CHANGE STATUS TO (D) | | | 9/10/1997 | | |
|
|
|
|
INSP - Letter of compliance | 9/3/1997 | 9/3/1997 | 9/4/1997 | P | PASS |
Wes Worcester
|
|
|
c/c issued after mech c/n done
|
INSP - Grading Inspection | 9/4/1997 | | 9/4/1997 | | PASS |
Rita DeYoung
|
|
|
Grading and revegetation are completed. Site work is approved by Public Works.
|
INSP - Final | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | PASS |
Wes Worcester
|
|
|
LATE PM NOT AT 1:30 AS YOU PLAN LATE PM
|
INSP - Energy code compliance | 8/7/1996 | 8/7/1996 | 8/7/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 8/7/1996 | 8/7/1996 | 8/7/1996 | P | PASS |
Wes Worcester
|
|
|
still working on gable wall
|
INSP - Conference | 8/7/1996 | 8/7/1996 | 8/7/1996 | P | PASS |
Wes Worcester
|
|
|
met w/engineer and he is drawing up something for Kerr
|
INSP - Framing/Rough-in | 8/6/1996 | 8/6/1996 | 8/6/1996 | P | NR |
Wes Worcester
|
|
|
REINSPECT FRAME
|
INSP - Conference | 8/2/1996 | 8/2/1996 | 8/2/1996 | A | FAIL |
Wes Worcester
|
|
|
framing sub called reference c/n placed originally and added for second time when not done. I had went over c/n with Larry Kerr previously..Several items still not done
|
INSP - Framing/Rough-in | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | PART |
Wes Worcester
|
|
|
0k to insulate
|
INSP - Framing/Rough-in | 7/30/1996 | 7/31/1996 | 7/31/1996 | P | FAIL |
Wes Worcester
|
|
|
truss bracing, overheighth gable wall
|
INSP - Framing/Rough-in | 7/24/1996 | 7/25/1996 | 7/25/1996 | A | FAIL |
Wes Worcester
|
|
|
truss eng not done, plans not on site, tji in contact w/concrete, mech c/n, gable wall over 10' w/excessive deflection
|
INSP - Foundation | 6/14/1996 | 6/17/1996 | 6/16/1996 | A | PART |
Wes Worcester
|
|
|
06/14/96 342 - REBAR for z that was poured out of position and SW retain waiting on eng report for fix of z...Marcum said they might as well call eng whenever they pour rather than the Building Dept (specifically inspe
|
INSP - Foundation | 5/3/1996 | 5/3/1996 | 5/3/1996 | | NR |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Foundation | 5/3/1996 | 5/3/1996 | 5/3/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - poured w/o insp, was not reaady yesterday nor the day before crew yesterday to get it ready and call for insp. They did not have bar off nor clearance in several locations. no access to forms either. I cra up side forms, twis
|
INSP - Foundation | 5/7/1996 | 5/7/1996 | 5/1/1996 | P | NR |
Wes Worcester
|
|
|
05/07/96 342 - TUES.PM. LATE ì
|
INSP - Foundation | 5/1/1996 | 5/2/1996 | 4/26/1996 | A | CANC |
Wes Worcester
|
|
|
05/02/96 342 - LATE A.M. Referred to Bob Archibald
|
INSP - Foundation | 5/1/1996 | 5/1/1996 | 4/26/1996 | P | NR |
Wes Worcester
|
|
|
05/01/96 342 -
|
INSP - Footings | 4/19/1996 | 4/22/1996 | 4/22/1996 | A | PASS |
Wes Worcester
|
|
|
POURED AND ENGINEER HAS BEEN CALLED
|
INSP - Footings | 4/19/1996 | 4/19/1996 | 4/19/1996 | P | PART |
Wes Worcester
|
|
|
pm later Hillside applies and will have eng address as builts
|
Print Pending Permit.LaserJet4 | | | 3/19/1996 | | PASS |
|
|
|
FILES
|
Print Pending Permit.LaserJet4 | | | 3/19/1996 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/19/1996 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/19/1996 | | |
|
|
|
|
Plan Received by (PRP) | 3/19/1996 | | 3/19/1996 | | PASS |
|
|
|
ALL REVIEW OK, CORRECTION LIST ATTACHED, ISSUE
|
Permit taken to Permit Desk | | | 3/19/1996 | | PASS |
|
|
|
ISSUE
|
Unassigned to Plan Reviewer | 11/21/1996 | | 3/19/1996 | | PASS |
|
|
|
03/19/96 09:49:07 PRP - this action updated by action script from <<>> in Case No. BLD96-0571
|
Plans taken to Plan Check | | | 3/18/1996 | | PASS |
|
|
|
|
Routing - PLANNING | 3/14/1996 | | 3/18/1996 | | PASS |
|
|
|
Approved by RC.
|
Application received | | | 3/14/1996 | | |
|
|
|
|
Routing - PUBLIC WORKS | 11/21/1995 | | 3/14/1996 | | PASS |
|
|
|
|
Routing - FRONT DESK | 3/18/1996 | | | | PEND |
|
|
|
|