Case Summary (BLD) | | | 4/28/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | 11/22/1996 | 11/22/1996 | | DONE |
|
|
|
|
INSP - Permanent occupancy | | | 11/22/1996 | | PASS |
|
|
|
Perm. Occ. Cert. #6720 issued 11-22-96 to P-SG BOISE Natural Resource Center Phase I.
|
INSP - Occupancy Sign-off | 11/12/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
|
|
|
11/13/96 338 - temp signed
|
INSP - Occupancy Sign-off | 11/12/1996 | 11/13/1996 | 11/13/1996 | A | PASS |
Joe Tawney
|
|
|
11/12/96 406 - OK FOR PERM OCC
|
INSP - Final | 10/24/1996 | 10/25/1996 | 10/25/1996 | A | PART |
|
|
|
10/25/96 338 - FOR C/O ok for the fish and wildlife only signed the te occ rec card copy for this area only
|
INSP - Temporary occupancy | | | 10/25/1996 | | PASS |
|
|
|
Temp. Occ. Cert. #3306 issued 10-25-96 to U.S. Fish & Wildlife.
|
INSP - Final | 10/23/1996 | 10/24/1996 | 10/24/1996 | P | PASS |
Joe Tawney
|
|
|
10/24/96 406 - TIM WILCOMB - ###-#### 3RD FLR. FISH & WILDLIFE. OK FOR TEMP OCC
|
INSP - Partial final | 10/10/1996 | 10/11/1996 | 10/11/1996 | A | PASS |
|
|
|
10/10/96 338 - LATE A.M. FOR T/O. signeed the occ rec for the BLM only
|
INSP - Temporary occupancy | | | 10/11/1996 | | PASS |
|
|
|
Temp. Occ. Cert. #3294 issued 10-11-96 to BLM in the Penrose Bldg.
|
INSP-Sprinkler Rough-in/Hydro | 10/9/1996 | 10/10/1996 | 10/10/1996 | A | PASS |
Joe Tawney
|
|
|
10/10/96 406 - JIM LAFOND - PAGER:###-####
|
INSP - Ceiling grid | 10/3/1996 | 10/7/1996 | 10/6/1996 | A | PASS |
|
|
|
10/08/96 338 - 3RD FLR. BLM ì
|
INSP - Ceiling grid | 9/25/1996 | 9/26/1996 | 9/24/1996 | A | PASS |
|
|
|
09/26/96 338 - accoustical ceiling - 1st flr.
|
INSP - Ceiling grid | 9/19/1996 | 9/19/1996 | 9/18/1996 | P | NR |
|
|
|
09/19/96 338 - REINSPECT CEILING ( correction issued ok to start cover o wire install on the slack wires)
|
INSP - Ceiling grid | 9/16/1996 | 9/16/1996 | 9/16/1996 | P | NR |
Carl Dependahl
|
|
|
09/16/96 340 - 1ST FLR. POURING AT 3 P.M. ???? NR
|
INSP - Ceiling grid | 9/16/1996 | 9/16/1996 | 9/16/1996 | | NH |
Jim Storey
|
|
|
/ / 301 -
|
Meeting | | | 8/26/1996 | | |
|
|
|
Tim Wilcomb came in to request that existing permit be updated to include an office area on the third floor previously shown as not part of project - to be unfinished. Instructed Tim, after visiting with George Slane, to submit changes to Perry Paine, inspector for review and he will route them as he feels necessary to have added to plans and permit.
|
INSP - Ceiling grid | 8/22/1996 | 8/23/1996 | 8/23/1996 | A | PASS |
Jim Sly
|
|
|
08/22/96 316 - 2nd floor...OK
|
INSP - Ceiling grid | 8/16/1996 | 8/19/1996 | 8/19/1996 | A | FAIL |
Jim Sly
|
|
|
/ / 316 - 2ND FLR. Fail.....Not complete.
|
INSP - Carpentry | 7/12/1996 | 7/15/1996 | 7/15/1996 | A | PASS |
|
|
|
07/15/96 338 - "THERMAL FIBER BATTS" ...... batts are installed in the 2-hr wall
|
INSP - Framing/Rough-in | 5/31/1996 | 5/31/1996 | 5/31/1996 | | PART |
|
|
|
/ / 338 - corridor tunnels and 2nd floor
|
INSP - Framing/Rough-in | 5/28/1996 | 5/29/1996 | 5/30/1996 | P | PART |
|
|
|
05/29/96 338 - PM WED ok to start hanging drywall on the 2nd floor
|
INSP - Framing/Rough-in | 5/28/1996 | 5/28/1996 | 5/28/1996 | P | NR |
Carl Dependahl
|
|
|
05/28/96 340 - NR, DISCUSSED W 338, HE'LL DO TOMORROW
|
INSP - Framing/Rough-in | 5/13/1996 | 5/13/1996 | 5/13/1996 | P | PART |
|
|
|
05/13/96 338 - partial made ok ist floor corridor ares
|
INSP - Framing/Rough-in | 5/7/1996 | 5/8/1996 | 5/8/1996 | A | PART |
Jim Sly
|
|
|
05/07/96 316 - AM OK to cover 1 side of corridor walls so framers can frame for corridor ceilings. jim sly
|
Issue PAID IN FULL permit | | | 4/19/1996 | | |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 4/18/1996 | | PASS |
|
|
|
Permit ready for issue based on notes on plans & attachments to plans and a letter issued to the architect requiring a response to some outstanding questions.
|
Inspection Record Card- Bld | | | 4/18/1996 | | |
|
|
|
|
Permit taken to Permit Desk | | | 4/18/1996 | | PASS |
|
|
|
|
Plan Received by (DRS) | 2/16/1996 | | 4/18/1996 | | PASS |
Dan Stuart
|
|
|
04/18/96 13:28:10 DRS - this action updated by action script from <<>> in Case No. BLD95-2284
|
Routing - BUILDING | 2/16/1996 | | 4/18/1996 | | PASS |
|
|
|
Finished preliminary plan review, faxed copy to Art Knox and mailed copy.
|
Issue & PRINT FEE-DUE permit | | | 4/4/1996 | | |
|
|
|
|
Issue & PRINT FEE-DUE permit | | | 4/4/1996 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/4/1996 | | PART |
|
|
|
Request for partial permit made 4/4/96.
|
Plan resubmittals received | | | 4/4/1996 | | |
|
|
|
Received additonal plan changes for mechanical and electrical sheets.
|
Plan resubmittals received | | | 3/22/1996 | | |
|
|
|
Received plans in response to plan review comment - inserted into plans - will review at completion of hospital project review.
|
Routing - FIRE | 3/8/1996 | | 3/15/1996 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 3/8/1996 | | |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 3/8/1996 | | |
|
|
|
|
Meeting | | | 3/5/1996 | | |
|
|
|
Introductory meeting with Art Knox, Architect; Dennis L. Glaser, St. George's Holdings; Christopher Penrose, The Penrose Corp (TPC) & Bob Arnold, EISI Special Inspection Agency/Engineer for this project, to review plans, questions on fire proofing, duct penetrations thru bar joist webs without interfering with the fire proof spray protection, providing clarifications of plans - provided copy of beginning 18 questions/corrections review for plans. A complete list will be faxed & mailed as soon as the review is complete. Meeting of approx. 1-hour before plane time.
|
Unassigned to Plan Reviewer | 12/29/1995 | | 2/16/1996 | | PASS |
|
|
|
02/16/96 16:13:32 DRS - this action updated by action script from <<>> in Case No. BLD95-2284
|
Routing - PLUMBING | 1/11/1996 | | 1/19/1996 | | PASS |
|
|
|
|
Routing - MECHANICAL | 1/4/1996 | | 1/11/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 12/29/1995 | | 1/4/1996 | | PASS |
|
|
|
|
Application received | | | 12/29/1995 | | |
|
|
|
|
Plan routing begun/TENANTS | | | 12/29/1995 | | |
|
|
|
Route to Public Works, Mechanical, Plumbing then back to Plan Check. After Plan Check route to Fire Department.
|
Case Summary (BLD) | | | | | |
|
|
|
|
Routing - BUILDING | 1/19/1996 | | | | |
|
|
|
|
Routing - BUILDING | 3/15/1996 | | | | PEND |
|
|
|
|