Permit Information
Permit NumberBLD95-01127
StatusFinaled
Name GOOD SAMARITAN HOME
Site Address 3501 W STATE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To remodel the interior of five existing common use toilet/shower rooms. Based on Div. II-Appendix Chapter 11, 1994 UBC, one unisex toilet facility is required per Sec. 1111.2.5. Work to include repair of walls and flooring, damaged by water & use and to install new fixture's to be usable by disabled. Work does not include any alteration of the bathroom entry doors per contractor. Any alteration to doors or supporting walls shall require full compliance of all toilet facilities for accessibility & usability per Chapter 11, 1994 UBC. All per approved plans and notes. Separate electrical, plumbing & mechanical permits are required. Note: "FINAL OCCUPANCY SUBJECT TO FIRE DEPARTMENT APPROVAL." PC576-95 drs 9/27/95 PROJECT VALUE:$15,500 ELECTRICAL:$500 PLUMBING:$10,250 MECHANICAL: $300 FINAL CERTIFICATE OF VALUE ON FILE LAS
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/7/2014 DONE
INSP - Final3/10/19973/10/19973/10/1997 PASS
INSP - Letter of compliance  3/10/1997 PASS
ISSUED #12485 C OF C BY 333 3/6/97.
INSP - Final2/28/19972/28/19972/28/1997PPASS
Details
remodeled 5 bathrooms, no fd issues
INSP - Final2/27/19972/27/19972/27/1997PPASS
Details
02/27/97 333 - no card final ok
Print Occupancy Form  2/27/1997
Print Occupancy Form  2/27/1997
INSP - Wall cover6/25/19966/25/19966/25/1996PCANC
DetailsAlan Hauser
06/25/96 350 - early p.m. DONE BY #342
INSP - Partial final6/12/19966/13/19966/12/1996APART
DetailsWes Worcester
06/12/96 342 - WING D MEN AND WOMENS ONLY WILL BE THERE ABOUT 10:00
Receive PAYMENT IN FULL  5/15/1996
Issue & PRINT FEE-DUE permit  5/9/1996
INSP - Framing/Rough-in4/8/19964/9/19964/9/1996APART
DetailsWes Worcester
INSP - Carpentry4/9/19964/9/19964/9/1996PPASS
DetailsJim Sly
04/09/96 316 - EARLY PM Inspection of manager office restroom walls for firecaulking, and gyp attachment....OK
INSP - Conference4/3/19964/3/19964/3/1996 PART
DetailsJim Sly
/ / 316 - Met with Gilbert, Architect and Wes...Jim Sly
INSP - Conference4/1/19964/1/19964/1/1996PPASS
DetailsJim Sly
Met with Gilbert Pond...This is Wes' area ..need to get Wes involved.
INSP - Conference3/29/19963/29/19963/29/1996 FAIL
DetailsJim Sly
/ / 316 - Correction notice. Do not cover
(F) Reprint permit  3/29/1996
INSP - Conference3/27/19963/28/19963/28/1996ANH
DetailsJim Sly
03/27/96 316 - ASK FOR GILBERT POND 10:00 am...contractor not at site.
Telephone call  3/27/1996
SPOKE WITH GILBERT POND WHO STATED THAT THE ORIGINAL GENERAL CONTRACTOR (J & G) WAS FIRED FOUR MONTHS AGO AND POND HIRED TO COMPLETE THE JOB. DAN STUART INDICATED THAT HE WOULD NOT REQUIRE ADDITIONAL PLANS AS LONG AS THE NEW CONTRACTOR HAD ACCESS TO THE ORIGINAL APPROVED PLANS AT THE JOB SITE, WHICH HE DOES. DAVE HATTRICK SAID TO JUST ADD POND'S INC NAME TO THE PERMIT AND MAKE IT THE PRIMARY CONTRACTOR, WHICH HAS BEEN DONE. THE REMAINING WORK CONSISTS OF REPAIRS IN 4 OF THE 5 BATHROOMS (UNISEX BATHROOM IS COMPLETE).
(F) Reprint permit  3/27/1996
(F) Reprint permit  3/27/1996
INSP - Miscellaneous  3/27/1996
It was brought to my attention by Sue Millard, front desk personel of Building Department, that the contractor has changed for this project. Gilbert Pond, Pond Inc., has taken over the project from J & G Construction. I discussed this with Marlene Southard, my immediate superviser. It was determined that we would need to determine who paid for the original permit, the contractor or the tenant to find out if a refund was due to the contractor, J & G Const. if they paid for the permit. If a refund was given, then Pond Inc. would have to pay the permit fee portion returned to J&G Const. in order to be put on the permit as the new contractor. If the tenant paid for the permit it was felt that the new contractor could just be added to the existing permit. I explained this to Sue. Sue informed me that her supervisor, Dave Hattrick, had instructed her to just add the new contractor to the permit and make an action entry in the computer of what had taken place. Any alteration of fee's would then be handled if an when the original contractor came in to request a refund, if he paid the permit fee's. I explained this procedural direction to Marlene. The change was made to the permit by Sue Millard as she was instructed. drs
(F) Reprint permit  3/27/1996
(F) Issue permit  10/2/1995
Inspection Record Card- Bld  9/28/1995
Inspection Record Card- Bld  9/28/1995
Permit taken to Permit Desk  9/28/1995 PASS
Plan Reviewer's Copy of Permit  9/26/1995 PASS
Telephone call  9/25/1995
Phone call to James Kreller, contractor to verify that there was not going to be any changes to the existing doors from the corridor to the remodeled bathrooms. This project is a result of deterioration of the toilet/shower room interiors because of water and use. Repair project will include the upgrade of toilets and showers to be usable by the elderly and disabled per ADA requirements as directed by the architect, John Cook.
Routing - PUBLIC WORKS9/5/1995 9/6/1995 PASS
Plan routing begun/TENANTS  9/5/1995
Route to Public Works then back to Plan Check. (NOTE TO PLAN REVIEWER: This is a desk permit and does not need to route to Fire Department. Add note to permit stating "Final Occupancy Subject to Fire Department Approval".
Application received  8/30/1995
Routing - BUILDING9/7/1995   PEND