Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberBLD95-02284
StatusFinaled
Name BUREAU OF LAND MANAGEMENT
Site Address 1387 S VINNELL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To finish all three floors of an existing shell building for offices per the approved plans on file. A total of approximately 80,125 square feet. All construction to be noncombustible, fire-resistive per Sec. 602 & Table 6-A UBC for Type 1-FR Construction. Interior finish to comply with Ch. * UBC. This building is fully fire sprinklered. Separate electrical, Mechanical & Plumbing permits are reguired. PC827-95/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/28/2010 DONE
Permanent Occupancy 11/22/199611/22/1996 DONE
Details
INSP - Permanent occupancy  11/22/1996 PASS
Perm. Occ. Cert. #6720 issued 11-22-96 to P-SG BOISE Natural Resource Center Phase I.
INSP - Occupancy Sign-off11/12/199611/13/199611/13/1996PPASS
Details
11/13/96 338 - temp signed
INSP - Occupancy Sign-off11/12/199611/13/199611/13/1996APASS
DetailsJoe Tawney
11/12/96 406 - OK FOR PERM OCC
INSP - Final10/24/199610/25/199610/25/1996APART
Details
10/25/96 338 - FOR C/O ok for the fish and wildlife only signed the te occ rec card copy for this area only
INSP - Temporary occupancy  10/25/1996 PASS
Temp. Occ. Cert. #3306 issued 10-25-96 to U.S. Fish & Wildlife.
INSP - Final10/23/199610/24/199610/24/1996PPASS
DetailsJoe Tawney
10/24/96 406 - TIM WILCOMB - ###-#### 3RD FLR. FISH & WILDLIFE. OK FOR TEMP OCC
INSP - Partial final10/10/199610/11/199610/11/1996APASS
Details
10/10/96 338 - LATE A.M. FOR T/O. signeed the occ rec for the BLM only
INSP - Temporary occupancy  10/11/1996 PASS
Temp. Occ. Cert. #3294 issued 10-11-96 to BLM in the Penrose Bldg.
INSP-Sprinkler Rough-in/Hydro10/9/199610/10/199610/10/1996APASS
DetailsJoe Tawney
10/10/96 406 - JIM LAFOND - PAGER:###-####
INSP - Ceiling grid10/3/199610/7/199610/6/1996APASS
Details
10/08/96 338 - 3RD FLR. BLM ì
INSP - Ceiling grid9/25/19969/26/19969/24/1996APASS
Details
09/26/96 338 - accoustical ceiling - 1st flr.
INSP - Ceiling grid9/19/19969/19/19969/18/1996PNR
Details
09/19/96 338 - REINSPECT CEILING ( correction issued ok to start cover o wire install on the slack wires)
INSP - Ceiling grid9/16/19969/16/19969/16/1996PNR
DetailsCarl Dependahl
09/16/96 340 - 1ST FLR. POURING AT 3 P.M. ???? NR
INSP - Ceiling grid9/16/19969/16/19969/16/1996 NH
DetailsJim Storey
/ / 301 -
Meeting  8/26/1996
Tim Wilcomb came in to request that existing permit be updated to include an office area on the third floor previously shown as not part of project - to be unfinished. Instructed Tim, after visiting with George Slane, to submit changes to Perry Paine, inspector for review and he will route them as he feels necessary to have added to plans and permit.
INSP - Ceiling grid8/22/19968/23/19968/23/1996APASS
DetailsJim Sly
08/22/96 316 - 2nd floor...OK
INSP - Ceiling grid8/16/19968/19/19968/19/1996AFAIL
DetailsJim Sly
/ / 316 - 2ND FLR. Fail.....Not complete.
INSP - Carpentry7/12/19967/15/19967/15/1996APASS
Details
07/15/96 338 - "THERMAL FIBER BATTS" ...... batts are installed in the 2-hr wall
INSP - Framing/Rough-in5/31/19965/31/19965/31/1996 PART
Details
/ / 338 - corridor tunnels and 2nd floor
INSP - Framing/Rough-in5/28/19965/29/19965/30/1996PPART
Details
05/29/96 338 - PM WED ok to start hanging drywall on the 2nd floor
INSP - Framing/Rough-in5/28/19965/28/19965/28/1996PNR
DetailsCarl Dependahl
05/28/96 340 - NR, DISCUSSED W 338, HE'LL DO TOMORROW
INSP - Framing/Rough-in5/13/19965/13/19965/13/1996PPART
Details
05/13/96 338 - partial made ok ist floor corridor ares
INSP - Framing/Rough-in5/7/19965/8/19965/8/1996APART
DetailsJim Sly
05/07/96 316 - AM OK to cover 1 side of corridor walls so framers can frame for corridor ceilings. jim sly
Issue PAID IN FULL permit  4/19/1996
Plan Reviewer's Copy of Permit  4/18/1996 PASS
Permit ready for issue based on notes on plans & attachments to plans and a letter issued to the architect requiring a response to some outstanding questions.
Inspection Record Card- Bld  4/18/1996
Permit taken to Permit Desk  4/18/1996 PASS
Plan Received by (DRS)2/16/1996 4/18/1996 PASS
DetailsDan Stuart
04/18/96 13:28:10 DRS - this action updated by action script from <<>> in Case No. BLD95-2284
Routing - BUILDING2/16/1996 4/18/1996 PASS
Finished preliminary plan review, faxed copy to Art Knox and mailed copy.
Issue & PRINT FEE-DUE permit  4/4/1996
Issue & PRINT FEE-DUE permit  4/4/1996
Plan Reviewer's activity  4/4/1996 PART
Request for partial permit made 4/4/96.
Plan resubmittals received  4/4/1996
Received additonal plan changes for mechanical and electrical sheets.
Plan resubmittals received  3/22/1996
Received plans in response to plan review comment - inserted into plans - will review at completion of hospital project review.
Routing - FIRE3/8/1996 3/15/1996 PASS
Plan resubmittals requested  3/8/1996
Plan Reviewer's Copy of Permit  3/8/1996
Meeting  3/5/1996
Introductory meeting with Art Knox, Architect; Dennis L. Glaser, St. George's Holdings; Christopher Penrose, The Penrose Corp (TPC) & Bob Arnold, EISI Special Inspection Agency/Engineer for this project, to review plans, questions on fire proofing, duct penetrations thru bar joist webs without interfering with the fire proof spray protection, providing clarifications of plans - provided copy of beginning 18 questions/corrections review for plans. A complete list will be faxed & mailed as soon as the review is complete. Meeting of approx. 1-hour before plane time.
Unassigned to Plan Reviewer12/29/1995 2/16/1996 PASS
02/16/96 16:13:32 DRS - this action updated by action script from <<>> in Case No. BLD95-2284
Routing - PLUMBING1/11/1996 1/19/1996 PASS
Routing - MECHANICAL1/4/1996 1/11/1996 PASS
Routing - PUBLIC WORKS12/29/1995 1/4/1996 PASS
Application received  12/29/1995
Plan routing begun/TENANTS  12/29/1995
Route to Public Works, Mechanical, Plumbing then back to Plan Check. After Plan Check route to Fire Department.
Case Summary (BLD)     
Routing - BUILDING1/19/1996  
Routing - BUILDING3/15/1996   PEND