Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-00575
StatusFinaled
Name CHEVRON C STORE
Site Address 6450 S EISENMAN RD
Project NameCHEVRON C-STORE
Customer Number 
ePlanReviewNo
Description
TO CONSTRUCT A NEW 8150 SQ.FT. SINGLE STORY CONVENENIENCE STORE, RELATED FUEL ISLAND CANOPY AND 772 SQ.FT. CAR WASH. THE CONSTRUCTION TO BE CONCRETE MASONRY TYPE V-NONRATED 2500 SQ.FT. CONVENIENCE STORE AND 5650 SQ.FT. NONCOMBUSTIBLE FUEL ISLAND CANOPY & RELATED SITE IMPROVEMENTS. THERE SHALL BE NO SIT DOWN DINING WITHIN THIS BUILDING. MJP (PC#130-96) DR#-142-95
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  10/31/1997 PASS
Perm. Occ. Cert. #7041 issued 10-31-97 to the Chevron C Store.
INSP - Final10/29/199710/30/199710/30/1997APASS
DetailsJim Storey
10/29/97 301 - EVERYTHING ELSE IS FINALED
Routing for occupancy10/29/1997 10/28/1997 PASS
Final Occupancy signed by: Scott M. Brown.
INSP-Final Inspection10/2/199710/3/199710/3/1997APASS
DetailsRick Jackson
CHEVRON STORE c/o signed
Temporary occupancy  5/1/1997 PASS
Temp. Occ. Cert. #3399 issued 5-1-97 to the Chevron C-Store.
INSP - Final4/29/19974/30/19974/30/1997PPART
DetailsJim Storey
04/30/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED tenp ok contractor has card.
INSP - Final4/28/19974/28/19974/28/1997PNR
DetailsJim Storey
04/28/97 301 - SEWER EJECTION PUMB
INSP - Final4/28/19974/28/19974/28/1997PPART
Details
JACK ###-#### temp occ ok, rear exit door has knob, needs lever
INSP - Ceiling grid4/14/19974/14/19974/14/1997 PART
DetailsJim Storey
04/14/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in3/20/19973/20/19973/20/1997PPASS
DetailsGeorge Slane
INSP - Framing/Rough-in3/14/19973/17/19973/17/1997APART
DetailsJim Storey
03/17/97 301 - FRAM-OK FRAMING OTH-OTHER AGENCIES NOT APPROVED mec
INSP - Framing/Rough-in3/6/19973/6/19973/6/1997PNR
DetailsJim Storey
03/06/97 301 - WIP -WORK IN PROGRESS
INSP - Masonry2/26/19972/27/19972/27/1997APASS
DetailsJim Storey
02/27/97 301 - FRMS-OK FORMS-REBAR
INSP - Masonry2/24/19972/25/19972/25/1997AFAIL
DetailsJim Storey
02/25/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OR SUPLLY ENGINEERING TO JUST
INSP - Masonry2/25/19972/25/19972/25/1997PFAIL
DetailsJim Storey
02/25/97 301 - C/N POSTED
INSP - Masonry2/24/19972/24/19972/24/1997PNR
DetailsJim Storey
02/24/97 301 -
INSP - Masonry2/18/19972/18/19972/18/1997 PASS
DetailsJim Storey
/ / 301 - MASN-REBAR OK
INSP - Masonry2/14/19972/18/19972/18/1997ANR
DetailsJim Storey
02/18/97 301 - WIP -WORK IN PROGRESS
INSP - Footings1/6/19971/7/19971/7/1997APART
DetailsJim Storey
01/07/97 301 - special insp required scope of work to be submited, 3500
INSP - Footings1/6/19971/6/19971/6/1997PCANC
DetailsJim Storey
01/06/97 301 - cancled by contractor via phone.
INSP-Conference11/21/199611/21/199611/21/1996 PART
Details
witnessed bedding of three UST and verified tank cert #'s UL898261, UL898262, UL898259. Will not cover above invert before reinspection
(F) Reprint permit  11/19/1996
(F) Reprint permit  11/6/1996
Issue PAID IN FULL permit  11/5/1996
Inspection Record Card- Bld  10/31/1996
Plan Reviewer's activity  10/28/1996 PASS
READTY TO ISSUE PERMIT. CAR WASH IS INCLUDED ON THIS PERMIT PER PLANNING APPROVAL LETTER DATED JUNE 27,96.
Print Occupancy Form  10/28/1996
Inspection Record Card- Bld  10/28/1996
Print Occupancy Form  10/28/1996
Inspection Record Card- Bld  10/28/1996
Telephone call  10/28/1996
TELEPHONED MIKE BAKER AT WESTERN PACIFIC DEVELOPMENT - HE'S NOT SURE THAT HE'S DOING THIS OR ANOTHER GENERAL CONTRACTOR
Telephone call  10/28/1996
LEFT MESSAGE WITH ROGER FOSTER - HE IS TO CALL ME BACK
Print Pending Permit.LaserJet4  10/28/1996 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/28/1996 PASS
Plan Received by (M_P)6/4/1996 10/28/1996 PASS
DetailsMike Phillips
SENT CORRECTIONS. PROBLEM WITH TO MANY STRUCTURES ON PROPERTY. PLANNING DEPARTMENT HAS NOT APPROVED THE CAR WASH. 10/28/96 10:57:31 DAR - this action updated by action script from <<>> in Case No. BLD96-0575
Routing Off Site - A.C.H.D10/25/1996 10/25/1996 PASS
RECEIVED ACHD FEE RECEIPT
Routing Off Site - A.C.H.D8/13/1996 10/9/1996 PEND
CONTACTED ROGER FOSTER FOR ACHD PICKUP. HOLD FEES ARE NOT PAID.`
Routing - PLUMBING8/13/1996 8/13/1996 PASS
Routing - PUBLIC WORKS8/8/1996 8/12/1996 PASS
Routing - PLUMBING7/19/1996 7/27/1996 FAIL
Routing - PUBLIC WORKS7/18/1996 7/19/1996 FAIL
Plan Reviewer's activity  7/17/1996 PEND
COMPLETED PLAN REVIEW WAITING FOR ACHD APPROVAL PRIOR TO ISSUING PERMIT.
Routing - FIRE6/6/1996 6/10/1996 PASS
Plan Reviewer's activity  6/5/1996 FAIL
CAR WASH IS NOT APPROVED TO BE BUILT AT THIS TIME. DESIGN REVIEW HAS NOT APPROVED THE CONSTRUCTION OF THE CAR WASH BUILDING AND REQUIRES AVIGATION EASEMENT TO BE ISSUED.
Plan Reviewer's Copy of Permit  6/5/1996 FAIL
Unassigned to Plan Reviewer3/14/1996 6/5/1996 PASS
06/05/96 13:19:52 M_P - this action updated by action script from <<>> in Case No. BLD96-0575
Routing - ELECTRICAL5/30/1996 6/3/1996 PASS
WILL FIELD VERIFY
Routing - MECHANICAL5/23/1996 5/30/1996 PASS
Routing - PLUMBING5/20/1996 5/22/1996 FAIL
Routing - PUBLIC WORKS5/3/1996 5/7/1996 FAIL
REQUIRES DRAINAGE PLAN
Routing Off Site - C.D.H3/26/1996 5/3/1996 PASS
CONTACTED ROGER FOSTER AT ###-#### FOR CDH PICKUP.
Routing Off Site - A.C.H.D3/26/1996 5/3/1996 FAIL
CONTACTED ROGER FOSTER AT ###-#### FOR ACHD PICKUP.
Routing - PLANNING3/20/1996 3/26/1996 PASS
X-ref: DR-142-95. Approved by MS.
Plan routing begun/NEW & ADDTN  3/20/1996 PASS
Received Certificate of Value  3/14/1996 PASS
GAY'S RECEIPT FOR PARTIAL PAY  3/14/1996
Application received  3/14/1996
Plans taken to Plan Check  3/14/1996
Routing - BUILDING6/10/1996   PEND
Routing - BUILDING6/3/1996   PEND
Routing - BUILDING8/13/1996   PEND
Routing - BUILDING7/24/1996   PEND