Permanent Occupancy | | 8/28/1996 | 8/28/1996 | | DONE |
|
|
|
|
INSP - Permanent occupancy | | | 8/28/1996 | | PASS |
|
|
|
Perm. Occ. Cert. #6546 issued 8-28-96 to the Boise City Clerk's Archive Facility.
|
INSP - Final | 8/22/1996 | 8/26/1996 | 8/26/1996 | A | PASS |
Jim Storey
|
|
|
08/26/96 301 - FNL -OK FINAL
|
INSP - Conference | 8/19/1996 | 8/19/1996 | 8/19/1996 | | FAIL |
Jim Storey
|
|
|
/ / 301 - c/n stil in efect on stair tread length min 11 inches.
|
INSP - Temporary occupancy | | | 8/19/1996 | | PASS |
|
|
|
Temp. Occ. Cert. #3259 issued 8-16-96 to the Boise City Clerk's Archive facility.
|
INSP - Final | 8/16/1996 | 8/16/1996 | 8/16/1996 | P | PART |
Jim Storey
|
|
|
08/16/96 301 - 1:30 FRI. P.M. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED TCO -TEMP C OF O ISSUED
|
INSP - Conference | 7/11/1996 | 7/11/1996 | 7/11/1996 | | PART |
Jim Sly
|
|
|
/ / 316 - City archives..(Don Hackey) received OK to move archives to floor only...Told contractor to have Don call me in order to verify who gave the OK for the move.
|
INSP - Conference | 6/25/1996 | 6/25/1996 | 6/25/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Met with Ken..superintendant to discuss new calculations for existing column footings....needs no reinforcement. Copy of calcs in approved set at city...1 to contractor.
|
INSP - Conference | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Dropped off letter of transmittal for 2nd resubmittal of foo detail...to include engineering calcs and stamp.
|
INSP - Framing/Rough-in | 6/18/1996 | 6/19/1996 | 6/19/1996 | P | PASS |
Jim Sly
|
|
|
06/18/96 316 - OK..Need engineering for footings before pour...walls etc for cover.
|
INSP - Framing/Rough-in | 6/10/1996 | 6/10/1996 | 6/10/1996 | P | FAIL |
Jim Sly
|
|
|
06/10/96 316 - Met with Ken...job superintendant... went over plan check and walk thru for framing corrections.... not ready for full framing inspection.
|
90 day tracking............. | | 3/7/1996 | 6/5/1996 | | PASS |
|
|
|
|
(F) Reprint permit | | | 4/19/1996 | | |
|
|
|
|
Plan Reviewer's Copy of Permit | | | 4/18/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/18/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/1996 | | |
|
|
|
|
Permit taken to Permit Desk | | | 4/18/1996 | | PASS |
|
|
|
|
Routing - BUILDING | 4/8/1996 | | 4/18/1996 | | PASS |
|
|
|
Approved after resubmittal review.
|
Received Certificate of Value | 4/18/1996 | | 4/18/1996 | | |
|
|
|
|
Plan resubmittals received | 4/18/1996 | | 4/18/1996 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan Received by (CJW) | 3/28/1996 | | 4/18/1996 | | PASS |
Carl Westfall
|
|
|
04/18/96 11:23:35 CJW - this action updated by action script from <<>> in Case No. BLD96-0490
|
Routing - FIRE | 4/2/1996 | | 4/8/1996 | | PASS |
|
|
|
|
Plan resubmittals requested | 4/2/1996 | | 4/2/1996 | | |
|
|
|
Three (3) items require a response.
|
Routing - BUILDING | 3/28/1996 | | 4/2/1996 | | FAIL |
|
|
|
UBC plan check complete. Three (3) items require a response.
|
Plan Reviewer's Copy of Permit | | | 4/2/1996 | | |
|
|
|
|
Waiting for Cert. of Value | 4/2/1996 | | 4/2/1996 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/27/1996 | | 3/28/1996 | | PASS |
|
|
|
|
Plan routing begun/TENANTS | | | 3/26/1996 | | |
|
|
|
Route plan to Planning Department and Public Works then back to Plan Check. After Plan Check route to Fire Department.
|
Routing - PLANNING | 3/26/1996 | | 3/26/1996 | | PASS |
|
|
|
Approved by SRS.
|
Application received | | | 3/7/1996 | | |
|
|
|
|
GAY'S RECEIPT FOR PARTIAL PAY | | | 3/7/1996 | | |
|
|
|
|
Plans taken to Plan Check | | | 3/7/1996 | | PASS |
|
|
|
|
Routing - BUILDING | 4/8/1996 | | | | PEND |
|
|
|
|
Routing - BUILDING | 3/28/1996 | | | | PEND |
|
|
|
|
Unassigned to Plan Reviewer | 3/7/1996 | | | | |
|
|
|
|