Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD95-01036
StatusExpired
Name BOISE OB GYN
Site Address 5966 W CURTISIAN AVE
Project NameBOISE OB-GYN CLINIC
Customer Number 
ePlanReviewNo
Description
BOISE OB-GYN * TO ADD 1,000 SQ.FT. OF EXAM AND OFFICE AREA TO THE EXISTING MEDICAL OFFICE BUILDING. THE ADDITION WILL MEET THE REQUIREMENTS OF A TYPE V NONRATED, WOOD FRAMED, SINGLE STORY, RAISED FLOOR BUILDING. A FIRE SPRINKLER SYSTEM IS BEING INSTALLED THROUGH OUT THE BUILDING ALONG WITH A NEW EXIT DOOR IN THE SOUTH WALL OF THE EXISTING WAITING ROOM. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST AND THE 1991 EDITION OF THE UBC. MP (P.C.#95-431) DR 135-77/MOD
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired2/7/20012/7/20012/7/2001PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 2/7/2001 4:52:35 PM
INSP - Final9/21/19989/21/19989/21/1998 PASS
DetailsJoe Tawney
/ / 406 - REINSP OK FOR CERT OF COMPLETION
INSP - Final3/6/19973/7/19973/7/1997PNR
DetailsJoe Tawney
03/07/97 406 - NOT READY FOR REINSPECTION FDC & PIV LOCATION STILL NOT R
INSP - Final2/25/19972/25/19972/25/1997PFAIL
DetailsJoe Tawney
02/25/97 406 - REINSPECTION FOR FINAL FAILED PAINTING & LETTERING CURBS LOCATION OF FD CONN & PIV
INSP - Final2/5/19972/6/19972/6/1997AFAIL
DetailsJoe Tawney
FAIL STRIPING AND SIGNAGE FOR FD ACCESS PIV AND FDC NOT LOCATED AS SHOWN ON PLANS
INSP - Final2/3/19972/4/19972/4/1997ANR
Details
02/04/97 338 - no approved plans or paperwork on sith
INSP - Final2/4/19972/4/19972/4/1997 PART
FINAL ON SPKLR SYST ALARM TEST OK FLOW AND VALVE TAMPERS
INSP-Sprinkler Rough-in/Hydro1/9/19971/10/19971/10/1997APASS
DetailsJoe Tawney
RICK - ###-#### UNDERGROUND FLUSH OK
INSP - Framing/Rough-in7/8/19967/9/19967/9/1996APART
Details
07/09/96 338 - need fire block at the top and bottom plates ok to cover until re inspection
INSP - Framing/Rough-in6/12/19966/13/19966/13/1996APART
Details
06/13/96 333 - PARTIAL FRAME ceiling ok to cover ì
INSP - Foundation5/23/19965/23/19965/23/1996PPASS
Details
05/23/96 338 - PM r-bar placed ok to start pouring
INSP - Foundation5/23/19965/23/19965/23/1996 PASS
Details
/ / 338 - looks good FDN -OK FOUNDATION
INSP - Footings5/22/19965/22/19965/22/1996PPASS
Details
05/22/96 338 - pm....around 3 pm if possible..... FTG -OK FOOTING
Issue PAID IN FULL permit  4/30/1996
Permit taken to Permit Desk  4/26/1996 PASS
Inspection Record Card- Bld  4/26/1996
Plan Reviewer's activity  4/26/1996 PASS
Plan Reviewer's Copy of Permit  4/26/1996 PASS
Print Pending Permit.LaserJet4  4/26/1996 PASS
Received Certificate of Value  4/25/1996 PASS
recieved certificate of value 04/24
Routing - MECHANICAL4/24/1996 4/24/1996 PASS
INSP-Sprinkler Rough-in/Hydro1/15/19971/15/19971/15/1996PPASS
DetailsJoe Tawney
RICK - ###-#### OK ON UNDER GROUND HYDRO AND ABOVE GROUND HYDRO TESTS AND SPKLR ROUGH IN
Plan resubmittals received  12/15/1995 PEND
COMPLETE PL. PLANS SUBMITTED TO JIM SODEN.
Routing - FIRE12/8/1995 12/8/1995 PASS
Routing - PLUMBING12/5/1995 12/7/1995 FAIL
Routing - MECHANICAL12/5/1995 12/7/1995 FAIL
Routing - FIRE11/30/1995 12/5/1995 FAIL
Plan Received by (M_P)8/26/1995 11/30/1995 PEND
DetailsMike Phillips
WAITING FOR CONTRACTOR INFORMATION AND CERTIFICATE OF VALUE
Plan Reviewer's Copy of Permit  11/30/1995 PEND
Routing Off Site - A.C.H.D9/14/1995 11/29/1995 PASS
RECEICED RECEIPT OF ACHD FEES
Received Certificate of Value9/14/1995 9/14/1995
Plan Reviewer's activity9/14/1995 9/14/1995 PEND
Waiting for responce on problems in the existing building as to exits and corridor not rated.
Routing - PLANNING8/29/1995 9/12/1995 PASS
Plan Reviewer's Copy of Permit  8/30/1995
Telephone call8/29/1995 8/29/1995
Waiting for Cert. of Value8/29/1995 8/29/1995
Routing - MECHANICAL8/13/1995 8/14/1995 FAIL
COMPLETE PLANS NEEDED
Routing - PLUMBING8/13/1995 8/14/1995 FAIL
COMPLETE PLANS NEEDED
Routing - PUBLIC WORKS8/2/1995 8/8/1995 PASS
Routing - ELECTRICAL8/1/1995 8/2/1995 PASS
Routing - PLANNING7/3/1995 7/3/1995 FAIL
Application received  6/22/1995 PEND
Routing - BUILDING4/25/1996   PEND
Routing - BUILDING12/7/1995   PEND
TALKED WITH TOM ZABALA ABOUT ACQUIRING MECHANICAL AND PLUMBING SHEETS. FAXED HIM PLUMBING AND MECHANICAL REVIEW SUMMARY SHEET.
Routing - BUILDING12/11/1995   PEND