Fee Review-notes | 7/14/1998 | | 7/14/1998 | | DUP |
|
|
|
|
Permanent Occupancy | | 6/12/1997 | 6/12/1997 | | DONE |
|
|
|
|
Permanent Occupancy | | 6/12/1997 | 6/12/1997 | | DONE |
|
|
|
|
INSP - Final | 6/11/1997 | 6/12/1997 | 6/12/1997 | P | PASS |
Joe Tawney
|
|
|
06/12/97 406 - FIRE ALARM REINSPECT FOR FINAL REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 6/12/1997 | 6/12/1997 | 6/12/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - signed occ. card final
|
Permanent occupancy | | | 6/12/1997 | | PASS |
|
|
|
Perm. Occ. Cert. #6885 issued 6-12-95 to the Barton Apts.
|
INSP - Final | 6/9/1997 | 6/9/1997 | 6/9/1997 | | PART |
Alan Hauser
|
|
|
/ / 350 - meet with fire inspector (joe), went through the building, n corrections, some on fire side. no temp. occ.
|
INSP-Sprinkler Rough-in/Hydro | 6/6/1997 | 6/9/1997 | 6/9/1997 | P | PASS |
Joe Tawney
|
|
|
06/09/97 406 - 1 O'CLOCK PER YOU I GEUSS FINAL ON SPKLR SYSTEMS OK FOR PERM OCC
|
INSP - Final | 6/6/1997 | 6/9/1997 | 6/9/1997 | P | NR |
Carl Dependahl
|
|
|
06/09/97 340 - IS MEETING JOE AT 1 O'CLOCK (CARL---PLEASE LET THEM KNOW FOR PLUMBING.....THANKS LINDA)
|
INSP-Final Inspection | 6/6/1997 | 6/9/1997 | 6/9/1997 | P | FAIL |
Joe Tawney
|
|
|
06/09/97 406 - WOULD LIKE IT 1 O'CLOCK PER YOU FINAL FAIL DETECTOR IN ELEV SHAFT STROBES TO BE 15 FT FROM END OF HALL HI INTENSITY STROBE IN HEARING IMP ROOM FIRE EXT NEED TAGS
|
INSP-Sprinkler Rough-in/Hydro | 5/19/1997 | 5/20/1997 | 5/20/1997 | A | CANC |
Joe Tawney
|
|
|
05/20/97 406 - AFTER 10:00 spklr test for final cancelled until 5/21/97
|
INSP-Sprinkler Rough-in/Hydro | 5/5/1997 | 5/6/1997 | 5/6/1997 | P | PART |
Joe Tawney
|
|
|
OK ON HYDRO TEST FOR WP AND DP SYSTEMS ALSO AIR TEST ON DP SYSTEM
|
INSP-Conference | 4/2/1997 | 4/2/1997 | 4/2/1997 | | PASS |
|
|
|
CONF WITH SIMPLEX TOM KYLE ON ALARM SYSTEM FOR THIS BLDG
|
INSP - Framing/Rough-in | 3/26/1997 | 3/27/1997 | 3/26/1997 | A | FAIL |
|
|
|
03/27/97 333 - FRAME REINSEPCT OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Framing/Rough-in | 3/20/1997 | 3/21/1997 | 3/20/1997 | P | FAIL |
|
|
|
03/21/97 333 - 1ST FLOOR CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Sprinkler Rough-in/Hydro | 3/19/1997 | 3/20/1997 | 3/20/1997 | A | PART |
Joe Tawney
|
|
|
03/20/97 406 - call before going pager ###-#### rick ROUGH IN OK TO COVER FIRST FLOOR
|
INSP-Sprinkler Rough-in/Hydro | 3/11/1997 | 3/12/1997 | 3/12/1997 | P | PART |
Joe Tawney
|
|
|
03/12/97 406 - RICK - PAGER ###-#### OK ON UNDERGROUND HYDRO TEST
|
INSP-Conference | 3/6/1997 | 3/6/1997 | 3/6/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF WITH PAUL OF ASI ADV 2ND HYD REQ AT NORTH END OF PROPER ALSO ADV SUBMITTAL REQ FOR ALARM SYSTEM
|
INSP-Sprinkler Rough-in/Hydro | 3/5/1997 | 3/6/1997 | 3/6/1997 | A | PART |
Joe Tawney
|
|
|
03/06/97 406 - RICK - PAGER ###-#### SPKLR ROUGH IN FOR 2ND FLOOR OK TO COVER
|
INSP - Conference | 3/5/1997 | 3/5/1997 | 3/5/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - TALKED WITH CONTRACTOR ABOUT FIRE HYD. AND WENT OVER FIRE BL FLR.
|
INSP - Conference | 2/24/1997 | 2/24/1997 | 2/24/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - conf. on 3 rd floor ceiling, ok to start to insulate attic
|
INSP - Conference | 2/20/1997 | 2/20/1997 | 2/20/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - went over 3rd flr. heating
|
INSP-Sprinkler Rough-in/Hydro | 2/20/1997 | 2/20/1997 | 2/20/1997 | P | PART |
Joe Tawney
|
|
|
02/20/97 406 - RICK - ###-#### spklr rough in OK TO COVER 3RD FLOOR
|
INSP - Conference | 2/7/1997 | 2/7/1997 | 2/7/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - went over 3rd floor with framers, htg, elec. on fire blockin stopping requirements
|
INSP - Conference | 1/28/1997 | 1/28/1997 | 1/28/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - WENT OVER INFORMATION FROM FIRE SPRINKLER CONTRACTOR ON PIPE PROTECTIONS IN 1 HR. WALL/CORRIDORS
|
INSP - Conference | 1/24/1997 | 1/24/1997 | 1/24/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - left corrections notice with supt. about plastic sprinkler p at corridor walls. need detail on protection
|
INSP - Conference | 1/16/1997 | 1/16/1997 | 1/16/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - left notice on clarification on laundry room rated wall, det
|
INSP - Conference | 1/14/1997 | 1/14/1997 | 1/14/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - conf. with builder, electrican, plbg, and bob a. about fire requirements.
|
INSP - Conference | 1/10/1997 | 1/10/1997 | 1/10/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked with supt. about fire caulking and setting up a meeti supervisior
|
INSP - Conference | 1/10/1997 | 1/10/1997 | 1/10/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - talked to bob a. about a meeting with supt. of job next wed. caulking.
|
INSP - Framing/Rough-in | 12/30/1996 | 1/2/1997 | 1/2/1997 | A | PASS |
Alan Hauser
|
|
|
01/02/97 350 - shearwall nailing of 1st floor exterior and interior shea
|
INSP - Conference | 12/16/1996 | 12/16/1996 | 12/16/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - CONF. WITH FRAMER, BUILDER, AND PLBG. ABOUT PARTY WALLS AND PROTECTION AT CEILING/FLOOR ASSEMBLY FOR 1 HR.
|
INSP - Foundation | 11/14/1996 | 11/14/1996 | 11/14/1996 | P | PASS |
Alan Hauser
|
|
|
11/14/96 350 - INSPECTION OF REBAR IN STEM WALLS, REBAR AS PER PLAN
|
INSP - Footings | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
Alan Hauser
|
|
|
11/13/96 350 - THIS HAS SPECIAL INSPECTIONS, ALSO LOOKED AT FTNS. FTNS A
|
Issue PAID IN FULL permit | | | 9/9/1996 | | |
|
|
|
|
Print Occupancy Form | | | 8/27/1996 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/27/1996 | | PASS |
|
|
|
files
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/1996 | | PASS |
|
|
|
issue
|
Inspection Record Card- Bld | | | 8/27/1996 | | |
|
|
|
|
Print Occupancy Form | | | 8/27/1996 | | |
|
|
|
|
Print Occupancy Form | | | 8/27/1996 | | |
|
|
|
|
Telephone call | | | 8/27/1996 | | |
|
|
|
NOTIFIED ARCHITECT IN CHICAGO THAT PERMIT IS READY
|
Plan Received by (PRP) | 9/25/1995 | | 8/27/1996 | | PASS |
|
|
|
08/27/96 10:53:00 PRP - this action updated by action script from <<>> in Case No. BLD95-1438
|
Plan Reviewer's activity | | | 8/27/1996 | | PASS |
|
|
|
reviewed resubmittals received 5/1/96. exception: ADDENDUM #3 changed to bottom chord bearing trusses, this is ok if details of fire walls remain fire resistive through the attic and floor/ceiling space. 8/07/96--Assembled all revisions to the Approved Plan sets. Stamp, and sign Approval. Telephone Arch for "Certificate of Value" and ACHD Certificate before actual issuance. 8/27/96--Received "Paid" receipt from ACHD via Fax for this project. Total paid is $4832.00. Will issue permit today.
|
Received Certificate of Value | 8/27/1996 | | 8/12/1996 | | |
|
|
|
|
Telephone call | | | 8/6/1996 | | PASS |
|
|
|
called to inform Architect again the need for Cert of Value and ACHD Certificate to be received by Plan Check before issuance of Permit. Douglas on Vacation, left message with "Steve".
|
Routing - PUBLIC WORKS | 8/5/1996 | | 8/6/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/29/1996 | | 8/2/1996 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 7/22/1996 | | PASS |
|
|
|
received revised plans to indicate bottom bearing trusses. Extend Permit life another 180 days./
|
Plan resubmittals received | | | 5/1/1996 | | PEND |
|
|
|
RECEIVED RESUBMITTALS VIA FEDEX FOR PROJECT.
|
Plan Reviewer's activity | | | 4/19/1996 | | PEND |
|
|
|
RECEIVED LETTER FROM ARCHITECT REQUESTING EXTENTION ON PERMIT APPLICATION DUE TO WAITING FOR HUD CLOSING DATE. ALL CORRECTIONS TO PLANS ARE READY TO RESUBMITT. GRANTED EXTENTION.
|
Telephone call | | | 3/28/1996 | | PEND |
|
|
|
CALL RECEIVED FROM DOUG WATSCHKE ABOUT REVISIONS TO COMPLY WITH CORRECTION NOTICE TO BE INCORPORTATED INTO THE APPROVED PLANS. EXTENSION OF TIME ON APPLICATION REQUESTED AND APPROVED. EXPECT TO RECEIVE RESUBS WITHIN 10 TO 20 DAYS.
|
Routing - PUBLIC WORKS | 12/5/1995 | | 12/7/1995 | | FAIL |
|
|
|
|
Plan resubmittals requested | 12/5/1995 | | 12/5/1995 | | |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 12/5/1995 | | PEND |
|
|
|
PLAN REVIEW, MARK-UP, CORRECTION LIST, FAX AND MAIL TO ARCH, PERMIT-PLAN INPUT, WAIT FOR RESUBS AND CERT OF VALUE.
|
Waiting for Cert. of Value | 12/5/1995 | | 12/5/1995 | | |
|
|
|
|
Plan Reviewer's activity | | | 12/5/1995 | | PEND |
|
|
|
PLAN REVIEW, MARK-UP, CORRECTION LIST, FAX AND MAIL TO ARCH, PERMIT-PLAN INPUT, WAIT FOR RESUBS AND CERT OF VALUE.
|
Plan Reviewer's Copy of Permit | | | 12/5/1995 | | |
|
|
|
|
FEE REVIEW-NOTES | | | 12/4/1995 | | |
|
|
|
PLAN REVIEW FORGOT ABOUT THIS PERMIT. I ADDED ANOTHER PERMIT FOR PLAN REVIEW FEE TO CLEAN UP ESCROW TOOK FEES OF BLD95-1836 AND PUT ON TO THIS ONE. DELETED BLD95-1836 LKH
|
Routing - FIRE | 11/7/1995 | | 11/30/1995 | | PASS |
|
|
|
FIRE PLAN CHECK DONE BY DONALD C. MOELLER, P.E.; OF ROLF JENSEN AND ASSOCIATES, INC.; 2125 OAK GROVE ROAD; SUITE 300; WALNUT CREEK, CA 94###-####; ###-####.
|
Routing - MECHANICAL | 11/1/1995 | | 11/7/1995 | | PASS |
|
|
|
NO REVIEW, FIELD VERIFY.
|
Routing - PLUMBING | 10/25/1995 | | 11/1/1995 | | PASS |
|
|
|
|
Routing - ELECTRICAL | 10/24/1995 | | 10/25/1995 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 10/10/1995 | | 10/23/1995 | | PEND |
|
|
|
Contacted Gerry Rothmeyer at ###-#### for A.C.H.D. pickup.
|
Routing - PLANNING | 10/9/1995 | | 10/10/1995 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/27/1995 | | 10/6/1995 | | FAIL |
|
|
|
|
Waiting for Cert. of Value | | | 9/27/1995 | | PEND |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/27/1995 | | PEND |
|
|
|
TO PW, PLANNING, ACHD, PLUMBING, MECHANICAL, ELECTRICAL, BUILDING, FIRE DEPTS IN THAT ORDER PLEASE.
|
Application received | | | 9/26/1995 | | PEND |
|
|
|
4/19/96--EXTENTION OF PERMIT APPLICATION REQUESTED AND GRANTED. PRP
|
Routing - BUILDING | 9/27/1995 | | | | |
|
|
|
|
Routing - BUILDING | 12/7/1995 | | | | PEND |
|
|
|
|
Routing - BUILDING | 11/30/1995 | | | | PEND |
|
|
|
|
Routing - BUILDING | 8/2/1996 | | | | PEND |
|
|
|
|
Routing - BUILDING | 8/6/1996 | | | | PEND |
|
|
|
|