Case Summary (BLD) | | | 5/29/2015 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 2/3/1999 | | PASS |
|
|
|
Final insp reveals project landscape completed. Bond ok to release.
|
INSP - Wall cover | 9/18/1996 | 9/18/1996 | 9/18/1996 | P | PASS |
Alan Hauser
|
|
|
09/18/96 350 - shear nailing ok talked to plumber about plumbing in 1 hr
|
INSP - Foundation | 8/22/1996 | 8/23/1996 | 8/23/1996 | P | PASS |
Alan Hauser
|
|
|
08/23/96 350 - SETBACKS AS PER PLAN REBAR HAS PROPER COVER HORIZONTALS O
|
CHANGE STATUS TO (D) | | | 8/16/1996 | | |
|
|
|
|
INSP - Foundation | 7/29/1996 | 7/30/1996 | 7/30/1996 | A | PASS |
Alan Hauser
|
|
|
07/30/96 350 - stem walls ok rebar has proper cover
|
INSP - Foundation | 7/24/1996 | 7/24/1996 | 7/24/1996 | P | PASS |
Alan Hauser
|
|
|
07/24/96 350 - FOOTINGS OK REBAR HAS PROPER COVER
|
INSP - Letter of compliance | 7/19/1996 | 7/19/1996 | 7/19/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11467
|
INSP - Final | 7/19/1996 | 7/19/1996 | 7/19/1996 | P | PASS |
Alan Hauser
|
|
|
07/19/96 350 - final ok
|
INSP - Letter of compliance | 7/19/1996 | 7/19/1996 | 7/19/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11467
|
INSP - Framing/Rough-in | 7/15/1996 | 7/16/1996 | 7/16/1996 | A | PASS |
Jim Sly
|
|
|
07/15/96 316 - FLOOR
|
INSP - Framing/Rough-in | 7/11/1996 | 7/11/1996 | 7/11/1996 | P | PASS |
Mike Jordan
|
|
|
07/11/96 50 - sub-floor UNDERFLOOR INSPECTION OK NEED TO REMOVE INSULATION FROM VENTILATION OPEN AND FINISH HEADERS AND TRIMMERS AT CRAWL OPENINGS
|
INSP - Foundation | 5/30/1996 | 5/30/1996 | 5/30/1996 | P | PASS |
Jim Sly
|
|
|
05/30/96 316 -
|
INSP - Foundation | 5/23/1996 | 5/24/1996 | 5/24/1996 | A | PASS |
Jim Sly
|
|
|
05/23/96 316 -
|
INSP - Foundation | 5/13/1996 | 5/14/1996 | 5/14/1996 | A | PASS |
Jim Sly
|
|
|
05/13/96 316 -
|
INSP - Foundation | 5/8/1996 | 5/9/1996 | 5/9/1996 | A | PASS |
Jim Sly
|
|
|
05/08/96 316 -
|
INSP - Footings | 4/25/1996 | 4/26/1996 | 4/26/1996 | A | PASS |
Jim Sly
|
|
|
04/25/96 316 - Footings and stem walls on 2nd bldg...need new permit #.
|
INSP - Framing/Rough-in | 4/19/1996 | 4/22/1996 | 4/22/1996 | A | PASS |
Jim Sly
|
|
|
04/19/96 316 - SHEAR WALL Extend sheathing down to attach to mud sill... shear wall panels OK.
|
INSP - Carpentry | 4/2/1996 | 4/2/1996 | 4/2/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Last townhouse wall inspection for 4 units adjacent to Gary lane.
|
INSP - Wall cover | 4/2/1996 | 4/2/1996 | 4/2/1996 | P | CANC |
Jim Sly
|
|
|
04/02/96 316 - DRY WALL NAILING. Inspected AM.
|
INSP - Carpentry | 3/27/1996 | 3/27/1996 | 3/27/1996 | P | PASS |
Jim Sly
|
|
|
03/27/96 316 - FIREWALL Townhouse wall inspection...Partial..1st bldg. 1/2 of (2) walls...East end. OK
|
INSP - Framing/Rough-in | 3/13/1996 | 3/14/1996 | 3/14/1996 | P | PASS |
Jim Sly
|
|
|
03/14/96 316 - FRAMING SUB-FLOOR ...OK Sub floor inspection complete.
|
INSP - Foundation | 3/11/1996 | 3/12/1996 | 3/12/1996 | A | PASS |
Jim Sly
|
|
|
Stem wall re-bar OK ...West side of Bldg. (1st bldg.)
|
INSP - Framing/Rough-in | 3/8/1996 | 3/11/1996 | 3/11/1996 | A | CANC |
Jim Sly
|
|
|
transfer to 401.
|
INSP - Framing/Rough-in | 3/11/1996 | 3/11/1996 | 3/11/1996 | A | PASS |
|
|
|
subfloor
|
INSP - Framing/Rough-in | 3/7/1996 | 3/8/1996 | 3/8/1996 | A | CANC |
Jim Sly
|
|
|
SUB-FLOOR FRAMING Cancelled.
|
INSP - Footings | 3/7/1996 | 3/7/1996 | 3/7/1996 | P | PASS |
Jim Sly
|
|
|
All footings under this permit now inspected and OK as per Jim Sly and Wes.
|
INSP - Footings | 3/6/1996 | 3/7/1996 | 3/7/1996 | A | NR |
Jim Sly
|
|
|
03/06/96 316 - Not ready
|
INSP - Footings | 3/4/1996 | 3/6/1996 | 3/6/1996 | P | FAIL |
Jim Sly
|
|
|
Correction notice...re-bar cover and possible pour over fill. Clean out loose material and call for re-inspection.
|
INSP - Foundation | 2/29/1996 | 2/29/1996 | 2/29/1996 | P | PASS |
Jim Sly
|
|
|
|
INSP - Foundation | 2/26/1996 | 2/27/1996 | 2/27/1996 | A | PASS |
Jim Sly
|
|
|
Checked re-bar...OK.
|
INSP - Footings | 2/22/1996 | 2/23/1996 | 2/23/1996 | A | PASS |
|
|
|
|
Plan Received by (PRP) | 1/31/1996 | | 2/22/1996 | | PASS |
|
|
|
prereview resulted in call to Bill to attend a conference with Architect to inform both the MINIMUM requirements for submittal of Multifamily project. Will need Resubmittal prior to Plan Review and Circulation. 02/22/96 11:32:02 PRP - this action updated by action script from <<>> in Case No. BLD96-0164
|
Print Pending Permit.LaserJet4 | | | 2/22/1996 | | PASS |
|
|
|
ISSUE
|
Routing - FIRE | 2/14/1996 | | 2/22/1996 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 2/22/1996 | | PASS |
|
|
|
REVIEW FIRES RESPONSE, INPUT TO PERMIT PLAN, ASSEMBLE, ISSUE.
|
Issue PAID IN FULL permit | | | 2/22/1996 | | |
|
|
|
|
Permit taken to Permit Desk | | | 2/22/1996 | | PASS |
|
|
|
ISSUE
|
Inspection Record Card- Bld | | | 2/22/1996 | | |
|
|
|
|
Plan resubmittals received | | | 2/14/1996 | | PASS |
|
|
|
received from arch 2/06/96. Plans returned to me from PW today. Assemble corrections into Plans.
|
Plan Reviewer's activity | | | 2/14/1996 | | PEND |
|
|
|
assemble resubs into plans and spec books, forward to Fire. Waiting for ACHD Cert then issue.
|
Routing - PUBLIC WORKS | 2/9/1996 | | 2/14/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/7/1996 | | 2/7/1996 | | FAIL |
|
|
|
SUBDIVISION NOT RECORDED
|
Routing - PLANNING | 2/2/1996 | | 2/7/1996 | | PASS |
|
|
|
X-ref: CU-53-93. Approved for lots 1-5 only. Approved by RLB.
|
Plan routing begun/NEW & ADDTN | | | 1/31/1996 | | PEND |
|
|
|
ROUTE TO P&Z, THEN TO PUBLIC WORKS, THEN FIRE DEPT. IF ACHD CERT NOT RECEIVED BY THEN, SEND TO ACHD, THEN TO BUILDING.
|
Plan Reviewer's activity | | | 1/31/1996 | | PEND |
|
|
|
PLAN REVIEW AND CORRECTION LIST, FAX TO ARCH, WAIT FOR PLOT PLAN FROM BILL, THEN CIRCULATE.
|
Unassigned to Plan Reviewer | 1/30/1996 | | 1/31/1996 | | PASS |
|
|
|
01/31/96 08:15:19 PRP - this action updated by action script from <<>> in Case No. BLD96-0164
|
Telephone call | | | 1/31/1996 | | PEND |
|
|
|
to Bill For Conference with Him and Architect at 1:30 PM today.
|
Plan resubmittals requested | 1/31/1996 | | 1/31/1996 | | |
|
|
|
|
Plans taken to Plan Check | | | 1/30/1996 | | |
|
|
|
|
Application received | | | 1/30/1996 | | |
|
|
|
|
GAY'S RECEIPT FOR PARTIAL PAY | | | 1/30/1996 | | |
|
|
|
|
Routing - BUILDING | 2/14/1996 | | | | PEND |
|
|
|
|
Routing - BUILDING | 2/22/1996 | | | | PEND |
|
|
|
|