Permit Information
Permit NumberBLD96-00745
StatusFinaled
Name WRIGHT COMMUNITY CHURCH
Site Address 4821 W FRANKLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
**WRIGHT CONGREGATIONAL UNITED CHURCH OF CHRIST** This building is not fire sprinkled. To remodel an existing church and to construct an addition totalling 1,975 square feet on 3 levels. When completed the basement will be 4,913 sq. feet, the first floor will be 5,028 sq. feet, and the second floor will be 3,041 sq. feet. Work is to include concrete footings, concrete foundations, masonry walls, interior walls, 1-hr stair enclosure, six (6) restrooms accessible to the disabled, 1-hr fire-resistive corridor system, and an elevator shaft all per approved drawings, engineering, and plan check notes on file. Separate electrical, plumbing, and mechanical permits are required. PC-166-96 **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/200011/2/200011/2/2000APASS
DetailsDave Hannah
dick- ###-#### fn--re-insp
Permanent Occupancy 11/2/200011/2/2000 DONE
Details
Override - Parcel Holds  11/2/2000  
Permanent occupancy  11/2/2000 DONE
Perm. Occ. Cert. #8455 issued 11-2-00 to Wright Community Church.
Override - Parcel Holds  11/1/2000  
Override - Parcel Holds  11/1/2000  
BLD-Conference8/30/20008/30/20008/30/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/30/2000 w carpenter re c/n
BLD-Final8/14/20008/14/20008/14/2000PFAIL
DetailsCarl Dependahl
###-#### ; c/n, guard rail, 1hr "seal " at rated lids at stairs, ADA rrm grab bar, etc. ok for t/o 8/14/2000 4:28:08 PM
BLD-Conference8/14/20008/14/20008/14/2000PPART
Details
Scheduled by Inspector: 338 On 8/14/2000 info for 340 8/14/2000 4:36:49 PM
Override - Parcel Holds  8/14/2000  
Override - Parcel Holds  8/14/2000  
FIRE-Final Inspection7/18/20007/18/20007/18/2000PPASS
DetailsJoe Tawney
re-insp fn-- jack-- wenskey-- ###-#### Reinsp. ok for certificate of completion. 7/19/00 10:06:25 AM
Override - Parcel Holds  7/18/2000  
FIRE-Final Inspection7/6/20007/6/20007/6/2000PFAIL
DetailsJoe Tawney
Jack ###-#### Reinsp. fail smoke detectors & inspection opening. 7/7/00 1:22:41 PM
Override - Parcel Holds  7/6/2000  
FIRE-Final Inspection5/23/20005/23/20005/23/2000PFAIL
DetailsJoe Tawney
only there till 4 pm Jack ###-#### Reinsp. fail 3 items still not connected 5/24/00 11:14:15 AM
Override - Parcel Holds  5/23/2000  
BLD-Conference2/8/20002/8/20002/8/2000PPASS
DetailsCarl Dependahl
Rod ###-#### met with plumber (Terrel Plbg , Rod) : Put proposal on paper for review.
BLD-Final1/4/20001/5/20001/5/2000AFAIL
DetailsCarl Dependahl
###-#### HOME ###-#### CHURCH. Need P&Z & fire.. no insp. performed.
FIRE-Final Inspection11/23/199911/24/199911/24/1999AFAIL
DetailsJoe Tawney
RICHARD--- ###-#### FN FIRE Final fail C/N issued.
FIRE-Final Inspection11/22/199911/23/199911/23/1999PNR
DetailsJoe Tawney
Dick palmer ###-#### ready after 9am Final not ready for insp. To be rescheduled.
BLD-Final9/20/19999/22/19999/22/1999AFAIL
DetailsCarl Dependahl
robin--church sec ###-#### fn insp-CALL 1ST BEFORE INSP Conf. W/Dick Palmer, Proj. Mgr.. Need card & plans onsite
INSP-Conference11/18/199811/19/199811/19/1998APART
DetailsJoe Tawney
11/19/98 406 - BRIAN ###-#### FOR CONF PRE FINAL CONF ON EXITS, LIGHTS, DOORS,AND EXT
INSP - Framing/Rough-in7/13/19987/14/19987/14/1998ACANC
Details
07/14/98 338 - partial framing dick ###-####
INSP - Framing/Rough-in2/26/19982/27/19982/27/1998APASS
Details
02/27/98 333 - FRAM-OK FRAMING
INSP - Framing/Rough-in2/24/19982/25/19982/25/1998APART
Details
02/25/98 333 - bathrooms and nursery onlyrichard ###-####
INSP - Conference11/19/199711/20/199711/20/1997APASS
Details
questions on the corridor walls and the rated floor ceiling assys ok to rock 1 side of framing to show trus fire block placement
INSP - Conference11/18/199711/19/199711/19/1997ACANC
Details
cancelled till 11-20-97 at 11 :oo
INSP - Framing/Rough-in11/14/199711/18/199711/18/1997ANR
Details
11/18/97 333 - will reschedule
INSP - Conference11/3/199711/13/199711/13/1997PPASS
Details
###-#### call first {dick palmer} dave patterson
INSP - Carpentry6/3/19976/3/19976/3/1997 PASS
Details
/ / 338 -
INSP - Carpentry6/3/19976/3/19976/3/1997PCANC
Details
06/03/97 338 - post til 06-04-97
INSP - Framing/Rough-in5/19/19975/19/19975/19/1997PNR
Details
/ / 333 - not ready OTH-OTHER AGENCIES NOT APPROVED
INSP - Masonry5/1/19975/1/19975/1/1997PPART
DetailsCarl Dependahl
05/01/97 340 - GROUT; PENDING SPEC INSP REPORT, APPEARS OK
INSP - Masonry4/29/19974/29/19974/29/1997PPART
DetailsCarl Dependahl
04/29/97 340 - mti onsite for grout pour, spoke w/ supt. pending spec in
INSP - Masonry4/24/19974/25/19974/25/1997APASS
Details
04/25/97 338 - made ok with sp insp approval
INSP - Masonry4/21/19974/21/19974/21/1997PPASS
Details
04/22/97 338 - GROUT made ok with sp insp approval
INSP - Masonry4/18/19974/21/19974/21/1997APASS
Details
04/22/97 338 - pouring 2 yards. made ok with sp insp ok
INSP - Masonry4/18/19974/18/19974/18/1997PPASS
Details
04/18/97 338 - elevator shaft made ok
INSP - Masonry4/15/19974/16/19974/16/1997PPASS
Details
/ / 338 - made ok RAM-OK FRAMING
INSP - Framing/Rough-in4/7/19974/7/19974/6/1997PPART
Details
04/07/97 338 - partial ok to start cover on one side of the basement cor allowed in the corridor wall
INSP - Framing/Rough-in3/31/19973/31/19973/30/1997PNR
Details
/ / 338 - new hood is installed appears tro be to an existing shaft ca they will get back to me
INSP - Foundation11/8/199611/8/199611/8/1996P
Details
FND. STEM WALL
INSP - Foundation10/28/199610/29/199610/29/1996PPASS
Details
10/29/96 338 - made ok r-bar placed BASEMENT
INSP - Framing/Rough-in10/25/199610/25/199610/25/1996PNR
Details
10/25/96 339 - nobody there
INSP - Framing/Rough-in10/24/199610/24/199610/25/1996PNR
Details
10/24/96 338 - nobody home
INSP - Foundation10/7/199610/7/199610/6/1996PPASS
Details
10/08/96 338 -
INSP - Framing/Rough-in9/30/19969/30/19969/26/1996PNR
Details
09/30/96 338 - PARTIAL FRAME???
INSP - Foundation8/1/19968/2/19968/2/1996APASS
Details
pass, 325
INSP - Footings7/31/19968/1/19967/31/1996APASS
Details
CURT - ###-####. YOU WERE DOING THIS WED.P.M.
90 day tracking............. 4/1/19966/30/1996 PASS
INSP - Conference6/28/19966/28/19966/28/1996 PASS
Details
/ / 338 - UPDATE WP
Permit taken to Permit Desk  6/27/1996 PASS
Inspection Record Card- Bld  6/27/1996
Plan Reviewer's Copy of Permit  6/27/1996
ISSUE OCCUPANCY FORM  6/27/1996
Issue PAID IN FULL permit  6/27/1996
Plan Received by (CJW)5/6/1996 6/27/1996 PASS
DetailsCarl Westfall
06/27/96 11:49:25 CJW - this action updated by action script from <<>> in Case No. BLD96-0745
Routing - BUILDING5/14/1996 6/26/1996 PASS
Drawings approved after resubmittal review.
Plan resubmittals received6/26/1996 6/18/1996 PASS
Drawings approved after resubmittal review.
Routing - FIRE5/9/1996 5/14/1996 PASS
Plan resubmittals requested5/9/1996 5/9/1996
Gave plan review to the Architect. Nine (9) items require a response,
Meeting  5/9/1996
Had a meeting with Ty Morrison, Architect and went through each item on the plan review list. He took his copy and said he would probably not respond until after Memorial Day.
Plan Reviewer's Copy of Permit  5/9/1996
Routing - BUILDING4/19/1996 5/9/1996 FAIL
Plan review completed and copy given to architect.
Routing - MECHANICAL4/16/1996 4/19/1996 PASS
Routing - PLUMBING4/11/1996 4/16/1996 PASS
Routing - PUBLIC WORKS4/9/1996 4/10/1996 PASS
Routing - PLANNING4/5/1996 4/8/1996 PASS
X-ref: AA-119-94. Approved by SR.
Meeting  4/5/1996
Met with Ty Morrison, project Architect. He requested approval for some "ceremonial" demolition to take place on Sunday April 7, 1996. I told him that work with a value less than $500 did not require a permit. The scope of demolition he proposed did not exceed $500 in value. We talked about asbestos and he explained that an evaluation was scheduled to take place soon. I said we could get him a demolition and excavation permit after he submitted a cert. of value for that work only.
Plan routing begun/NEW & ADDTN  4/3/1996
Route to Ada County Highway District, Planning, Public Works, Plumbing then back to Plan Check. After Plan Check route to Fire Department.
Plans taken to Plan Check  4/1/1996 PASS
Received Certificate of Value  4/1/1996 PASS
Application received  4/1/1996
GAY'S RECEIPT FOR PARTIAL PAY  4/1/1996
Case Summary (BLD)     
Case Summary (BLD)     
Unassigned to Plan Reviewer4/1/1996  
Routing - BUILDING5/14/1996   PEND
Routing - BUILDING4/19/1996   PEND