Permanent occupancy | | | 8/24/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7365 issued 8-24-98 to Wal-Mart.
|
Permanent Occupancy | | 8/21/1998 | 8/21/1998 | | DONE |
|
|
|
|
Fee Review-notes | 7/14/1998 | | 7/14/1998 | | |
|
|
|
|
(F) Reprint permit | | | 2/19/1998 | | |
|
|
|
|
INSP - Final | 4/2/1997 | 4/3/1997 | 4/4/1997 | P | NR |
Carl Dependahl
|
|
|
04/03/97 340 - INSUFFICIENT INFO(WALMART?) NO ADDRESS POSTED, NO CONTACT
|
INSP-Final Inspection | 4/2/1997 | 4/3/1997 | 4/3/1997 | A | PASS |
Joe Tawney
|
|
|
04/03/97 406 - FINAL FOR C/O REINSP FOR C/O OK FOR PERM OCC SPKLR HEADS INSTALLED ALONG COMB WALL OTHER ITEMS COVERED ON STRUCT C/N
|
CHANGE STATUS TO (I) | | | 2/4/1997 | | FEE |
|
|
|
42.00 reinspection fee waived per ba/lh
|
INSP - Conference | 1/29/1997 | 1/29/1997 | 1/29/1997 | | PART |
|
|
|
/ / 338 - NO ORMOND PERSONELL ON SITE.....I SPOKE WITH JASON (COMANAGE THEY WERE OCCUPIED W/O A LEAL OCCUPANCY CERTIFICATE AND JUST A FEW MINUT TIME WITH THE OCC REC CARD DELIVERED TO THE BUILDING DEPT THAT A TEMP CE OCC WILL BE ISSUED.
|
INSP - Conference | 1/29/1997 | 1/29/1997 | 1/29/1997 | | PART |
|
|
|
/ / 338 - NO ORMOND PERSONELL ON SITE.....I SPOKE WITH JASON (COMANAGE THEY WERE OCCUPIED W/O A LEAL OCCUPANCY CERTIFICATE AND JUST A FEW MINUT TIME WITH THE OCC REC CARD DELIVERED TO THE BUILDING DEPT THAT A TEMP CE OCC WILL BE ISSUED.
|
INSP - Temporary occupancy | 1/27/1997 | 1/28/1997 | 1/28/1997 | P | PART |
|
|
|
01/28/97 338 - c/n issued
|
INSP - Final | 1/28/1997 | 1/28/1997 | 1/28/1997 | | PART |
|
|
|
OK FOR TEMP OCC THUMB TURNS LETTERING OVER DRS NON SPKLR COMBUST AREA ABOVE DROP CEILINGS 911 SIGN ON BELL
|
Temporary occupancy | | | 1/28/1997 | | PASS |
|
|
|
Temp. Occ. Cert. #3353 issued 1-28-97 to Wal-Mart.
|
INSP - Carpentry | 1/24/1997 | 1/24/1997 | 1/24/1997 | P | PART |
|
|
|
01/24/97 338 - FIRE BLOCK ON DEMIZING WALL....... will reinspect when o I will authorize the signing of the temp col sining of the occ rec card other sigs in place.....to call for reinspect on
|
Print Occupancy Form | | | 1/15/1997 | | |
|
|
|
|
INSP - Wall cover | 1/14/1997 | 1/14/1997 | 1/14/1997 | | FAIL |
|
|
|
/ / 338 -
|
INSP - Wall cover | 1/14/1997 | 1/14/1997 | 1/14/1997 | P | CANC |
|
|
|
01/14/97 338 - wal-mart cancelled by wallmart till mor reasonable time f same that this insp was the first call by ormond for an insp by the buil department
|
INSP - Wall cover | 1/14/1997 | 1/14/1997 | 1/14/1997 | | FAIL |
|
|
|
/ / 338 -
|
CHANGE STATUS TO (F) | | | 12/10/1996 | | |
|
|
|
$42 reinspection fee per Joe Tawney
|
INSP - Temporary occupancy | 12/9/1996 | 12/9/1996 | 12/9/1996 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK FOR TEMP OCC TO INSTALL FIXTURES AND STOCK SHELVES
|
INSP - Miscellaneous | 12/7/1996 | 12/7/1996 | 12/7/1996 | | PASS |
Joe Tawney
|
|
|
/ / 406 - OK ON HYDRO TEST FOR 3 WET PIPE SYSTEMS WALK THRU OF BLDG TO CONFIRM SYSTEMS INSTALLED ACCORDING TO PLANS
|
INSP - Miscellaneous | 12/6/1996 | 12/6/1996 | 12/6/1996 | | PASS |
Joe Tawney
|
|
|
/ / 406 - UNDERGROUND FLUSH OF PIPING FOR SPKLR SYSTEM OK
|
INSP - Final | 12/6/1996 | 12/6/1996 | 12/6/1996 | | NR |
Joe Tawney
|
|
|
/ / 406 - FINAL INSP FOR TEMP OCC ON 12/06/96 NR RESCH FOR 2/09/96
|
Plan Reviewer's activity | | | 9/17/1996 | | |
|
|
|
recieved resubmittals from dave radford and returned them to him as there have been n inspections called for as of this time.
|
Plan resubmittals received | | | 9/17/1996 | | |
|
|
|
referred plans back to the plan review dept as there have been no insp req as of this time.
|
Issue PAID IN FULL permit | | | 5/29/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/29/1996 | | |
|
|
|
|
Plan Received by (JCM) | 3/7/1996 | | 5/28/1996 | | PASS |
John Menard
|
|
|
05/28/96 10:36:19 JCM - this action updated by action script from <<>> in Case No. BLD96-0340
|
Permit taken to Permit Desk | | | 5/28/1996 | | PASS |
|
|
|
|
ISSUE OCCUPANCY FORM | | | 5/28/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/28/1996 | | |
|
|
|
|
Routing - PUBLIC WORKS | 5/13/1996 | | 5/14/1996 | | PASS |
|
|
|
PLANS PICKED UP & CARRIED TO PUBLIC WORKS BY KENT BROWN. PLANS APPEAR TO BE APPROVED, BUT HAVE NOT BEEN SIGNED BY PUBLIC WORKS.
|
Unassigned to Plan Reviewer | | | 4/22/1996 | | PASS |
|
|
|
04/22/96 16:12:41 JCM - this action updated by action script from <<>> in Case No. BLD96-0340
|
Routing Off Site - C.D.H | 4/16/1996 | | 4/22/1996 | | PASS |
|
|
|
Called Becky Briggs Engineering to take plans to CDH. 4/16/96 DAR
|
Routing - MECHANICAL | 4/10/1996 | | 4/15/1996 | | PASS |
|
|
|
|
Routing - FIRE | 4/8/1996 | | 4/10/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/4/1996 | | 4/8/1996 | | FAIL |
|
|
|
OK FOR GRADING PERMIT PER JIM RICH. 4/8/96 DAR
|
Routing Off Site - A.C.H.D | 3/22/1996 | | 4/4/1996 | | PASS |
|
|
|
ACHD FEES NOT PAID. 4/4/96 DAR OK FOR GRADING. A.C.H.D. IMPACT FEES PAID 04/26/96 - CERT. #96-1666
|
Review - OTHER | 3/20/1996 | | 4/3/1996 | | PEND |
|
|
|
ONE SET OF PLANS AND ONE SET OF STRUCTURAL CALCS. SENT TO STAPLEY ENGINEERING. KMM STAPLEY FINISHED THE STRUCTURAL PLAN REVIEW ON 04/03/96, BUT DID NOT SEND A COPY TO THE APPLICANT. A COPY OF STAPLEY'S REVIEW COMMENTS WERE FAXED TO BILLY BAER ON 04/22/96. JCM
|
Routing - PUBLIC WORKS | 3/20/1996 | | 3/22/1996 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 3/19/1996 | | PEND |
|
|
|
CORRECTION LIST SENT TO ARCHITECT OF RECORD - 03/19/96
|
Routing - BUILDING | 3/7/1996 | | 3/19/1996 | | PEND |
|
|
|
|
Routing - PLUMBING | 3/5/1996 | | 3/7/1996 | | PASS |
|
|
|
|
Routing - ELECTRICAL | 3/5/1996 | | 3/5/1996 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/27/1996 | | 3/4/1996 | | FAIL |
|
|
|
|
Routing - PLANNING | 2/21/1996 | | 2/23/1996 | | PASS |
|
|
|
Approved by RLB, X-ref: CU-89-95. Approved by TKW, X-ref: DR-139-95. Send back to Tempra prior to issuance of a permit. DAR 2/27/96 Tempra has required access agreement and has indicated that the permit is approved for issue. JCM 05/24/96
|
Plan routing begun/NEW & ADDTN | | | 2/21/1996 | | PASS |
|
|
|
|
Application received | | | 2/20/1996 | | |
|
|
|
|
GAY'S RECEIPT FOR PARTIAL PAY | | | 2/20/1996 | | |
|
|
|
|
Received Certificate of Value | | | 2/20/1996 | | PASS |
|
|
|
|
Routing - BUILDING | 4/22/1996 | | | | PEND |
|
|
|
|
Routing - BUILDING | 5/14/1996 | | | | PEND |
|
|
|
|