COURTYARD BY MARRIOTT HOTEL-BUILDING SECTION #1-THIS HOTEL BUILDING IS BEING DIVIDED INTO THREE BUILDINGS BY TWO AREA SEPARATION WALLS FOR ALLOWABLE AREA. PHASE I-TO POUR CONCRETE FOUNDATION AND SLAB FLOOR AND TO DO RELATED SITE IMPROVEMENTS ONLY. (SEE CONDITIONS FOR PHASE I CONSTRUCTION). PHASE II-TO CONSTRUCT A NEW 29375 SQ. FT., FOUR STORY, WOOD FRAME HOTEL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING CONTAINS THE INDOOR POOL/SPA ROOM, THE EXERCISE ROOM, GUEST LAUNDRY, 64 HOTEL GUEST ROOMS AND RELATED HOTEL STORAGE AREAS. THIS BUILDING IS FULLY FIRE SPRINKLED FOR ALLOWABLE ONE STORY HEIGHT INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. JCM/95-442/CU-21-95/DR-15-95
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/29/2004  
(F) Reprint permit  12/2/1999 DONE
INSP - Permanent occupancy  1/15/1997
INSP - Permanent occupancy  1/15/1997 PASS
Perm. Occ. Cert. #6764 issued 1-14-97 to the Courtyard by Marriott Hotel - also includes permits BLD95-1555, BLD95-1556 and BLD96-0236.
Permanent Occupancy 1/14/19971/14/1997 DONE
Details
INSP - Final1/14/1997 1/14/1997 PASS
INSP - Occupancy Sign-off1/13/19971/13/19971/13/1997 PASS
Insp - Art Yingling - Meets compliance w/CU-21-95/DR-15-95 - Final Occ. Signed - Approved to release Bond.
INSP - Occupancy Sign-off11/15/199611/15/199611/15/1996 FAIL
Issues of meeting DR cond. #1b, #1e (add'l shrubs and moving a tree). Providing specific approved shrubs. Cond. #1c - ground cover for NW Pad/pedestrian walkway, stiping drives and issue of Off-Premise Adv. Sign
INSP - Temporary occupancy  10/14/1996 PASS
Temp. Occ. #3296 issued 10-14-96 to the Marriott Hotel for pool & spa area.
INSP - Temporary occupancy  10/14/1996 PASS
Temp. Occ. Cert. #3295 issued 10-14-96 to the Marriott Hotel for Bldg. Sec. 1.
INSP - Final10/11/199610/11/199610/11/1996APART
DetailsWes Worcester
INSP - Conference10/11/199610/11/199610/11/1996APASS
DetailsWes Worcester
installing hardware and caulking penetrations
INSP - Final10/11/199610/11/199610/11/1996 PASS
temp occ approved, c/n issued
INSP - Temporary occupancy10/10/199610/10/199610/10/1996 PASS
Insp for temp. by Art Y./Required bonding for landscaping & sprinkler system/Bond posted for $79,123.00 on 10/10/96 temporary occupancy signed.
INSP - Conference10/4/199610/4/199610/4/1996 PASS
Details
/ / 405 - advised on elevator shaft requirements
INSP - Conference10/4/199610/4/199610/4/1996 PASS
Details
/ / 405 - advised on elevator shaft requirements
INSP - Fire Dept. Request8/20/19968/20/19968/20/1996 PASS
Details
/ / 405 - hydrant flush witnessed, ok
INSP - Conference8/20/19968/20/19968/20/1996 PART
Details
/ / 405 - conference with Jim (supt) scheduled to temp final office ar reviewed list of issues critical to office occ
INSP - Carpentry8/13/19968/14/19968/14/1996PPART
DetailsWes Worcester
FIRE CAULK HALLWAY three floors each side corridors all ok area A still not done
INSP - Conference5/1/19965/1/19965/1/1996 PART
DetailsWes Worcester
/ / 342 -
INSP - Framing/Rough-in3/21/19963/21/19963/21/1996PNR
DetailsWes Worcester
partial r/i
(F) Reprint permit  11/30/1995
Plan resubmittals received  11/29/1995 OK
INFORMATION AND DETAILS THAT WERE REQUESTED 11/17/95 HAVE BEEN RECEIVED AND APPROVED.
(F) Reprint permit  11/29/1995
(F) Reprint permit  11/15/1995 I
Permit taken to Permit Desk  11/2/1995 OK
THIS PERMIT IS BEING ISSUED AS A PHASED PERMIT. THE PHASE I PORTION OF THIS PERMIT IS BEING RELEASED WITH THE APPROVAL OF THE BUILDING DIRECTOR WITH CONDITIONS.
Inspection Record Card- Bld  11/2/1995 I
Issue PAID IN FULL permit  11/2/1995 I
Routing - PLANNING10/10/1995 10/16/1995 OK
Plan resubmittals received  10/12/1995 NA
PLAN RESUBMITTALS RECIEVED 10/12/95 - REVIEWED RESUBMITTALS WITHOUT THE ORIGINAL PLANS AND SENT A LETTER TO THE ARCHITECT 10/26/95 REQUESTING ADDITIONAL CHANGES. THERE MAY BE MORE CHANGES REQUIRED AFTER REVIEW OF THE ORIGINAL PLANS.
Routing - PUBLIC WORKS10/5/1995 10/9/1995 FAIL
Routing - BUILDING9/20/1995 10/4/1995 NA
PRELIMINARY PLAN REVIEW COMPLETED - PLANS SENT TO JERRY THEIS, ARCHITECT, FOR REVISIONS.
Plan resubmittals requested  10/4/1995 NA
PRELIMINARY PLAN REVIEW COMPLETED AND CORRECTION LIST SENT TO ARCHITECT, JERRY THEIS, 10/04/95.
Plan Reviewer's activity  9/29/1995 NA
IT WAS DETERMINED THAT THE BUILDING WAS OVER AREA. ON 09/29/95 I CREATED AN ABBREVIATED PLAN CHECK REPORT INDICATING A LIST OF THE LARGER REQUIRED CHANGES AND FAXED MR. THEIS A COPY SO THAT HE COULD BEGIN WORKING ON THOSE ITEMS WHILE I COMPLETED A MORE COMPREHENSIVE CORRECTION LIST.
Telephone call  9/28/1995 NA
CALLED JERRY THEIS TO DISCUSS THE PROPOSED BUILDING. I DETERMINED THAT THE BUILDING WAS WELL OVER AREA AND I NEEDED TO KNOW IF ALL OF THE SUBMITTED INFORMATION WAS CORRECT.
Routing Off Site - A.C.H.D9/7/1995 9/13/1995 PEND
A.C.H.D. IMPACT FEES HAVE NOT BEEN PAID AS OF 10/04/95
Routing Off Site - C.D.H8/17/1995 9/6/1995 OK
Routing - PLANNING8/7/1995 8/16/1995 NA
DESIGN REVIEW NOT APPROVED - BOB BROWN HAS APPROVED THE CONDITIONAL USE 08/14/95.
Routing - PUBLIC WORKS8/4/1995 8/7/1995 NA
STILL NOT THE CORRECT PLANS. JJ
Routing - MECHANICAL8/3/1995 8/4/1995 OK
Routing - PLUMBING7/31/1995 8/3/1995 OK
Routing - ELECTRICAL7/18/1995 7/28/1995 OK
Routing - PUBLIC WORKS6/29/1995 7/8/1995 NA
SEWER PLANS NEED TO BE ADDED TO DRAINAGE PLANS. JJ
Application received  6/28/1995 PEND