Case Summary (BLD) | | | 3/21/2013 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 6/10/1999 | | PASS |
|
|
|
Bond released w/o final sign off. All landscape, paving, stripping and marking of handicapped spaces is completed. Final not signed at this time because of the Fountain issue. FINAL SIGNED OFF AS SCULPTURE DONE.
|
Print Occupancy Form | | | 10/8/1998 | | |
|
|
|
|
(F) Reprint permit | | | 10/8/1998 | | |
|
|
|
|
(F) Reprint permit | | | 8/4/1998 | | PASS |
|
|
|
|
Fee Review-notes | 7/15/1998 | | 7/22/1998 | | SUBS |
|
|
|
|
INSP - Final | 7/16/1998 | 7/16/1998 | 7/16/1998 | A | PASS |
|
|
|
07/16/98 333 - FNL -OK FINAL
|
(F) Reprint permit | | | 7/16/1998 | | |
|
|
|
|
Permanent Occupancy | | 7/15/1998 | 7/15/1998 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/15/1998 | 7/15/1998 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/15/1998 | | PASS |
|
|
|
Perm. Occ. Cert. #7319 issued 7-15-98 to the Westcoast Hotel & Events Center.
|
CHANGE STATUS TO (I) | | | 7/15/1998 | | |
|
|
|
|
Receive PAYMENT IN FULL | | | 7/15/1998 | | |
|
|
|
|
INSP - Final | 7/14/1998 | 7/14/1998 | 7/14/1998 | | PART |
|
|
|
/ / 333 - PROFIT MEETING
|
INSP - Final | 6/29/1998 | 6/29/1998 | 6/29/1998 | | PART |
|
|
|
/ / 333 - TALKED TO ROGER ABOUT FINAL REQUIREMENTS
|
(F) Reprint permit | | | 6/23/1998 | | |
|
|
|
|
CHANGE STATUS TO (F) | | | 6/23/1998 | | |
|
|
|
|
INSP - Final | 6/16/1998 | 6/16/1998 | 6/16/1998 | | FAIL |
|
|
|
/ / 333 - CN PLACED TEMP EXPIRED
|
INSP - Final | 6/11/1998 | 6/11/1998 | 6/11/1998 | A | FAIL |
|
|
|
06/11/98 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Alarm Testing | 5/12/1998 | 5/12/1998 | 5/12/1998 | P | PART |
Rick Jackson
|
|
|
tested alarms and door holders for 14th floor shell - okay. need to recheck penetrations by stair 3.
|
INSP-Final Inspection | 5/11/1998 | 5/11/1998 | 5/11/1998 | P | PART |
Rick Jackson
|
|
|
14th floor core and shell temp occ approved. corridor near stair 3 not complete. escutcheons for 2 sprinklers near stair 2. strobe not within 15 feet near stair 3.
|
INSP - Final | 3/26/1998 | 3/26/1998 | 3/26/1998 | | PART |
|
|
|
/ / 333 - profit meeting
|
(F) Reprint permit | | | 3/18/1998 | | |
|
|
|
|
INSP - Framing/Rough-in | 3/16/1998 | 3/16/1998 | 3/16/1998 | A | PART |
|
|
|
03/16/98 333 - talked with Skip about resub on corridor doors
|
INSP-Final Inspection | 3/11/1998 | 3/11/1998 | 3/11/1998 | P | FAIL |
|
|
|
dave ###-#### 3rd floor not ready - walked through....need to add strobe to view suite
|
INSP - Framing/Rough-in | 3/3/1998 | 3/4/1998 | 3/4/1998 | | NR |
|
|
|
03/04/98 333 - wrong permit # 15th floor at 2:00, if possible - see the ofc.
|
Print Occupancy Form | | | 3/3/1998 | | |
|
|
|
|
Temporary occupancy | | | 3/3/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3562 issued 3-3-98 to the Westcoast Hotel for the 2nd floor meeting rooms.
|
Temporary occupancy | | | 3/3/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3563 issued 3-3-98 to the Westcoast Hotel for the 13th floor hotel rooms.
|
Print Occupancy Form | | | 3/3/1998 | | |
|
|
|
|
Print Occupancy Form | | | 3/3/1998 | | |
|
|
|
|
INSP - Conference | 2/5/1998 | 2/5/1998 | 2/5/1998 | | PASS |
|
|
|
/ / 333 - resubmittal of sprink at 3rd floor suites
|
INSP - Conference | 1/22/1998 | 1/22/1998 | 1/22/1998 | | PART |
|
|
|
/ / 333 - discussed damper issues and shafts with roger
|
INSP - Framing/Rough-in | 1/21/1998 | 1/21/1998 | 1/21/1998 | A | PASS |
|
|
|
01/21/98 333 - 13 ok
|
INSP - Final | 1/21/1998 | 1/21/1998 | 1/21/1998 | P | PART |
|
|
|
01/21/98 333 - 11 and 12 ok for temp
|
INSP - Final | 1/20/1998 | 1/20/1998 | 1/20/1998 | | FAIL |
|
|
|
/ / 333 - 12th floor not ready
|
INSP - Final | 1/16/1998 | 1/16/1998 | 1/16/1998 | P | FAIL |
|
|
|
11 not ready
|
Print Occupancy Form | | | 1/16/1998 | | |
|
|
|
|
Temporary occupancy | | | 1/16/1998 | | PASS |
|
|
|
Temp. Occ. Cert. #3538 issued 1-16-98 to the Westcoast Hotel & Events Center for the 11th & 12th floors.
|
INSP - Final | 1/14/1998 | 1/14/1998 | 1/14/1998 | | PART |
|
|
|
/ / 333 - elevator tests
|
INSP - Conference | 1/12/1998 | 1/12/1998 | 1/12/1998 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Conference | 1/12/1998 | 1/12/1998 | 1/12/1998 | | PASS |
Tom Arcoraci
|
|
|
/ / 408 -
|
INSP - Final | 1/12/1998 | 1/12/1998 | 1/12/1998 | | PART |
|
|
|
/ / 333 -
|
INSP - Framing/Rough-in | 1/9/1998 | 1/9/1998 | 1/8/1998 | P | PASS |
|
|
|
01/09/98 333 - 13th floor framing ok
|
INSP - Ceiling grid | 1/8/1998 | 1/8/1998 | 1/8/1998 | | PART |
|
|
|
/ / 333 -
|
INSP - Conference | 1/5/1998 | 1/5/1998 | 1/5/1998 | | PART |
|
|
|
/ / 333 -
|
Print Occupancy Form | | | 1/2/1998 | | |
|
|
|
|
INSP - Final | 12/31/1997 | 12/31/1997 | 12/31/1997 | A | PART |
|
|
|
12/31/97 333 - all up to 10 ok for temp
|
Temporary occupancy | | | 12/31/1997 | | PASS |
|
|
|
Temp. Occ. Cert. 3527 issued 12-31-97 to the Westcoast Hotel and Events Center (for shell and core includsive of floor 10 and below as per Kim Maurer).
|
INSP - Final | 12/30/1997 | 12/30/1997 | 12/30/1997 | P | FAIL |
|
|
|
12/30/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 12/29/1997 | 12/29/1997 | 12/29/1997 | P | FAIL |
|
|
|
12/29/97 333 - cn not made
|
INSP - Final | 12/23/1997 | 12/23/1997 | 12/23/1997 | | PART |
|
|
|
/ / 333 -
|
INSP - Wall cover | 12/19/1997 | 12/19/1997 | 12/19/1997 | | PART |
|
|
|
/ / 333 -
|
INSP - Conference | 12/18/1997 | 12/18/1997 | 12/18/1997 | | PASS |
|
|
|
/ / 333 -
|
INSP - Conference | 12/15/1997 | 12/15/1997 | 12/15/1997 | P | PASS |
|
|
|
12/15/97 333 - talked about stair pressurization with Jackie
|
INSP - Conference | 12/12/1997 | 12/12/1997 | 12/12/1997 | | PASS |
|
|
|
/ / 333 -
|
INSP - Conference | 12/11/1997 | 12/11/1997 | 12/11/1997 | | PASS |
|
|
|
/ / 333 -
|
INSP - Framing/Rough-in | 12/9/1997 | 12/9/1997 | 12/9/1997 | | PART |
|
|
|
/ / 333 - 12th ceiling
|
INSP - Framing/Rough-in | 12/8/1997 | 12/8/1997 | 12/8/1997 | P | PART |
|
|
|
12/08/97 333 - 12th ok
|
INSP - Framing/Rough-in | 12/4/1997 | 12/4/1997 | 12/4/1997 | A | PART |
|
|
|
12/04/97 333 - ceilings ok
|
INSP - Framing/Rough-in | 12/3/1997 | 12/3/1997 | 12/3/1997 | | PASS |
|
|
|
/ / 333 - ceilings on 12 ok
|
INSP - Conference | 12/2/1997 | 12/2/1997 | 12/2/1997 | | PASS |
|
|
|
/ / 333 -
|
INSP - Framing/Rough-in | 11/28/1997 | 11/28/1997 | 11/28/1997 | | PART |
|
|
|
/ / 333 - 12TH CORRIDORS OK
|
INSP - Framing/Rough-in | 11/26/1997 | 11/26/1997 | 11/26/1997 | P | FAIL |
|
|
|
11/26/97 333 - cn not made 12th
|
INSP - Framing/Rough-in | 11/25/1997 | 11/25/1997 | 11/25/1997 | A | FAIL |
|
|
|
11/25/97 333 - cn 12th floor
|
INSP - Conference | 11/20/1997 | 11/20/1997 | 11/20/1997 | | PASS |
|
|
|
/ / 333 - firestoping 10
|
INSP - Framing/Rough-in | 11/19/1997 | 11/19/1997 | 11/19/1997 | A | PART |
|
|
|
11/19/97 333 - 8 ande 9 ok
|
INSP - Framing/Rough-in | 11/18/1997 | 11/18/1997 | 11/18/1997 | P | FAIL |
|
|
|
11/18/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED 9&10
|
INSP - Framing/Rough-in | 11/13/1997 | 11/13/1997 | 11/13/1997 | A | PART |
|
|
|
11/13/97 333 - 11th ok
|
INSP - Framing/Rough-in | 11/7/1997 | 11/7/1997 | 11/7/1997 | | PASS |
|
|
|
/ / 333 - 10 ok
|
INSP - Framing/Rough-in | 11/6/1997 | 11/6/1997 | 11/6/1997 | | FAIL |
|
|
|
/ / 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED 9th floor
|
INSP - Framing/Rough-in | 11/3/1997 | 11/3/1997 | 11/3/1997 | A | PART |
|
|
|
11/03/97 333 - 4th floor part
|
INSP - Framing/Rough-in | 10/31/1997 | 10/31/1997 | 10/31/1997 | A | PART |
|
|
|
10/31/97 333 - 7th floor all but corridir and end units
|
INSP - Framing/Rough-in | 10/30/1997 | 10/30/1997 | 10/30/1997 | A | PART |
|
|
|
10/30/97 333 - 7th in progress
|
INSP - Framing/Rough-in | 10/29/1997 | 10/29/1997 | 10/29/1997 | | PART |
|
|
|
/ / 333 - discussed dampers for shafe next to main elevator
|
INSP - Framing/Rough-in | 10/28/1997 | 10/28/1997 | 10/28/1997 | | PART |
|
|
|
/ / 333 - 8th floor corridor ok
|
INSP - Framing/Rough-in | 10/28/1997 | 10/28/1997 | 10/28/1997 | | PASS |
|
|
|
/ / 333 - 6th floor corridor ok
|
INSP - Framing/Rough-in | 10/27/1997 | 10/27/1997 | 10/27/1997 | P | PART |
|
|
|
8th floor all but corridor and north and south units
|
INSP - Stop Work Order | 10/24/1997 | 10/24/1997 | 10/24/1997 | | FAIL |
|
|
|
/ / 333 - glazing at grove patio without permit
|
INSP - Framing/Rough-in | 10/23/1997 | 10/23/1997 | 10/23/1997 | A | PART |
|
|
|
10/23/97 333 - 8th all but corridor and shafts
|
INSP-Conference | 10/22/1997 | 10/22/1997 | 10/22/1997 | P | PART |
|
|
|
meeting w/ pcl and sassco on outstanding issues, list given to all, copy to S hyde of Block 22
|
INSP - Stop Work Order | 10/22/1997 | 10/22/1997 | 10/22/1997 | | FAIL |
|
|
|
/ / 333 - glazing at grove no permit
|
INSP - Framing/Rough-in | 10/21/1997 | 10/21/1997 | 10/21/1997 | | PART |
|
|
|
/ / 333 - 7th corridor
|
INSP - Framing/Rough-in | 10/20/1997 | 10/20/1997 | 10/20/1997 | | FAIL |
|
|
|
/ / 333 - 7th floor CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Wall cover | 10/14/1997 | 10/14/1997 | 10/14/1997 | A | PART |
|
|
|
10/14/97 333 - ok to cover 6th corridors
|
INSP - Framing/Rough-in | 10/13/1997 | 10/13/1997 | 10/13/1997 | A | FAIL |
|
|
|
10/13/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPL
|
INSP - Wall cover | 10/10/1997 | 10/10/1997 | 10/10/1997 | P | FAIL |
|
|
|
10/10/97 333 - 6th floor not ready
|
INSP - Framing/Rough-in | 10/9/1997 | 10/9/1997 | 10/9/1997 | P | FAIL |
|
|
|
10/09/97 333 - 6th not ready
|
INSP - Framing/Rough-in | 10/8/1997 | 10/8/1997 | 10/8/1997 | | FAIL |
|
|
|
10/08/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPL 6TH FLOOR
|
INSP - Framing/Rough-in | 10/6/1997 | 10/6/1997 | 10/6/1997 | A | PART |
|
|
|
10/06/97 333 - corridor to not cover
|
INSP - Wall cover | 10/3/1997 | 10/3/1997 | 10/3/1997 | A | PART |
|
|
|
10/03/97 333 - ceilings at event level kit ok
|
INSP - Framing/Rough-in | 10/1/1997 | 10/1/1997 | 10/1/1997 | P | FAIL |
|
|
|
cn
|
INSP - Wall cover | 9/30/1997 | 9/30/1997 | 9/30/1997 | A | PASS |
|
|
|
09/30/97 333 - bathrooms ok
|
INSP - Framing/Rough-in | 9/29/1997 | 9/29/1997 | 9/29/1997 | | PART |
|
|
|
/ / 333 - part
|
INSP - Framing/Rough-in | 9/26/1997 | 9/26/1997 | 9/26/1997 | A | PART |
|
|
|
09/26/97 333 - cn placed
|
INSP - Framing/Rough-in | 9/22/1997 | 9/22/1997 | 9/22/1997 | | PART |
|
|
|
/ / 333 - part
|
INSP - Framing/Rough-in | 9/12/1997 | 9/12/1997 | 9/12/1997 | A | PART |
|
|
|
stairs
|
Routing for occupancy | 9/9/1997 | 9/10/1997 | 9/10/1997 | | PASS |
|
|
|
Art Musser inspected - 9/9/97 - Req. Bonding for Pavers, landscaping & etc. @ 110% - Bond posted for $248,600. on 9/10/97 - Temporary Signed (CAM)
|
INSP - Framing/Rough-in | 9/9/1997 | 9/9/1997 | 9/9/1997 | A | PART |
|
|
|
09/09/97 333 - 2nd floor corridor lid
|
INSP - Framing/Rough-in | 9/8/1997 | 9/8/1997 | 9/8/1997 | A | FAIL |
|
|
|
09/08/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 9/8/1997 | 9/8/1997 | 9/8/1997 | P | FAIL |
|
|
|
09/08/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Wall cover | 9/5/1997 | 9/5/1997 | 9/5/1997 | A | PART |
|
|
|
first floor arena level cn
|
INSP-Conference | 9/4/1997 | 9/5/1997 | 9/4/1997 | P | |
|
|
|
2:30
|
INSP-Sprinkler Rough-in/Hydro | 9/3/1997 | 9/4/1997 | 9/4/1997 | P | PART |
|
|
|
fire pump acceptance test 1pm to 4pm fire pump and controller passed, no alarm connection
|
INSP - Wall cover | 9/4/1997 | 9/4/1997 | 9/4/1997 | A | FAIL |
|
|
|
09/04/97 333 - 2nd floor lids not corrected
|
INSP-Sprinkler Rough-in/Hydro | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | FAIL |
|
|
|
refer pressure at 1:30, not ready at 3:30 event rough in complete, 3/4 of level capped or incorrect informed j trach that fuel tank installer was not running emergency vent outside
|
INSP - Framing/Rough-in | 9/3/1997 | 9/3/1997 | 9/3/1997 | | FAIL |
|
|
|
/ / 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Sprinkler Rough-in/Hydro | 9/2/1997 | 9/2/1997 | 9/2/1997 | P | FAIL |
|
|
|
HYDRO REFER PIPING NOT READY, LEAKS ROUGH-IN, EVEENT LEVEL....MOST NOT COMPLETE, MAKING LIST
|
INSP - Carpentry | 9/2/1997 | 9/2/1997 | 9/2/1997 | | PASS |
|
|
|
/ / 333 - GEN -GENERAL INSPECTION
|
INSP - Conference | 8/29/1997 | 8/29/1997 | 8/29/1997 | | PASS |
|
|
|
/ / 333 - met with John C
|
INSP - Carpentry | 8/28/1997 | 8/28/1997 | 8/28/1997 | A | PASS |
|
|
|
08/28/97 333 - meeting about elect
|
INSP - Conference | 8/27/1997 | 8/27/1997 | 8/27/1997 | | PASS |
|
|
|
/ / 333 - met with powers
|
INSP - Carpentry | 8/26/1997 | 8/26/1997 | 8/26/1997 | | PASS |
|
|
|
/ / 333 - talked to Jackie about inspections
|
INSP - Conference | 8/25/1997 | 8/25/1997 | 8/25/1997 | | PASS |
|
|
|
/ / 333 - met with rich and jackie
|
INSP - Conference | 8/21/1997 | 8/21/1997 | 8/21/1997 | A | PASS |
|
|
|
08/21/97 333 - met with arch and pcl floyd george other inspectors
|
INSP - Conference | 8/21/1997 | 8/21/1997 | 8/21/1997 | | PASS |
|
|
|
/ / 333 - met with john
|
INSP-Conference | 8/20/1997 | 8/21/1997 | 8/21/1997 | A | PART |
|
|
|
ice making to be with r22, no h occupancy, fuel tanks to be in h3's, questions in providing ventilation per code, want exception to sprinkling floors 6 through 13. will arrainge meeting.
|
INSP - Conference | 8/21/1997 | 8/20/1997 | 8/20/1997 | P | PASS |
|
|
|
accepted reqsuest on pool piping
|
INSP-Conference | 8/18/1997 | 8/18/1997 | 8/18/1997 | A | PART |
|
|
|
conference with skip hyde re rated tank substitution for control area. discussed use as liquid storage room, requirements for equivalence to code intent
|
INSP - Framing/Rough-in | 8/18/1997 | 8/18/1997 | 8/18/1997 | | FAIL |
|
|
|
08/18/97 333 - cn on visqueen and plumbing penetrations
|
INSP - Framing/Rough-in | 8/15/1997 | 8/15/1997 | 8/15/1997 | | PART |
|
|
|
08/15/97 333 - ok to cover 3rd floor corridor
|
INSP-Conference | 8/15/1997 | 8/15/1997 | 8/15/1997 | P | PART |
|
|
|
MEETING WITH jACKIE OF pcl ON NEW STORAGE TANK IDEA. DISCUSSED LOCATIONS AND SUBMITTAL FORM. PCL TO PREPARE PROPOSAL FOR CONSIDERATION OF THE TANK AS A ALTERNATIVE TO LIQUID STORAGE ROOM ADDRESSING EACH CODE REQUIREMENT IN 91 UFC AND HOW THEIR DESIGN IS EQUIVALENT
|
INSP - Framing/Rough-in | 8/14/1997 | 8/13/1997 | 8/13/1997 | P | FAIL |
|
|
|
checked cn on 3rd floor
|
INSP - Conference | 8/12/1997 | 8/12/1997 | 8/12/1997 | | PASS |
|
|
|
/ / 333 - met with John talked about firestoping at sinks and 2nd and
|
INSP-Conference | 8/12/1997 | 8/12/1997 | 8/12/1997 | P | PART |
|
|
|
meeting on site w/ hyde of block 22 and joyce of HNTB amd pcl reps. discussed fuel storage options, will reply in writing on fire pump fuel capacity requirements and proposals
|
INSP - Resubmittals | 8/8/1997 | 8/8/1997 | 8/8/1997 | P | PASS |
|
|
|
08/08/97 333 - recieved plan for temp
|
INSP - Carpentry | 8/7/1997 | 8/7/1997 | 8/7/1997 | | PASS |
|
|
|
/ / 333 - talked to John about PVC pipe
|
INSP - Carpentry | 8/6/1997 | 8/6/1997 | 8/6/1997 | | PASS |
|
|
|
/ / 333 - asked Marlene for all transmittals from Seattle about all is
|
INSP - Carpentry | 8/5/1997 | 8/5/1997 | 8/5/1997 | | PASS |
|
|
|
/ / 333 - met with archetect and pcl about fire issues
|
INSP - Carpentry | 8/4/1997 | 8/4/1997 | 8/4/1997 | A | PASS |
|
|
|
reviewed firestoping requirements
|
INSP - Wall cover | 8/1/1997 | 8/1/1997 | 8/1/1997 | A | FAIL |
|
|
|
08/01/97 333 - talked with John Cunningham about refer room and desel st
|
INSP - Carpentry | 7/31/1997 | 7/31/1997 | 7/31/1997 | | FAIL |
|
|
|
/ / 333 - met with subs about anular space at firestops and slopy job
|
INSP - Carpentry | 7/31/1997 | 7/31/1997 | 7/31/1997 | | FAIL |
|
|
|
/ / 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Wall cover | 7/28/1997 | 7/28/1997 | 7/28/1997 | | PASS |
|
|
|
/ / 333 - 3rd floor in progress
|
INSP - Conference | 7/25/1997 | 7/25/1997 | 7/25/1997 | A | PASS |
|
|
|
/ / 333 - in progress
|
INSP - Conference | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | PASS |
|
|
|
07/23/97 333 - review shaft requirements at pizza hut
|
INSP - Carpentry | 7/23/1997 | 7/22/1997 | 7/23/1997 | P | PASS |
|
|
|
/ / 333 - met with Rich
|
INSP - Framing/Rough-in | 7/21/1997 | 7/21/1997 | 7/21/1997 | A | PART |
|
|
|
/ / 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED 3rd floor
|
INSP - Carpentry | 7/21/1997 | 7/21/1997 | 7/21/1997 | A | PART |
|
|
|
07/21/97 333 - pool resubmittal to Carl W
|
INSP - Framing/Rough-in | 7/18/1997 | 7/18/1997 | 7/18/1997 | A | PART |
|
|
|
/ / 333 - 3rd floor partial
|
INSP-Sprinkler Rough-in/Hydro | 7/17/1997 | 7/17/1997 | 7/17/1997 | A | FAIL |
Joe Tawney
|
|
|
walkthrough of floors 1-6 and penthouse for sprinkler locations and bracing. plans not available, bracing not complete, some obstructions noted, all areas not covered, porte coutre not covered
|
INSP - Carpentry | 7/11/1997 | 7/11/1997 | 7/11/1997 | | PART |
|
|
|
07/14/97 333 - reviewed floor sinks and firestoping in arena
|
INSP - Carpentry | 7/10/1997 | 7/10/1997 | 7/10/1997 | | PASS |
|
|
|
07/09/97 333 - second floor in progress of cover
|
INSP-Sprinkler Rough-in/Hydro | 7/7/1997 | 7/8/1997 | 7/8/1997 | A | PASS |
Joe Tawney
|
|
|
07/08/97 406 - PLEASE GO OUT AT 10:00 UNITED WATER IS SCHEDULED AT THE S OK ON UNDERGROUND FLUSH
|
INSP - Carpentry | 7/6/1997 | 7/6/1997 | 7/6/1997 | | PASS |
|
|
|
07/06/97 333 - reviewed site
|
INSP - Carpentry | 7/2/1997 | 7/2/1997 | 7/2/1997 | | PASS |
|
|
|
/ / 333 - met with Jackie about shaft details gave resubmittal for 4th floor to plan review
|
INSP - Wall cover | 7/1/1997 | 7/1/1997 | 7/1/1997 | A | PART |
|
|
|
07/01/97 333 - second floor partial
|
INSP - Conference | 6/30/1997 | 6/27/1997 | 6/27/1997 | P | PASS |
|
|
|
second floor
|
INSP - Conference | 6/27/1997 | 6/26/1997 | 6/26/1997 | P | PASS |
|
|
|
met with Rich
|
INSP - Framing/Rough-in | 6/19/1997 | 6/19/1997 | 6/19/1997 | | FAIL |
|
|
|
06/18/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPL
|
INSP - Framing/Rough-in | 6/19/1997 | 6/19/1997 | 6/19/1997 | | FAIL |
|
|
|
06/18/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPL
|
(F) Reprint permit | | | 6/18/1997 | | |
|
|
|
|
INSP - Conference | 6/18/1997 | 6/17/1997 | 6/17/1997 | P | PASS |
|
|
|
met with architect and owners about requirements for temp for arena only
|
INSP - Conference | 6/16/1997 | 6/16/1997 | 6/16/1997 | | PASS |
|
|
|
06/15/97 333 - 2nd floor dampers ok
|
INSP - Framing/Rough-in | 6/11/1997 | 6/11/1997 | 6/11/1997 | | PART |
|
|
|
/ / 333 - 2nd floor framing ok to cover all but shafts dampers not in need to look at floor closure at stair/elevator shaft
|
INSP - Conference | 6/10/1997 | 6/10/1997 | 6/9/1997 | P | PASS |
|
|
|
06/10/97 333 - sent letter To John C
|
INSP - Framing/Rough-in | 6/9/1997 | 6/9/1997 | 6/9/1997 | P | FAIL |
|
|
|
dampers not in
|
INSP - Framing/Rough-in | 6/4/1997 | 6/4/1997 | 6/4/1997 | | FAIL |
|
|
|
/ / 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 6/4/1997 | 6/4/1997 | 6/4/1997 | | FAIL |
|
|
|
06/04/97 333 - CN PLACED
|
INSP - Carpentry | 5/21/1997 | 5/21/1997 | 5/21/1997 | | PASS |
|
|
|
/ / 333 - met with Rich left letter for John
|
INSP - Conference | 5/11/1997 | 5/11/1997 | 5/11/1997 | | PASS |
|
|
|
/ / 333 - met with John Cunningham
|
INSP - Conference | 5/11/1997 | 5/11/1997 | 5/11/1997 | | PASS |
|
|
|
/ / 333 - met with Rich
|
INSP - Conference | 5/11/1997 | 5/11/1997 | 5/11/1997 | | PASS |
|
|
|
/ / 333 - reviewed submittal
|
INSP - Conference | 5/7/1997 | 5/7/1997 | 5/7/1997 | | PASS |
|
|
|
/ / 333 - worked on letter about dampers talked with ISI about 1 hr exterior walls
|
INSP - Conference | 5/7/1997 | 5/7/1997 | 5/6/1997 | P | PASS |
|
|
|
05/07/97 333 - met with all subs about firestoping
|
INSP - Conference | 5/4/1997 | 5/4/1997 | 5/4/1997 | | PASS |
|
|
|
/ / 333 - reviewed firestoping with Bob
|
INSP - Conference | 4/30/1997 | 4/30/1997 | 4/30/1997 | | PASS |
|
|
|
/ / 333 - sent letter of transmittal to John
|
INSP - Conference | 4/28/1997 | 4/28/1997 | 4/28/1997 | | PASS |
|
|
|
/ / 333 - sent Letter Of Transmittal to John Cunningham
|
INSP - Conference | 4/27/1997 | 4/27/1997 | 4/27/1997 | | PASS |
|
|
|
/ / 333 - approved firestop method at efis panels at floor
|
INSP - Conference | 4/24/1997 | 4/24/1997 | 4/24/1997 | | PASS |
|
|
|
/ / 333 - sent letter of transmittal about firestop at floor lines
|
INSP - Conference | 4/20/1997 | 4/20/1997 | 4/20/1997 | | PASS |
|
|
|
/ / 333 - reviewed details with rich
|
INSP - Carpentry | 4/16/1997 | 4/16/1997 | 4/16/1997 | | PASS |
|
|
|
/ / 333 - in progress
|
INSP - Conference | 4/13/1997 | 4/13/1997 | 4/13/1997 | | PASS |
|
|
|
/ / 333 - MET WITH RICH FIRESTOPING AT WALL TO BEAM ATTACHMENT EXTERIOR WALLS OK
|
INSP - Conference | 4/7/1997 | 4/7/1997 | 4/6/1997 | A | PASS |
|
|
|
04/07/97 333 - talked to mti met with rich
|
INSP - Carpentry | 3/26/1997 | 3/26/1997 | 3/26/1997 | | PASS |
|
|
|
/ / 333 - framing in progress asked elect plumbing and mech for firestopping submittals
|
INSP - Carpentry | 3/24/1997 | 3/24/1997 | 3/24/1997 | | PASS |
|
|
|
/ / 333 - talked about wood cap at parapet
|
INSP - Conference | 3/24/1997 | 3/24/1997 | 3/23/1997 | P | PASS |
|
|
|
03/24/97 333 - talked to elect , plumb , and mech about submittals for f looked at framing west and south walls need detail for top connection 1hr wall as asked for in transmittal of last week
|
INSP - Conference | 3/20/1997 | 3/20/1997 | 3/20/1997 | A | PASS |
|
|
|
checked west and south fire wraps on beams
|
INSP - Conference | 3/7/1997 | 3/7/1997 | 3/6/1997 | P | PASS |
|
|
|
03/07/97 333 - sent letter of transmittal
|
INSP - Conference | 3/5/1997 | 3/6/1997 | 3/5/1997 | A | PASS |
|
|
|
03/06/97 333 - TALKED ABOUT FIREWALLS
|
INSP - Conference | 3/4/1997 | 3/5/1997 | 3/4/1997 | A | CANC |
|
|
|
03/05/97 333 - resent for thursday
|
INSP - Framing/Rough-in | 2/19/1997 | 2/19/1997 | 2/18/1997 | P | FAIL |
|
|
|
02/19/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
(F) Reprint permit | | | 12/10/1996 | | |
|
|
|
|
Routing Off Site - A.C.H.D | 12/2/1996 | | 12/6/1996 | | PASS |
|
|
|
PACKAGE #3 CONTACTED PDQ TO TAKE PLANS OUT TO ACHD ////////12/06/96 RECEIVED CALL FROM ACHD INDICATING NO ADDITIONAL FEES OR CHANGES. RGG
|
Routing - PUBLIC WORKS | 12/2/1996 | | 12/6/1996 | | PASS |
|
|
|
PACKAGE #5 CONSTRUCTION DRAWINGS FOR MONITORING STATION AND SIGNED AGREEMENT REQUIRED. NEED CIVIL PLANS - CONTACT JOHN JOHNSON. 12/05/96 DAR ///////12/06/96 RECEIVED E-MAIL FROM J. WILLIAMS APPROVING THE RESUBMITTALS, WILL RETURN THE DRAWINGS TO PC.
|
Routing - PLANNING | 12/2/1996 | | 12/6/1996 | | PASS |
|
|
|
PACKAGE #4 X-ref: DDR-23-95, CU-19-95. Approved by RLB & TKW.
|
Routing - PUBLIC WORKS | 6/26/1996 | | 12/6/1996 | | PASS |
|
|
|
11/6/96 - Plans as originally submitted have been revised. Revisions have not been received as of this date, therefore plans cannot be approved at this time. ////////12/6/96 E-MAIL FROM J. WILLIAMS INDICATED THAT THE REVISED DRAWINGS HAVE BEEN APPROVED AND ARE BEING SIGNED OFF BY C. MICKELSON.
|
Routing - PLAN CHECK | 12/6/1996 | | 12/6/1996 | | |
|
|
|
PACKAGE #5
|
Routing - FIRE | 12/5/1996 | | 12/6/1996 | | PASS |
|
|
|
12/3/96 THE FIRE DEPARTMENT PLANS REVIEWER (DAVID S. MILLER) CONFIRMED FROM THE FIRE CHIEF THAT AN ORDER FROM THE MAYER STATES "THE PERMIT FOR THESE PLANS IS TO BE ISSUED BY FRIDAY 12/6/96"...
|
Routing - PLAN CHECK | 12/6/1996 | | 12/6/1996 | | |
|
|
|
PACKAGE #4
|
Routing - PUBLIC WORKS | 12/5/1996 | | 12/6/1996 | | PASS |
|
|
|
PACKAGE #5
|
Inspection Record Card- Bld | | | 12/6/1996 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/1996 | | PASS |
|
|
|
REVIEWED AS NOTED ON PLANS.
|
Issue PAID IN FULL permit | | | 12/6/1996 | | |
|
|
|
|
Print Occupancy Form | | | 12/6/1996 | | |
|
|
|
|
Routing - PLAN CHECK | 12/5/1996 | | 12/6/1996 | | PASS |
|
|
|
PACKAGE #5, REVIEWED AND APPROVED WITH CONDITIONS AND GENERAL NOTES. SEE PC#153-96 IN FILE.
|
Routing - PLAN CHECK | 12/5/1996 | | 12/5/1996 | | |
|
|
|
|
Routing - PLAN CHECK | 12/2/1996 | | 12/5/1996 | | PASS |
|
|
|
PACKAGE #1 approved with a 12 pages of clarification and general notes. ////// RETURNED PLANS TO FIRE DEPARTMENT FOR SIGNATURE AND APPROVAL. ////// ON 12/3/96 THE BUILDING PLANS EXAMINER (ROBERT G GARRISON) CONFIRMED FROM THE BUILDING DIRECTOR THAT AN ORDER FROM THE MAYER STATED "THE PERMIT FOR THOSE PLANS IS TO BE ISSUED BY FRIDAY 12/6/96".
|
Routing - FIRE | 11/29/1996 | | 12/2/1996 | | PEND |
|
|
|
PACKAGE #1 TO BOB 12/02/96 PENDING, REVIEWED BUT NOT APPROVED
|
Routing Off Site - C.D.H | 11/29/1996 | | 12/2/1996 | | PASS |
|
|
|
PACKAGE #3 BOB JUE CALLED 11-29-96 AND SAID CAROL JOHNSON WILL BE IN TO REVIEW. CAROL CAME IN TO OUR OFFICE TO REVIEW PLANS AND DECIDED TO TAKE PLANS OUT TO CDH TO LET BOB JUE LOOK AT THEM. KMM 11-29-96. CDH IS RETAINING THEIR SET OF PLANS. CAROL JOHNSON SIGNED OFF ON P&Z'S COPY.
|
Routing Off Site -ICBO/SEATTLE | 4/30/1996 | | 11/27/1996 | | PASS |
|
|
|
SENT 1 SET OF PLANS, 1 COPY SPECIFICATIIONS , 1 FIRE PROTECTION MANUEL, MECH, AND ELEC.//////11/27/96 recieved corrected plans from ICBO Seattle. Note! Plans noted (NOT FOR CONSTRUCTION) notified architect to forward clean sets.//////12/06/96 CONTACTED CHUCK WILLIAMS IN SEATTLE, ASKED FOR FINAL LETTER ON THE WESTCOAST HOTEL
|
Plan resubmittals received | | | 11/27/1996 | | |
|
|
|
Received 5 sets of plans from architect at the request of T. Hogland. (See routing to individual agencies - plans referred to as "packages")
|
Routing - PLANNING | 10/9/1996 | | 11/23/1996 | | FAIL |
|
|
|
returned to PC.
|
(F) Reprint permit | | | 11/13/1996 | | |
|
|
|
|
Routing - PLUMBING | 9/26/1996 | | 10/9/1996 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 7/8/1996 | | 9/25/1996 | | |
|
|
|
CONTACTED DAVID NUSS FOR ACHD PICKUP AT ###-####
|
(F) Reprint permit | | | 7/24/1996 | | |
|
|
|
|
90 day tracking............. | | 3/27/1996 | 6/25/1996 | | PASS |
|
|
|
|
Routing Off Site - A.C.H.D | 4/2/1996 | | 6/25/1996 | | PASS |
|
|
|
CONTACTED DAVID NUSS FOR ACHD PICKUP AT ###-####
|
Routing Off Site - C.D.H | 4/2/1996 | | 6/25/1996 | | |
|
|
|
CONTACTED DAVID NUSS FOR CDH PICKUP AT ###-####
|
Plan resubmittals received | | | 5/2/1996 | | PASS |
|
|
|
3 SETS OF RESUBMITTALS RECEIVED. SET ONE OF THREE BEING SENT TO ICBO. SETS 2 AND 3 ON HOLD IN BACK ROON UNTIL PLANS ARE BACK FROM ACHD AND CDH.
|
Plan assigned to (RGG) | 5/2/1996 | | 5/2/1996 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/2/1996 | | PASS |
|
|
|
|
GAY'S RECEIPT FOR PARTIAL PAY | | | 3/28/1996 | | |
|
|
|
|
Received Certificate of Value | | | 3/27/1996 | | PASS |
|
|
|
|
Application received | | | 3/27/1996 | | |
|
|
|
|
GAY'S RECEIPT FOR PARTIAL PAY | | | 3/27/1996 | | |
|
|
|
|
Plans taken to Plan Check | | | 3/27/1996 | | PASS |
|
|
|
|