Permit Information
Permit NumberBLD96-00351
StatusFinaled
Name JEFF JOHNSON
Site Address 7979 W RIFLEMAN ST
Project NameFAMILY VISION CLINIC
Customer Number 
ePlanReviewNo
Description
MEDICAL OFFICE BUILDING * TO CONSTRUCT A NEW 9,331 SQ FT TWO STORY WOOD FRAMED TYPE V 1-HOUR OFFICE BUILDING WITH FUTURE TENANT SPACE. THE SECOND FLOOR IS FUTURE OFFICE SPACE OF 912 SQ.FT. - 3,091 SQ. FT. IS FOR FUTURE TENANT SPACE ON THE FIRST FLOOR. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST, CABO/ANSI STANDARDS, AND THE 1994 EDITION OF THE UBC. SITE IMPROVEMENTS TO INCLUDE LANDSCAPE, PARKING, DRAINAGE, SEWER, WATER, AND GAS AS PER PLANS, AND AS NEEDED FOR FUTURE TENANT IMPROVEMENTS. A SEPARATE PERMIT AND CERTIFICATE OF OCCUPANCIES WILL BE REQUIRED FOR ANY FUTURE TENANT SPACE IMPROVEMENTS. MJP (PC# 073-96) DR# 117-95
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/17/199612/17/1996 DONE
Details
INSP - Permanent occupancy  12/17/1996 PASS
Perm. Occ. Cert. #6736 issued 12-17-96 to the Family Vision Clinic.
INSP - Final12/2/199612/2/199612/2/1996PPASS
DetailsJoe Tawney
12/02/96 406 - OK FOR PERM OCC FOR THE OPTICAL SHOPPE
INSP - Temporary occupancy  11/15/1996 PASS
Temp. Occ. Cert. #3316 issued 11-15-96 to the Family Vision Clinic.
INSP - Occupancy Sign-off11/14/199611/12/199611/12/1996 F
Insp. by Art Yingling - meets compliance w/DR-117-95-Final Occ. signed.
INSP - Final11/7/199611/7/199611/7/1996APASS
DetailsJoe Tawney
11/07/96 406 - GLEN HICKEY VP ###-#### OK FOR TEMP OCC
INSP - Final11/6/199611/6/199611/6/1996AFAIL
DetailsJoe Tawney
11/06/96 406 - GLEN HICKEY - VP-###-#### FAILED HARDWARE ON EXIT DOORS NOT CORRECT C/N WRITTEN
INSP - Final11/4/199611/5/199611/5/1996 FAIL
FAIL HARDWARE ON DOORS NEEDS TO BE CHANGED ELECT NOT COMPLETE SOME EXIT DOORS DO NOT SWING OUT
INSP - Final11/1/199611/4/199611/4/1996APASS
Details
11/04/96 338 - not ready
INSP - Ceiling grid10/28/199610/29/199610/29/1996APASS
Details
10/29/96 338 - made ok
INSP - Framing/Rough-in10/1/199610/1/19969/30/1996PPASS
Details
10/01/96 338 - made ok other agencies signed off
INSP - Framing/Rough-in9/26/19969/27/19969/26/1996PPART
Details
09/27/96 338 - LATE PM made ok to cover with other trades blessing
INSP - Wall cover8/22/19968/22/19968/22/1996PPART
Details
08/22/96 338 - need proper letter seals for acceptance
INSP - Conference8/14/19968/14/19968/14/1996APART
DetailsWes Worcester
talked to Perry @ covering
INSP - Carpentry8/12/19968/13/19968/13/1996AFAIL
DetailsWes Worcester
covering.... called general to uncover and stop from covering
INSP - Conference8/13/19968/13/19968/13/1996PFAIL
DetailsWes Worcester
talked to general again and referred to Perry
INSP - Footings6/21/19966/21/19966/21/1996 PASS
Details
06/21/96 338 - R-BAR PLACED FDN -OK FOUNDATION
INSP - Conference6/20/19966/20/19966/20/1996 PASS
Details
/ / 338 - UPDATE WP
INSP - Foundation6/20/19966/20/19966/20/1996PFAIL
Details
06/20/96 338 - LATE P.M. RECIEVED THE LETTER REQUESTED WORK NOT COMPLET REINSPECT 3:03 PM
INSP - Foundation6/17/19966/18/19966/18/1996PFAIL
Details
06/18/96 338 - TUESDAY...P.M. (EARLY) not ready c/n in force must pass poured w/o same. forms not complete r-bar clearence dirty concrete etc
Routing Off Site - A.C.H.D6/14/1996 6/15/1996 PASS
received copy of certificate
Plan Reviewer's activity  6/14/1996 PASS
Issue PAID IN FULL permit  6/14/1996
ISSUE OCCUPANCY FORM  6/14/1996
Permit taken to Permit Desk  6/14/1996 PASS
Plan Reviewer's Copy of Permit  6/14/1996 PASS
Inspection Record Card- Bld  6/14/1996
Plan Received by (M_P)3/28/1996 6/14/1996 PASS
DetailsMike Phillips
06/14/96 08:22:25 KMM - this action updated by action script from <<>> in Case No. BLD96-0351
Routing - PUBLIC WORKS5/15/1996 5/20/1996 PASS
Routing - PUBLIC WORKS5/1/1996 5/6/1996 FAIL
Routing - FIRE4/29/1996 4/30/1996 PASS
Routing - PUBLIC WORKS4/8/1996 4/10/1996 FAIL
Plan Reviewer's Copy of Permit  3/30/1996 FAIL
Routing - MECHANICAL3/27/1996 3/28/1996 PASS
Unassigned to Plan Reviewer  3/28/1996 PASS
03/30/96 14:16:58 M_P - this action updated by action script from <<>> in Case No. BLD96-0351
Routing - PLUMBING3/21/1996 3/26/1996 PASS
Routing - ELECTRICAL3/13/1996 3/21/1996 PASS
Routing - PUBLIC WORKS3/7/1996 3/13/1996 FAIL
Routing Off Site - A.C.H.D3/5/1996 3/7/1996 PEND
CONTACTED GLENN HICKEY FOR ACHD PICKUP AT ###-####. ACHD FEES NOT PAID. DAR 3/7/96
Routing - PLANNING2/22/1996 3/4/1996 PASS
Approved by MS. X-ref: DR-117-95.
Plan routing begun/NEW & ADDTN  2/22/1996 PASS
Received Certificate of Value  2/21/1996 PASS
GAY'S RECEIPT FOR PARTIAL PAY  2/21/1996
Plans taken to Plan Check  2/21/1996
Application received  2/21/1996
INSP - Final11/6/199611/7/19961/3/1980PPART
Details
11/08/96 338 - temp occ made ok signed the temp col still need achd pw
Routing Off Site - STRUCTURAL4/30/1996   PEND
3RD. SET RESUBMITTAL WAS SENT OUT TO STAPLEY ENG.
Routing - BUILDING4/10/1996   PEND
Routing Off Site - STRUCTURAL6/13/1996   PASS
Routing - BUILDING3/30/1996   FAIL
CORRECTION NOTICE SENT
Routing - BUILDING3/28/1996   PEND
Routing - BUILDING5/22/1996   PEND