PASS
Routing - PUBLIC WORKS8/17/1995 8/14/1995 PASS
Routing - PLANNING7/19/1995 7/20/1995 FAIL
CONDITIONAL USE APPROVED DR HAS NOT BEEN REVIEWED
Routing - PLUMBING7/17/1995 7/19/1995 PASS
APPROVED AS NOTED
Routing - ELECTRICAL7/11/1995 7/12/1995 PASS
Application received  7/3/1995 PEND
Routing - MECHANICAL7/17/1995   FAIL
Routing - BUILDING10/16/1995   PASS
PER ATTACHED COMMENT SHEETS>
Routing - BUILDING9/19/1995   PEND